2015-06-09 CC Agenda PacketPLEASE TURN OFF ALL CELL PHONES & PAGERS IN COUNCIL CHAMBERS.
CITY OF MOUND MISSION STATEMENT: The City of Mound, through teamwork and cooperation, provides at a reasonable
cost, quality sei vices that respond to the needs of all citizens, fostering a safe, attractive and flourishing community.
AGENDA
MOUND CITY COUNCIL TUESDAY, JUNE 9, 2015 — 7:00 PM
REGULAR MEETING MOUND CITY COUNCIL CHAMBERS
*Consent Agenda. Items listed under the Consent Agenda are considered routine in nature and will be enacted by a single roll call
vote. There will be no separate discussion of these items unless a Council Member or Citizen so requests. In that event the item will
be removed, from the Consent Agenda and considered in normal sequence.
Page
1. Open meeting
2. Pledge of Allegiance
3
4
Approve agenda, with any amendments
*Consent Agenda
*A. Approve payment of claims 1399 -1422
*B. Approve minutes: May 26, 2015 regular meeting 1423 -1428
*C. Adopt Resolution Approving Public Lands Permit for 4730 Galway Road 1429 -1437
Dredge Project
*D. Approve Pay Request No. 2 from Geislinger & Sons, Inc., in the amount of 1438 -1439
$198,597.97, for the 2014 Street, Utility and Retaining Wall Improvements -
West Three Points Boulevard Utilities, City Project No. PW -14 -01
*E. Approve Pay Request No. 2 from Widmer Construction, LLC, in the amount 1440 -1441
of $15,472.81, for work on the Bartlett Boulevard Watermain Improvement
Project, City Project No. PW -15 -09
*F. Approve payment of invoice by Braun Intertee in the amount of $1,021.75, 1442 -1445
for construction testing services, City Project PW -14 -01
*G. Adopt Resolution for Public Gathering Permit for 2015 Dog Days Special 1446 -1447
Event and Reducing the Fee Due to Public Purpose of Gathering: Aug 22, 2015
*H. Adopt Public Gathering Permit for 2015 Fishing for Life special event at Surfside 1448 -1452
Park and Beach
*L Adopt Resolution Approving Variance for 5079 Bartlett Boulevard (Planning 1453 -1458
Case No. 15 -01)
*7. Adopt Resolution for Public Gathering Permit for 2015 Music In the Park 1459 -1464
special events at Surfside Park and Beach and Waiving Fees Due to Public
Purpose of Gathering.
PLEASE TURN OFF ALL CELL PHONES & PAGERS IN COUNCIL CHAMBERS.
5. Comments and suggestions from citizens present on any item not on the agenda.
(Limit to 3 minutes per speaker.)
6. Dan Faulkner, City Engineer of Bolton & Menk, presenting the 2014 Storm Water
Pollution Prevention Program (SWPPP) Annual Report, and meeting the Public
Meeting Requirement
7. Scott Qualle, Building Official, requesting discussion/consideration /any necessary
action regarding uncompleted building repairs at 3243 Warner Road
8. Information /Miscellaneous
A. Comments /reports from Councilmembers /City Manager
B. Minutes: Docks & Commons Commission (Draft): May 21, 2015
C. Reports: Finance Department: Apr 2015 YTD
Harbor Wine & Spirits: May 2015
D. Correspondence:
9. Adjourn
1465 -1467
1468 -1469
1470 -1473
1474 -1476
1477
Note: This is a preliminary agenda and subject to change. The Council will set a final agenda at the meeting. More current meeting
agendas may be viewed at City Hall or at the City of Mound web site: u_rs t rr,r firm u G caea.
COUNCIL BRIEFING
June 9, 2015
Upcoming Events Schedule: Don't Forget!!
June 6 -- 3 -12:00 -- Mound Fire Department Fish Fry and Dance
June 9 — 6:55 — HRA regular meeting
June 9 — 7:00 — CC regular meeting
June 10 -- 8:00am -- Police Commission Meeting -- Mayor Wegscheid and /or Council Member Gesch
June 23 — 6:55 — HRA regular meeting
June 23 — 7:00 — CC regular meeting
June 25 -- 4 -6:00 -- Surfside Beer unveiling at HW &S, with party to follow at Dakota Junction (6:15)
July 11 -- Open House at Orono City Hall -- City Hall expansion and garages for police cars
July 14 — 6:55 — HRA regular meeting
July 14 — 7:00 — CC regular meeting
July 16 -18 -- Spirit of the Lakes Festival - Kick -Off is 5:00 Thurs at Surfside Park & Beach
July 28 — 6:55 — HRA regular meeting
July 28 — 7:00 — CC regular meeting
Aug 4 -- Night to Unite - Organized neighborhood and block parties - Council Members may ride along.
Aug 11 — 6:55 — HRA regular meeting
Aug 11 — 7:00 — CC regular meeting
Aug 22 -- Westonka Dog Days Festival - (new date)
Aug 25 — 6:55 — HRA regular meeting
Aug 25 — 7:00 — CC regular meeting
Sept 9 -- 8:00 -- Police Commission Meeting - Mayor Wegscheid
Sept 12 -- Running of the Bays
Sept 19 -- 5 -11:00 -- Taste of Tonka
Oct 10 -- Farmers' Market & More grand finale'
Oct 30 -- Seasonal Hours end
Nov 1 -- Daylight Saving Time ends
Nov 19 -- 6:00 -- Tree Lighting Ceremony
Dee 9 -- 8:00 -- Police Commission Meeting - Mayor Wegscheid
City Offices Closed
July 3
Sept 7
Nov 11
Nov 26 -27
Independence Day
Labor Day
Veterans Day
Thanksgiving
City Official's Absences
June 24 -26 Kandis Hanson - professional development
Music in the Park 2015 - All at Surfside at 7pm, except July 9 at the Harbor District
June 11 June 18 June 25
July 9 July 16 July 23
CITY OF MOUND CLAIMS
6-09-15 MEETING
YEAR BATCH NAME
2015 MAY15ELANCC
2015 060315CTYMAN
2015 060915CITY
2015 060915CITY -2
$ 3,098.17
$ 8,469.16
$ 151,373.32
$ 67,220.81
$ 5,668.18
TOTAL CLAws-l! $ 235829.,64
-1399-
CITY OF MOUND
Payments
Current Period: May 2015
06/03/15 3:15 PM
Page 1
Batch Name
MAY15ELANCC User Dollar Amt $3,098.17
Payments Computer Dollar
Amt $3,098.17
$0.00 In Balance
Refer
5 ELAN CREDIT CARD
_
Cash Payment
E 101 - 41.310 -434 Conference & Training
2015 MN CITY - COUNTY MGRS ANNUAL
$500.00
CONFERENCE K. HANSON
Invoice 060915
4/6/2015
Cash Payment
E 101 -41500 -433 Dues and Subscriptions
N. IVERSON ANNUAL MEMBERSHIP DUES
$60.00
2015 MGFOA
Invoice 060915
4/7/2015
Cash Payment
E 101 -41310 -431 Meeting Expense
WESTONKA COMMUNITY & COMMERCE
$15.00
LUNCH MTG 4 -9 -15 K. HANSON
Invoice 060915
4/9/2015
Cash Payment
E 609 -49750 -340 Advertising
VITAL SIGNS MIDWEST -WINE SALE
$106.88
BANNER 17" X 28" HWS
Invoice 060915
4/912015
Cash Payment
E 609 - 49750 -431 Meeting Expense
WESTONKA COMMUNITY & COMMERCE
$15.00
LUNCH MTG 4 -9 -15 J. COLOTTI
Invoice 060915
4/9/2015
Cash Payment
E 602 -49450 -210 Operating Supplies
BLOCK & CO. DESKS IGN W /FRAME,
$50.15
NAMEPLATE COUNCIL CHAMBERS- E.
HOVERSTEN
Invoice 060915
4124/2015
Project 15 -5
Cash Payment
E 601- 49400 -455 Permits
UTILITY PERMIT HENNEP CTY -
$215.00
WATERNIAIN BREAK - RIDGEWOOD RD 4 -9 -15
Invoice 060915
4/9/2015
Cash Payment
E 602 -49450 -434 Conference & Training
GRANDVIEW LODGE NISSWA MN PUBLIC
- $509.52
WORKS ASSOC CONF REFUND
CANCELLATION- C. MOORE
Invoice 060915
4/22/2015
Project 15 -3
Cash Payment
E 101 - 43100 -434 Conference & Training
AMERICAN PUB WKS SPRING CONE REG.
$235.00
R.HANSON
Invoice 060915
4/22/2015
Cash Payment
E 222 - 42260 -210 Operating Supplies
AMAZON.COM FIXTUREWORKS- PULL PIN -T
$39.76
HANDLE SPRING LOADED PLUNGER -FIRE
DEPT
Invoice 060915
4/712015
Cash Payment
E 222 -42260 -219 Safety supplies
AMAZON.COM HI -VIZ SAFETY VESTS -3 FIRE
$48.47
DEPT
Invoice 060915
4/7/2015
Cash Payment
E 222 - 42260 -409 Other Equipment Repair
AMAZON.COM SEASENSE FIRE BOAT GAS
$14.11
TANK TIE DOWN KIT
Invoice 060915
4/23/2015
Cash Payment
E 222 -42260 -434 Conference & Training
2015 FDIC INTL CONF LODGING
$1,399.32
LEMERIDIEN INDIANAPOLIS M. JAKUBIK4-
21 THRU 4 -25 -15
Invoice 060915
4/26/2015
Cash Payment
E 222 - 42260 -434 Conference & Training
2016 FDIC INTL FIRE CONF REGISTRATION-
$610.00
APRIL 21 -23
Invoice 060915
4/24/2015
Cash Payment
E 222 - 42260 -434 Conference & Training
FIREHOUSE EXPO- BALTIMORE MD JULY 14-
$299.00
18 2015- T. MYERS
Invoice 060915
4/29/2015
-1400-
CITY OF MOUND
Payments
06/03/15 3:15 PM
Page 2
Current Period: May 2015
sa
Transaction Date 6/2/2015 Wells Fargo 10100 Total $3,098.17
Fund Summary
10100 Wells Fargo
101 GENERAL FUND
$810.00
222 AREA FIRE SERVICES
$2,410.66
601 WATER FUND
$215.00
602 SEWER FUND
($459.37)
609 MUNICIPAL LIQUOR FUND
$121.88
$3,098.17
Pre - Written Check $0.00
Checks to be Generated by the Computer $3,098.17
Total $3,098.17
-1401-
CITY OF MOUND 06/02/157:57 AM
Page 1
Payments
Current Period: June 2015
Batch Name
060315CTYMAN User Dollar Amt $8,469.16
Payments Computer Dollar Amt $8,469.16
$0.00 In Balance
Refer
2 FIRE DEPT ASSOC OF MINNESOT
_
Cash Payment
E 222-42260-433 Dues and Subscriptions
2015 MN STATE FIRE DEPT ASSOC DUES
$385.00
Invoice 05292015
5/29/2015
Transaction Date 6/1/2015
Wells Fargo 10100 Total
$385.00
Refer
6 FRONTIER/CITIZENS COMMUNICA
Cash Payment
E 22242260 -321 Telephone & Cells
NETWORK ETHERNET SVC 5 -20 -15 THRU 6-
$187.56
20 -15
Invoice 4425479
5/20/2015
Cash Payment
E 101- 41920 -321 Telephone & Cells
NETWORK ETHERNET SVC 5 -20 -15 THRU 6-
$562.68
20 -15
Invoice 4425479
5/20/2015
_
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$750.24
1 MINNESOTA POLLUTION CONTRO
_
_Refer_
Cash Payment
E 602 - 49450438 Licenses and Taxes
WASTEWATER FACILITY OPERATOR
$2100
CERTFICATE RENEWALS. KIVISTO
Invoice 060315
5/12/2015
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$23.00
Refer
3 OFFICE DEPOT (FIRE)
_
Cash Payment
E 22242260 -210 Operating Supplies
AAA BETTERIES 24 PK
$5.72
Invoice 765433846001 4/14/2015 PO 24436
Cash Payment
E 10142115 -210 Operating Supplies
1.5' BINDERS- EMERGENCY MGMT
$56.16
Invoice 765433846001 4/1412015 PO 24436
Cash Payment
E 22242260 -200 Office Supplies
COPY PAPER, RECVD STAMP, ENVELOPES,
$148.96
USB DRIVE 8GB, ADDRESS LABELS, FILE
FOLDERS, PENS LAMINATING SHEETS -
FIRE DEPT
Invoice 770417614001 5/13/2015 PO 24199
Transaction Date
5/2912015
Wells Fargo 10100 Total
$211.84
Refer
4 TONKA PLUMBING HEATING & CL
Cash Payment
E 602 - 49450 -223 Building Repair Supplies
FURNISH & INSTALL 2 1/2" RPZ BACKFLOW
$4,482.00
PREVENTER- PUB WKS WASH BAY
Invoice 7712
3/23/2015
Project 15 -3
Cash Payment
E 101 - 45200 -440 Other Contractual Servic
FURNISH & INSTALL NATURAL GAS WATER
$1,708.00
HEATER -PARK SHOP
Invoice 7782
4/27/2015
Transaction Date
5/29/2015
Wells Fargo 10100 Total
$6,190.00
Refer
5 VER/ZON WIRELESS
_
Cash Payment
G 101 -13100 Due From Other Funds
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13-
$31.05
2015
Invoice 9745621939 5/13/2015
Cash Payment
E 101 -43100 -321 Telephone & Cells
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13-
$181.97
2015
Invoice 9745621939 5/13/2015
Cash Payment
E 601- 49400 -321 Telephone & Cells
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13-
$173.01
2015
Invoice 9745621939 5/13/2015
-1402-
CITY OF MOUND
Payments
Current Period: June 2015
Cash Payment E 602 - 49450 -321 Telephone & Cells
Invoice 9745621939 5/13/2015
Cash Payment E 101- 42400 -321 Telephone & Cells
Invoice 9745621939 5113/2015
Cash Payment E 101 -45200 -321 Telephone & Cells
Invoice 9745621939 5/13/2015
Cash Payment E 101 -41310 -321 Telephone & Cells
Invoice 9745621939 5/13/2015
Cash Payment E 222 -42260 -321 Telephone & Cells
Invoice 9745621939 5/1312015
06/02/15 7:57 AM
Page 2
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13- $175.05
2015
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13- $47.57
2015
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13- $133.43
2015
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13- $50.49
2015
CELL PHONE CHARGES 4 -14 -15 THRU 5 -13- $100.98
2015
Cash Payment E 101 -42115 -321 Telephone & Cells CELL PHONE CHARGES 4 -14 -15 THRU 5 -1.3- $15.53
2015
Invoice 9745621939 5/13/2015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $909.08
Fund Summary
101 GENERAL FUND
222 AREA FIRE SERVICES
601 WATER FUND
602 SEWER FUND
10100 Wells Fargo
$2,786.88
$829.22
$173.01
$4,680.05
$8,469.16
Pre - Written Check $0.00
Checks to be Generated by the Computer $8,469.16
Total $8,469.16
-1403-
CITY OF MOUND
Payments
Current Period: June 2015
06/04/15 9:20 AM
Page 1
Invoice W561286 5/27/2015
Cash Payment E 101 - 45200410 Rentals (GENERAL) SKATEPARK BIFFS RENTAL & SVC APRIL $284.25
29 -MAY 26 2015
Invoice W561287 5127/2015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $968.25
Refer 3 BONN, BEN. �..,«_ ...............w:,..�,a, ,.�».,,..�.�.,� ..n,...�„.,,..,.,�,.,
-1404-
Batch Name
060915CITY User Dollar Amt $151,373.32
Payments Computer Dollar Amt $151,373.32
$0.00 In Balance
Refer
32 ABDO SICK AND MEYERS, LLP -
Cash Payment
E 101 - 41500 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$1,896.33
31 -2014
Invoice 348563
5/29/2015
Cash Payment
E 22242260 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$1,003.95
31 -2014
Invoice 348563
5/29/2015
Cash Payment
E 28145210 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$334.65
31 -2014
Invoice 348563
5129/2015
Cash Payment
E 401- 43101 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$0.00
31 -2014
Invoice 348563
5/29/2015
Cash Payment
E 60149400 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$878.59
31 -2014
Invoice 348563
5/29/2015
Cash Payment
E 60249450 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$878.59
31 -2014
Invoice 348563
5/29/2015
Cash Payment
E 609 - 49750 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$1,561.69
31 -2014
Invoice 348563
5/29/2015
Cash Payment
E 670- 49500 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$223.10
31 -2014
Invoice 348563
5/2912015
Cash Payment
E 67549425 -301 Auditing and Acct g Servi CERTIFIED AUDIT SVCS- YEAR ENDED 12-
$223.10
31 -2014
Invoice 348563
5/29/2015
Transaction Date
6/1/2015 Wells Fargo 10100 Total
$7,000.00
Refer
1 ASSURED SECURITY, INC. _
Cash Payment
E 60149400 -500 Capital Outlay FA 7 ELECTRONIC LOCKS, & EXIT DEVICES W/
$11,143.00
CARD READERS- WELL #3, #8, &
PUMPHOUSE
Invoice 71672
5/8/2015 PO 24324 _
Transaction Date
6/1/2015 Wells Fargo 10100 Total
..m...w
$11,143.00
Refer
2 BIFFS, INC PORTABLE RESTROO
Cash Payment
E 10145200410 Rentals (GENERAL) CENTERVIEW BEACH BIFFS RENTAL & SVC
$284.25
APR] L 29 -MAY 26 2015
Invoice W561285 5/27/2015
Cash Payment
E 101- 45200410 Rentals (GENERAL) MOUND BAY PARK BIFFS RENTAL & SVC
$399.75
APRIL 29 - MAY 26 2015
Invoice W561286 5/27/2015
Cash Payment E 101 - 45200410 Rentals (GENERAL) SKATEPARK BIFFS RENTAL & SVC APRIL $284.25
29 -MAY 26 2015
Invoice W561287 5127/2015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $968.25
Refer 3 BONN, BEN. �..,«_ ...............w:,..�,a, ,.�».,,..�.�.,� ..n,...�„.,,..,.,�,.,
-1404-
CITY OF MOUND 06/04/159:20 AM
Page 2
Payments
Current Period: June 2015
Cash Payment
E 601- 49400 -218 Clothing and Uniforms
2015 BOOT ALLOWANCE REIMB- B. BUNN
$175.00
Invoice 060915
5/27/2015
Transaction Date 6/1/2015
Wells Fargo 10100 Total
$175.00
Refer
4 CENTERPOINTENERGY(MINNEG
_
Cash Payment
E 602- 49450 -383 Gas Utilities
5808 GRANDVIEW BLVD LS GENERATOR
$13.57
NATL GAS SVC 2 -19 -15 THRU 3 -20 -15
Invoice 060915
5/26/2015
Transaction Date 6/1/2015
Wells Fargo 10100 Total
$13.57
Refer ffi
41 COLOTTI, JOHNA.
_
Cash Payment
E 609 -49750 -331 Use of personal auto
REIMB APRIL & MAY MILEAGE TO & FROM
$23.00
CITY HALL- TO BANK- J. COLOTTI
Invoice 060915
6/2/2015
Transaction Date 6/3/2015
Wells Fargo 10100 Total
$23.00
Refer
5 COMMERCIAL ASPHALT CO.
_
Cash Payment
E 101 - 43100 -224 Street Maint Materials
DURA DRIVE HOTMIX 8.58 TONS
$487.78
Invoice 150515
5/15/2015
Transaction Date 6/1/2015
Wells Fargo 10100 Total
$487.78
Refer
6 DISPLAY SALESM
_
Cash Payment
E 101- 43100 -210 Operating Supplies
15 50" CANDLE WREATHS -XMAS
$6,107.25
DECORATIONS - STREETS
Invoice 001512
5/20/2015 PO 24534
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$6,107.25
Refer
7 EMERYS TREE SERVICE, INCORP
_
Cash Payment
E 101- 45200 -533 Tree Removal
REMOVE ELM TREE LIMBS @ 4743 ISLAND
$570.00
VIEW DRIVE 5 -13 -15
Invoice 19224
5/19/2014
Transaction Date
5/22/2014
Wells Fargo 10100 Total
$570.00
Refer_
88 ENVIRONMENTAL EQUIPMENT AN
_
Cash Payment
E 101 - 43100 -221 Equipment Parts
HEAVY DUTY SUCTION HOSE & CLAMPS-
$596.36
TYMCO SWEEPER
Invoice 11974
5/7/2015
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$596.36
Refer
9 FASTENAL COMPANY"
Cash Payment
E 101- 43100 -230 Shop Materials
BACK UP ALARM #230- STREETS
$36.83
Invoice MNWAC41064 5/12/2015
Transaction Date
611/2015
Wells Fargo 10100 Total
$36.83
Refer
33 FIVE TECHNOLOGY _
Cash Payment
E 101 -41920 -440 Other Contractual Servic
MONTHLY SVC & NETWORK MTCE- JUNE
$1,800.00
2015
Invoice 10615 -31
6/1/2015
Cash Payment
E 101 -41920 -205 Computer Hardware /Soft
RAM UPGRADE X 2
$225.00
Invoice P237 -23
4/13/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$2,025.00
Refer M
35 FRONTIER/CITIZENS COMMUNICA
Cash Payment
E 101 - 45200 -321 Telephone & Cells
PHONE SVC 5130/15 TO 6129/15
$122.37
Invoice 060915
5/30/2015
-1405-
CITY OF MOUND 06/04/159:20 AM
Page 3
Payments
Refer 12 G & K SERVICES
Cash Payment E 101 - 45200 -218 Clothing and Uniforms
Invoice 1006880399 5/4/2015
Cash Payment E 101- 45200 -210 Operating Supplies
Invoice 1006880399 5/4/2015
Cash Payment E 101 -45200 -218 Clothing and Uniforms
Invoice 1006103123 5/18/2015
Cash Payment E 101 - 45200 -210 Operating Supplies
Invoice 1006103123 5/18/2015
Cash Payment E 101- 45200 -218 Clothing and Uniforms
Invoice 1006891719 5/11/2015
Cash Payment E 101- 45200 -210 Operating Supplies
Invoice 1006891719 5/11/2015
Transaction Date 6/1/2015
Refer 11 G & K SERVICES
Cash Payment E 101 -43100 -218 Clothing and Uniforms
Invoice 1006880397 5/4/2015
Cash Payment E 601 - 49400 -218 Clothing and Uniforms
Invoice 1006880397 5/4/2015
UNIFORM SVC 5 -4 -15 PARKS
Current Period: June 2015
SHOP SUPPLIES 5 -4 -15 PARKS
$71.84
UNIFORM SVC 5 -18 -15 PARKS
$49.90
SHOP SUPPLIES 5 -18 -15 PARKS
Cash Payment
E 602 - 49450 -321 Telephone & Cells
PHONE SVC 5/30/15 TO 6/29/15
$72.37
Invoice 060915
5/30/2015
$381.40
UNIFORM SVC 5-4 -15
Cash Payment
E 609 - 49750 -321 Telephone & Cells
PHONE SVC 5/30/15 TO 6/29/15
$591.70
Invoice 060915
5/30/2015
Cash Payment
E 602 - 49450 -321 Telephone & Cells
PHONE SVC 5/30/15 TO 6/29/15
$417.89
Invoice 060915
5/30/2015
Cash Payment
E 601- 49400 -321 Telephone & Cells
PHONE SVC 5/30/15 TO 6/29/15
$405.60
Invoice 060915
5/30/2015
Cash Payment
E 101 -43100 -321 Telephone & Cells
PHONE SVC 5/30/15 TO 6/29/15
$405.60
Invoice 060915
5/30/2015
Cash Payment
E 101- 41930 -321 Telephone & Cells
PHONE SVC 5130/15 TO 6/29/15
$880.48
Invoice 060915
5/30/2015
Cash Payment
E 222 -42260 -321 Telephone & Cells
PHONE SVC 5/30115 TO 6/29/15
$293.50
Invoice 060915
5/30/2015
Cash Payment
E 101- 41910 -321 Telephone & Cells
PHONE SVC 5130/15 TO 6/29/15
$146.75
Invoice 060915
5/30/2015
Cash Payment
E 101- 42110 -321 Telephone & Cells
PHONE SVC 5/30115 TO 6/29/15
$146.75
Invoice 060915
5/30/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$3,483.01
Refer
10 G & K SERVICES_
Cash Payment
E 609 - 49750 -460 Janitorial Services
HWS -MAT SVC & SUPPLIES 5 -04 -15
$92.98
Invoice 1006880389 5/4/2015
Cash Payment
E 609 - 49750 -460 Janitorial Services
HWS -MAT SVC & SUPPLIES 5 -11 -15
$92.98
Invoice 1006891713 5/11/2015
Cash Payment
E 609 -49750 -460 Janitorial Services
HWS -MAT SVC & SUPPLIES 5 -18 -15
$92.98
Invoice 1006103113
5/18/2015
Cash Payment
E 609 - 49750 -460 Janitorial Services
HWS -MAT SVC & SUPPLIES 5 -25 -15
$127.72
Invoice 1006114501 5/25/2015
_
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$406.66
Refer 12 G & K SERVICES
Cash Payment E 101 - 45200 -218 Clothing and Uniforms
Invoice 1006880399 5/4/2015
Cash Payment E 101- 45200 -210 Operating Supplies
Invoice 1006880399 5/4/2015
Cash Payment E 101 -45200 -218 Clothing and Uniforms
Invoice 1006103123 5/18/2015
Cash Payment E 101 - 45200 -210 Operating Supplies
Invoice 1006103123 5/18/2015
Cash Payment E 101- 45200 -218 Clothing and Uniforms
Invoice 1006891719 5/11/2015
Cash Payment E 101- 45200 -210 Operating Supplies
Invoice 1006891719 5/11/2015
Transaction Date 6/1/2015
Refer 11 G & K SERVICES
Cash Payment E 101 -43100 -218 Clothing and Uniforms
Invoice 1006880397 5/4/2015
Cash Payment E 601 - 49400 -218 Clothing and Uniforms
Invoice 1006880397 5/4/2015
UNIFORM SVC 5 -4 -15 PARKS
$49.90
SHOP SUPPLIES 5 -4 -15 PARKS
$71.84
UNIFORM SVC 5 -18 -15 PARKS
$49.90
SHOP SUPPLIES 5 -18 -15 PARKS
$71.84
UNIFORM SVC 5 -11 -15 PARKS
$55.39
MAT SVC & SHOP SUPPLIES 5 -11 -15 PARKS
$82.53
Wells Fargo 10100 Total
$381.40
UNIFORM SVC 5-4 -15
$44.63
UNIFORM SVC 5 -4 -15
$60.90
4.
CITY OF MOUND 06/04115 9:20 AM
Page 4
Payments
Current Period: June 2015
-1407-
Cash Payment
E 602 -49450 -218 Clothing and Uniforms
UNIFORM SVC 5-4 -15
$62.65
Invoice 1006880397 5/4/2015
Cash Payment
E 602 - 49450 -230 Shop Materials
MAT SVC & SHOP SUPPLIES 5 -4 -15
$77.14
Invoice 1006880397 5/4/2015
Project 15 -3
Cash Payment
E 101- 43100 -218 Clothing and Uniforms
UNIFORM SVC 5 -11 -15
$46.19
Invoice 1006891717
5/11/2015
Cash Payment
E 601- 49400 -218 Clothing and Uniforms
UNIFORM SVC 5 -11 -15
$62.46
Invoice 1006891717
5/11/2015
Cash Payment
E 602 - 49450 -218 Clothing and Uniforms
UNIFORM SVC 5 -11 -15
$64.21
Invoice 1006891717
5/11/2015
Cash Payment
E 602 - 49450 -230 Shop Materials
MAT SVC & SHOP SUPPLIES 5 -11 -15
$183.50
Invoice 1006891717
5/11/2015
Project 15 -3
Cash Payment
E 101- 43100 -218 Clothing and Uniforms
UNIFORM SVC 5 -18 -15
$54.28
Invoice 1006103121
5/18/2015
Cash Payment
E 601 -49400 -218 Clothing and Uniforms
UNIFORM SVC 5 -18 -15
$70.55
Invoice 1006103121
5/18/2015
Cash Payment
E 602 - 49450 -218 Clothing and Uniforms
UNIFORM SVC 5 -18 -15
$72.30
Invoice 1006103121
5/18/2015
Cash Payment
E 602 - 49450 -230 Shop Materials
MAT SVC & SHOP SUPPLIES 5 -18 -15
$344.20
Invoice 1006103121
5/18/2015
Project 15 -3
Cash Payment
E 101 -43100 -218 Clothing and Uniforms
UNIFORM SVC 5 -25 -15
$0.00
Invoice
5125/2015
Cash Payment
E 601 - 49400 -218 Clothing and Uniforms
UNIFORM SVC 5 -25 -15
$0.00
Invoice
5/25/2015
Cash Payment
E 602 -49450 -218 Clothing and Uniforms
UNIFORM SVC 5 -25 -15
$0.00
Invoice
5/25/2015
Cash Payment
E 602 - 49450 -230 Shop Materials
MAT SVC & SHOP SUPPLIES 5 -25 -15
$0.00
Invoice
5/4/2015
Project 15 -3
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$1,143.01
Refer umm�13
GARDENCARE INC.
Cash Payment
E 101 -45200 -232 Landscape Material
13 18" HANGING FLOWER BASKETS-
$1,300.00
DOWNTOWN STREETSCAPE
Invoice 2014166
5/2612015 PO 24503
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$1,300.00
Refer
33 GOPHER STATE ONE CALL
_
Cash Payment
E 601- 49400 -395 Gopher One -Call
MAY 2015 LOCATES
$176.22
Invoice 136536
5/31/2015
Cash Payment
E 602 - 49450 -395 Gopher One -Call
MAY 2015 LOCATES
$176.23
Invoice 136536
5/31/2015
Transaction Date
611/2015
Wells Fargo 10100 Total
$352.45
Refer
36 GUST, RONALD R. JR
_
Cash Payment
E 609- 49750 -331 Use of personal auto
REIMB MILEAGE TO VENDORS & HWS
$184.00
SPONSORED EVENTS- R. GUST 2 -19 -15
THRU 5 -3 -15
Invoice 060915
612/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$184.00
Refer
40 HAGGERTY, CRAIG
-1407-
CITY OF MOUND 06/04/159:20 AM
Page 5
Payments
Current Period: June 2015
Invoice 8012999 5/6/2015
Cash Payment E 101- 43100 -210 Operating Supplies 12" CONCRETE TUBE $8.69
Invoice 8013000 5/6/2015
Cash Payment E 670 - 49500 -210 Operating Supplies RECYCLE DAY -TARPS & TIE -DOWNS $160.72
Invoice 8013000 5/6/2015
Transaction Date 6/3/2015 Wells Fargo 10100 Total $648.39
Refer M~nm 15 /SS FACILITY SERVICES M/NNEAP
Cash Payment E 222 - 42260 -440 Other Contractual Servic SANIGLAZE SVC- 3 RESTROOM TILE
FLOORS- CITY HALL & FIRE DEPT
Invoice 887467 5/20/2015
Cash Payment E 101- 41930 -440 Other Contractual Servic SANIGLAZE SVC- 3 RESTROOM TILE
FLOORS- CITY HALL & FIRE DEPT
Invoice 887467 5/20/2015
$573.75
$1,721.25
Cash Payment E 609 - 49750 -440 Other Contractual Servic SANIGLAZE SVC- MAIN ENTRANCE & 2 $530.64
RESTROOM TILE FLOORS- HWS
Invoice 889060 5/22/2015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $2,825.64
Referw 42 JUBILEE FOODS _
Cash Payment E 609 -49750 -210 Operating Supplies KING SIZE BLACK MARKER- HWS
Invoice 060915 611/2015
$2.13
Cash Payment E 609 - 49750 -255 Misc Merchandise For R LIMES & LEMONS FOR RESALE- HWS $61.50
Invoice 060915 6/1/2015
Transaction Date 6/312015 Well Fa 10100 Total $63.63
Cash Payment
E 675 - 49425 -500 Capital Outlay FA
REIMB LAWN REPAIR EXP -SEED &
$139.65
FERTILIZER- STORM DRAIN IMPROV PROJ-
PW 14 -04- 6232 BARTLETT BLVD- C.
HAGGERTY
Invoice 060915
6/3/2015
Project PW1404
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$139.65
Refer
43 HANSON, KANDIS
_
Cash Payment
E 101 - 41310 -331 Use of personal auto
REIMB MILEAGE - CITY BUSINESS- K.
$172.50
HANSON MAY 2015
Invoice 060915
6/3/2015
Cash Payment
E 101 - 41310 -321 Telephone & Cells
REIMB DSL INTERNET HOME LINE- K.
$47.50
HANSON MAY 2015
Invoice 060915
6/3/2015
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$220.00
Refer
14 HD SUPPLY WATERWORKS, LTD
Cash Payment
E 601- 49400 -221 Equipment Parts
16QTY 3/4" WATER METERS, RADIO READS
$3,499.91
& COUPLING
Invoice D950278
5/20/2015
_
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$3,499.91
Refer
39 HOME DEPOT /GECF (P/AJ__
_
Cash Payment
E 101 - 43100 -226 Sign Repair Materials
60# CONCRETE, 12" CONCRETE TUBE-
$402.33
SIGN SHOP MATERIALS- PALLET FEE &
DELIVERY
Invoice 261062
5/4/2015
Cash Payment
E 101 -43100 -226 Sign Repair Materials
7 FT CROSS- SIGN MATERIALS
$21.98
Invoice 755889
5/4/2015
Cash Payment
E 101- 45200 -210 Operating Supplies
SHEETING, PARKS SUPPLIES
$54.67
Invoice 8012999 5/6/2015
Cash Payment E 101- 43100 -210 Operating Supplies 12" CONCRETE TUBE $8.69
Invoice 8013000 5/6/2015
Cash Payment E 670 - 49500 -210 Operating Supplies RECYCLE DAY -TARPS & TIE -DOWNS $160.72
Invoice 8013000 5/6/2015
Transaction Date 6/3/2015 Wells Fargo 10100 Total $648.39
Refer M~nm 15 /SS FACILITY SERVICES M/NNEAP
Cash Payment E 222 - 42260 -440 Other Contractual Servic SANIGLAZE SVC- 3 RESTROOM TILE
FLOORS- CITY HALL & FIRE DEPT
Invoice 887467 5/20/2015
Cash Payment E 101- 41930 -440 Other Contractual Servic SANIGLAZE SVC- 3 RESTROOM TILE
FLOORS- CITY HALL & FIRE DEPT
Invoice 887467 5/20/2015
$573.75
$1,721.25
Cash Payment E 609 - 49750 -440 Other Contractual Servic SANIGLAZE SVC- MAIN ENTRANCE & 2 $530.64
RESTROOM TILE FLOORS- HWS
Invoice 889060 5/22/2015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $2,825.64
Referw 42 JUBILEE FOODS _
Cash Payment E 609 -49750 -210 Operating Supplies KING SIZE BLACK MARKER- HWS
Invoice 060915 611/2015
$2.13
Cash Payment E 609 - 49750 -255 Misc Merchandise For R LIMES & LEMONS FOR RESALE- HWS $61.50
Invoice 060915 6/1/2015
Transaction Date 6/312015 Well Fa 10100 Total $63.63
CITY OF MOUND 06/04/15 9:20 AM
Page 6
Payments
Current Period: June 2015
Refer
16 KLM ENGINEERING, INCORPORAT
_
Cash Payment
E 601 -49400 -500 Capital Outlay FA
ELECTRICAL WORK -TANK INSPECTION &
$3,000.00
SEDIMENT CLEAN -OUT ISLAND PARK
STANDPIPE
Invoice 5611
5/21/2015 PO 24351
Transaction Date 6/1/2015
Wells Fargo 10100
Total
$3,000.00
Refer
17 LAKE MINNETONKA CONSERVATI
_
Cash Payment
E 101 - 41110 -433 Dues and Subscriptions
2ND QTR 2015 LMCD LEVY PAYMENT
$5,319.00
Invoice 060915
4/6/2015
Transaction Date 6/1/2015
Wells Fargo 10100
Total
$5,319.00
Refer
38 METROPOLITAN COUNCIL WASTE
_
_
Cash Payment
E 602 -49450 -388 Waste Disposal -MCIS
WASTEWATER SERVICES JULY 2015
$64,157.17
Invoice 0001045293 6/312015
Transaction Date 6/3/2015
Wells Fargo 10100
Total
$64,157.17
Refer
18 MIDWEST ASPHALT CORPORA TIO
_
Cash Payment
E 101 -43100 -224 Street Maint Materials
DUMP ASPHALT- QTY 2
$80.00
Invoice 129931
5/18/2015
Transaction Date 6/1/2015
Wells Fargo 10100
Total
$80.00
19 MINNESOTA DEPT OF HEALTH
-Refer
Cash Payment
R 601 - 49400 -37170 State fee - Water
2ND QTR 2015 COMMUNITY WATER
$5,793.00
SUPPLY SVC CONNECTION FEE
Invoice 06092015
5/18/2015
Transaction Date
6/1/2015
Wells Fargo 10100
Total
$5,793.00
Refer
20 MINNESOTA VALLEY TESTING LA
_
Cash Payment
E 601- 49400 -470 Water Samples
MONTHLY CHLORINE REPORT & COLIFORM
$77.50
WATER TESTS -10
Invoice 755484
5/19/2015
Transaction Date
6/1/2015
Wells Fargo 10100
Total
$77.50
21 MN CLEAN SERVICES, INC.
_Refer
Cash Payment
E 101 - 41930 -460 Janitorial Services
JANITORIAL SVC- MAY 2015- PUBLIC
$245.20
WORKS BLDG
Invoice 0615M01
6/1/2015
Cash Payment
E 222 -42260 -460 Janitorial Services
JANITORIAL SVC- MAY 2015- PUBLIC
$245.20
WORKS BLDG
Invoice 0615M01
6/112015
Cash Payment
E 101 - 41910 -460 Janitorial Services
JANITORIAL SVC - MAY 2015- PUBLIC
$326.93
WORKS BLDG
Invoice 0615M01
6/1/2015
Cash Payment
E 602 - 49450 -460 Janitorial Services
JANITORIAL SVC- MAY 2015- PUBLIC
$163.47
WORKS BLDG
Invoice 0615M01
611/2015
Project
15 -3
Transaction Date
6/1/2015
Wells Fargo 10100
Total
$980.80
Refer
37 MNSPECT
Cash Payment
E 101- 42400 -308 Building Inspection Fees
MAY 2015 BUILDING INSPECTION FEES
$5,915.90
Invoice 6555
6/1/2015
Cash Payment
G 101 -20800 Due to Other Governments
MAY2015 - ELECTRICAL STATE
- $110.00
SURCHARGE FEE CREDIT
Invoice 6555
6/1/2015
-1409-
CITY OF MOUND 06/04/159:20 AM
Page 7
Payments
Current Period: June 2015
Cash Payment R 101- 42000 -32220 Electrical Permit Fee MAY 2015 ELECTRICAL INSPECTION 4366.00
PERMIT FEE CREDITS
Invoice 6555 6/112015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$5,439.90
22 MTI DISTRIBUTING, INC.
_
Wells Fargo 10100 Total
_Refer
Cash Payment
E 101- 45200 -221 Equipment Parts
WHEEL ASSEMBLY, ELEMENT, OIL FILTER-
$203.79
Cash Payment E 101 -41600 -450 Board of Prisoners
HENNEP CTY JAIL CHARGES- PER DIEM
PARKS
Invoice 1011396
5114/2015
Invoice 20140394 5/26/2015
Cash Payment
E 10145200 -221 Equipment Parts
BLADE PACK KIT- PARKS DEPT
$117.96
Invoice 1011407
5/15/2015
_Refer
Cash Payment E 222 -42260 -384 Refuse /Garbage Dispos
Transaction Date
611/2015
Wells Fargo 10100 Total
$321.75
Refer
23 NELSON ELECTRIC MOTOR R_EPAI
_
$159.30
_
Cash Payment
E 602 -49450 -221 Equipment Parts
D -5 LIFT STATION - REPLACE MOTOR
$1,150.00
JUNE 2015 GARBAGE SVC
$243.04
STARTER, REWIND & REBUILD PUMP #1-
Project 15 -3
Cash Payment E 101 - 41910 -384 Refuse /Garbage Dispos
BEARINGS, SEAL, ORING KIT
$178.63
Invoice 7199 5119/2015
Transaction Date 6/112015 Wells Fargo 10100 Total $1,150.00
Refer 24 NORLINGS LAKE MINNETONKA LA
Cash Payment E 401- 43114 -300 Professional Srvs LANDSCAPE MTCE SVCS TRANSIT STATION $4,684.00
RETENTION POND 6 -16 -14 2014
Invoice 30534 5/1912015 Project PW1401
Transaction Date 611/2015 Wells Fargo 10100 Total $4,684.00
_ R_efer _ 25 NS /I MECHANICAL CONTRACTING, _
Cash Payment E 101 - 41910 -440 Other Contractual Servic PREVENTIVE MTCE AGREEMENT MAY $1,280.00
THRU JULY 2015 CENT BLDG
Invoice C003916 5/22/2015
Transaction Date 1/9/2014 Wells Fargo 10100 Total $1,280.00
Refer 26 OFFICE DEPOT
Cash Payment E 60949750 -200 Office Supplies
CYAN INK TONER, A -Z CASE FILE- HWS
$11617
Invoice 770610204001 5/14/2015 PO 23478
Transaction Date 6/1/2015
Wells Fargo 10100 Total
$116.17
Refer 27 ORONO, CITY OF
_
Cash Payment E 101 -41600 -450 Board of Prisoners
HENNEP CTY JAIL CHARGES- PER DIEM
$168.32
FEES MAY 2015
Invoice 20140394 5/26/2015
Transaction Date 6/1/2015
Wells Fargo 10100 Total
$168.32
�. 28 REPUBLIC SERVICES
_
_Refer
Cash Payment E 222 -42260 -384 Refuse /Garbage Dispos
JUNE 2015 GARBAGE SVC
$159.31
Invoice 0894- 003823849 5/25/2015
Cash Payment E 101- 41930 -384 Refuse /Garbage Dispos
JUNE 2015 GARBAGE SVC
$159.30
Invoice 0894 - 003823849 5/25/2015
Cash Payment E 602- 49450 -384 Refuse /Garbage Dispos
JUNE 2015 GARBAGE SVC
$243.04
Invoice 0894 - 003823851 5/25/2015
Project 15 -3
Cash Payment E 101 - 41910 -384 Refuse /Garbage Dispos
JUNE 2015 GARBAGE SVC
$178.63
Invoice 0894 - 003823849 5/25/2015
Cash Payment E 67049500 -440 Other Contractual Servic
MAY 2015 CITY WIDE RECYCLING SVC
$12,991.77
Invoice 0894 - 003823849 5/25/2015
Transaction Date 6/1/2015
Wells Fa 10100 Total
$13,732.05
CITY OF MOUND
Payments
Current Period: June 2015
06/04/15 9:20 AM
Page 8
Invoice 3001860258 6/1/2015
Transaction Date 6/2/2015
Refer 30 ULINE�
Cash Payment E 101 -43100 -230 Shop Materials
Invoice 67585989 5115/2015
Cash Payment E 101- 43100 -230 Shop Materials
Invoice 67585989 5/15/2015
Transaction Date 611/2015
Refer 31 XCEL ENERGY
Cash Payment E 101- 43100 -381 Electric Utilities
Invoice 458175280 5/27/2015
Cash Payment E 602 - 49450 -381 Electric Utilities
Wells Fargo 10100 Total $821.13
CLEAR WRAPAROUND GLASSES- 1 DOZEN
CUT RESISTANT GLOVES 12 PR
$43.90
$151.61
Wells Fargo 10100 Total $195.51
SHORELINE - COMMERCE STREET LIGHTS 4- $45.11
26 -15 THRU 5/26/15
CARLOW RD LIFT STATION ELECTRICITY 4- $70.16
27 -15 THRU 5 -27 -15
Invoice 458403741 5/2912015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $115.27
. Fund Summary
10100 Wells Fargo
101
Refer
29 RICOH USA, INC.
_
AREA FIRE SERVICES
Cash Payment
E 222- 42260 -202 Duplicating and copying
FIRE DEPT COPIER RENTAL FEE 13 -13 -14
$147.96
401
GENERAL CAPITAL PROJECTS
THRU 6 -12 -15
601
Invoice 94766261
5/25/2015
602
SEWER FUND
Transaction Date
6/1/2015
Wells Fargo 10100 Total
$147.96
Refer
34 THYSSEN -KRUPP ELEVATOR COR
-
675
Cash Payment
E 101 - 41910 -440 Other Contractual Servic
ELEVATOR MTCE 6 -1 -15 THRU 8 -31 -15 CENT
$821.13
$151,373.32
BLDG
Invoice 3001860258 6/1/2015
Transaction Date 6/2/2015
Refer 30 ULINE�
Cash Payment E 101 -43100 -230 Shop Materials
Invoice 67585989 5115/2015
Cash Payment E 101- 43100 -230 Shop Materials
Invoice 67585989 5/15/2015
Transaction Date 611/2015
Refer 31 XCEL ENERGY
Cash Payment E 101- 43100 -381 Electric Utilities
Invoice 458175280 5/27/2015
Cash Payment E 602 - 49450 -381 Electric Utilities
Wells Fargo 10100 Total $821.13
CLEAR WRAPAROUND GLASSES- 1 DOZEN
CUT RESISTANT GLOVES 12 PR
$43.90
$151.61
Wells Fargo 10100 Total $195.51
SHORELINE - COMMERCE STREET LIGHTS 4- $45.11
26 -15 THRU 5/26/15
CARLOW RD LIFT STATION ELECTRICITY 4- $70.16
27 -15 THRU 5 -27 -15
Invoice 458403741 5/2912015
Transaction Date 6/1/2015 Wells Fargo 10100 Total $115.27
. Fund Summary
Pre - Written Check $0.00
Checks to be Generated by the Computer $151,373.32
Total $151,373.32
-1411-
10100 Wells Fargo
101
GENERAL FUND
$33,225.95
222
AREA FIRE SERVICES
$2,423.67
281
COMMONS DOCKS FUND
$334.65
401
GENERAL CAPITAL PROJECTS
$4,684.00
601
WATER FUND
$25,342.73
602
SEWER FUND
$68,146.49
609
MUNICIPAL LIQUOR FUND
$3,477.49
670
RECYCLING FUND
$13,375.59
675
STORM WATER UTILITY FUND
$362.75
$151,373.32
Pre - Written Check $0.00
Checks to be Generated by the Computer $151,373.32
Total $151,373.32
-1411-
CITY OF MOUND 06/03/1511:42 AM
Page 1
Payments
Current Period: June 2015
Batch Name 060915HWS User Dollar Amt $67,220.81
Payments Computer Dollar Amt $67,220.81
$0.00 In Balance
Refer 1 ARCTIC GLACIER PREMIUM ICE
Cash Payment E 609- 49750 -255 Misc Merchandise For R
ICE
$121.92
Invoice 439514802 5128/2015
Cash Payment E 609- 49750 -265 Freight
FREIGHT
$1.00
Invoice 439514802 5/28/2015
Cash Payment E 60949750 -255 Misc Merchandise For R
ICE
$130.06
Invoice 381514302 5/23/2015
Cash Payment E 609 - 49750 -265 Freight
FREIGHT
$1.00
Invoice 381514302 5/23/2015
Cash Payment E 609 - 49750 -255 Misc Merchandise For R
ICE
$80.38
Invoice 461514604 5/26/2015
Cash Payment E 609 - 49750 -265 Freight
FREIGHT
$1.00
Invoice 461514604 5/26/2015
Transaction Date 6/2/2015 Due 12/31/2014
Wells Fargo
10100 Total
$335.35
Refer 2 BELLBOY CORPORATION
_
Cash Payment E 60949750 -210 Operating Supplies
SUPPLIES, BAGS
$55.68
Invoice 92072800 5/27/2015
Cash Payment E 609- 49750 -254 Soft Drinks /Mix For Resa
MIX
$107.50
Invoice 92072800 5/27/2015
Cash Payment E 609- 49750 -255 Misc Merchandise For R
FLASKS
$9.00
Invoice 92072800 5/27/2015
Transaction Date 6/2/2015
Wells Fargo
10100 Total
$172.18
Refer 5 BELLBOY CORPORATION _
Cash Payment E 609 -49750 -251 Liquor For Resale
LIQUOR
$1,250.45
Invoice 48396300 5/22/2015
Cash Payment E 609 - 49750 -265 Freight
FREIGHT
$13.95
Invoice 48396300 5122/2015
Cash Payment E 609- 49750 -251 Liquor For Resale
LIQUOR
$322.84
Invoice 48373000 5/22/2015
Cash Payment E 609- 49750 -265 Freight
FREIGHT
$0.53
Invoice 48373000 5122/2015
Cash Payment E 609 - 49750 -251 Liquor For Resale
LIQUOR
$5,591.00
Invoice 48423000 5/27/2015
Cash Payment E 609 - 49750 -265 Freight
FREIGHT
$77.50
Invoice 48423000 5/27/2015
Cash Payment E 609 - 49750 -251 Liquor For Resale
LIQUOR
$1,286.25
Invoice 48482600 5/29/2015
Cash Payment E 609 - 49750 -265 Freight
FREIGHT
$18.60
Invoice 48482600 5/29/2015
Transaction Date 6/2/2015 Wells Fargo
10100 Total
$8,561.12
Refer .« 4 BELLBOY CORPORATION _
Cash Payment E 609 - 49750 -251 Liquor For Resale
LIQUOR
$6,009.08
Invoice 48501600 6/1/2015
Transaction Date 6/2/2015 Wells Fargo
10100 Total
$6,009.08
R° "°
-1412-
""�
CITY OF MOUND 06/03/1511:42 AM
Page 2
Payments
Refer 10 DAY DISTRIBUTING COMPANY
Cash Payment E 609 -49750 -252 Beer For Resale BEER $3,652.34
Invoice 804422 5/27/2015
Cash Payment E 609 -49750 -252 Beer For Resale BEER $21.50
Invoice 804423 5/27/2015
Cash Payment E 609 -49750 -252 Beer For Resale BEER $2,309.05
Invoice 805332 6/2/2015
Cash Payment E 609 -49750 -252 Beer For Resale BEER
Invoice 805333 6/2/2015
$55.20
Transaction Date 6/2/2015 Wells Fargo 10100 Total $6,038.09
Refer 11 EXTREME BEVERAGE _
-1413-
Current Period: June 2015
Refer
3 BELLBOY CORPORATION
_
Cash Payment
E 609 - 49750 -210 Operating Supplies
SUPPLIES, BAGS
$45.17
Invoice 92102400 6/1/2015
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX
$77.59
Invoice 92102400 6/1/2015
Cash Payment
E 609 - 49750 -255 Misc Merchandise For R MDSE - TWINS & GOPHER GLASSES, GELLO
$211.04
SHOT CUPS, BEER CUPS
Invoice 92096500 5/2912015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$333.80
Refer
6 BENT BREWSTILLERY
_
Cash Payment
E 609 - 49750 -252 Beer For Resale
BEER
$54.00
Invoice 000367
5/28/2015
_
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$54.00
Refer
7 BERN/CKS BEVERAGES AND VEN
_
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$165.96
Invoice 221899
5/29/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$165.96
Refer
8 BLUE SKY MEDIA
_
Cash Payment
E 609 -49750 -340 Advertising
114 PAGE AD SOUTH LAKE BUSINESS JUNE
$160.00
2015
Invoice 16622
5/21/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$160.00
Refer
9 CASTLE DANGER BREWERY
_
Cash Payment
E 609 - 49750 -252 Beer For Resale
BEER
$464.00
Invoice 2372
5/21/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$464.00
Refer
15 COCA COLA BOTTLING - MIDWEST
_
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX- COCA COLA PRODUCTS
$166.92
Invoice 0198050329 6/2/2015
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$166.92
Refer
16C -Y PUBLICATIONS
_
Cash Payment
E 609 -49750 -340 Advertising
ADVERTISING- HWS- CATHOLIC YEARBOOK-
$189.00
DIRECT MAILED ANNUALLY- 2015 EDITION
Invoice 47792
5/8/2015
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$189.00
Refer 10 DAY DISTRIBUTING COMPANY
Cash Payment E 609 -49750 -252 Beer For Resale BEER $3,652.34
Invoice 804422 5/27/2015
Cash Payment E 609 -49750 -252 Beer For Resale BEER $21.50
Invoice 804423 5/27/2015
Cash Payment E 609 -49750 -252 Beer For Resale BEER $2,309.05
Invoice 805332 6/2/2015
Cash Payment E 609 -49750 -252 Beer For Resale BEER
Invoice 805333 6/2/2015
$55.20
Transaction Date 6/2/2015 Wells Fargo 10100 Total $6,038.09
Refer 11 EXTREME BEVERAGE _
-1413-
CITY OF MOUND 06/03/1511:42 AM
Page 3
Payments
Current Period: June 2015
Cash Payment
E 609- 49750 -254 Soft Drinks /Mix For Resa MIX
BEER
$2,687.70
$110.70
Invoice 1188500
5/21/2015
Cash Payment
E 60949750 -254 Soft Drinks /Mix For Rasa MIX
$91.20
Transaction Date
6/2/2015
Wells Fargo
10100
Total
$110.70
Refer
12 GRAPE BEGINNINGS, INCORPORA
_
17 JJ TAYLOR. DISTRIBUTING MINN
_
_
Cash Payment
E 609 - 49750 -253 Wine For Resale
WINE
$2,768.05
Invoice 2373407
$716.00
Invoice 182143
5126/2015
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX
$346.60
Invoice 2373408
Cash Payment
E 609 -49750 -265 Freight
FREIGHT
Cash Payment
E 609 -49750 -252 Beer For Resale
$11.25
Invoice 182143
5/2612015
612/2015
Cash Payment
Transaction Date
612/2015
Wells Fargo
10100
Total
$727.25
Refer
13 HOHENSTEINS, INCORPORATED
_
BEER
$77.00
Invoice 2362146
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX
$719.25
Invoice 764569
5/27/2015
Transaction Date
6/2/2015
Transaction Date
6/2/2015
Wells Fargo
10100
Total
$719.25
Refer
14 J & N SPECIALTY IMPORTS, LLC
_
$30.00
Invoice 5107783-
3/4/2015
Cash Payment
E 609 - 49750 -253 Wine For Resale
WINE
E 609 -49750 -251 Liquor For Resale
LIQUOR CREDIT
$134.76
Invoice 1131
5/23/2015
Cash Payment
_
Transaction Date
6/2/2015
Wells Fargo
10100
Total
$134.76
Refer 18 JJ TAYLOR. DISTRIBUTING MINN
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$2,687.70
Invoice 2362164
5/26/2015
Cash Payment
E 60949750 -254 Soft Drinks /Mix For Rasa MIX
$91.20
Invoice 2362163
5/26/2015
Transaction Date
6/2/2015
Wells Fargo 10100
Total $2,778.90
Refer
17 JJ TAYLOR. DISTRIBUTING MINN
_
Cash Payment
E 60949750 -252 Beer For Resale
BEER
$2,768.05
Invoice 2373407
6/2/2015
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX
$346.60
Invoice 2373408
6/2/2015
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$68.40
Invoice 2373421
612/2015
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$207.50
Invoice 2373413
612/2015
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$77.00
Invoice 2362146
5122/2015
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX
$253.00
Invoice 2362180
5/29/2015
Transaction Date
6/2/2015
Wells Fargo 10100
Total $3,720.55
Refer
19 JOHNSON BROTHERS LIQUOR
-
Cash Payment
E 609 -49750 -251 Liquor For Resale
LIQUOR
$30.00
Invoice 5107783-
3/4/2015
Cash Payment
E 609 -49750 -251 Liquor For Resale
LIQUOR CREDIT
-$0.67
Invoice 525840
518/2015
Cash Payment
E 609- 49750 -253 Wine For Resale
WINE CREDIT
- $48.56
Invoice 525839
5/8/2015
Transaction Date
6/2/2015
Wells Fargo 10100
Total - $19.23
Refer
20 JOHNSON BROTHERS LIQUOR
-
-1414-
CITY OF MOUND 06/03/1511:42 AM
Page 4
Payments
Current Period: June 2015
Cash Payment
E 609 -49750 -255 Misc Merchandise For R
MERCH- GLASSES
$22.25
Invoice 5172433
5/28/2015
Cash Payment
E 609- 49750 -251 Liquor For Resale
LIQUOR
$3,205.92
Invoice 5172434
5/28/2015
_
Cash Payment
E 609- 49750 -253 Wine For Resale
WINE
$357.30
Invoice 5172435
5/28/2015
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$87.96
Invoice 5172436
5/28/2015
Cash Payment
E 609 -49750 -251 Liquor For Resale
LIQUOR
$2,303.38
Invoice 5172431
5/28/2015
Cash Payment
E 609 - 49750 -253 Wine For Resale
WINE
$1,154.45
Invoice 5172432
5/28/2015
Transaction Date
6/2/2015
Wells Fargo 10100
Total $7,131.26
Refer
21 MARLIN S TRUCKING DELIVERY
_
Cash Payment
E 609 -49750 -265 Freight
DELIVERY SVC 5 -18 -15 HWS
$59.45
Invoice 30827
5/1812015
Cash Payment
E 609 - 49750 -265 Freight
DELIVERY SVC 5 -21 -15 HWS
$332.05
Invoice 30845
5/21/2015
Cash Payment
E 609- 49750 -265 Freight
DELIVERY SVC 5 -29 -15 HWS
$285.65
Invoice 30867
5/29/2015
_
Transaction Date
6/2/2015
Wells Fargo 10100
Total $677.15
Refer 22 MOUND, CITY OF
Cash Payment
E 609- 49750 -382 Water Utilities
WATER SERVICE 4 -1 -15 THRU 5 -1 -15 HWS
$52.27
Invoice 060915
5/20/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$52.27
Refer
23 PAUSTIS AND SONS WINE COM_ PA
_
Cash Payment
E 609 -49750 -253 Wine For Resale
WINE
$2,214.61
Invoice 8500286
5/26/2015
Cash Payment
E 60949750 -265 Freight
FREIGHT
$42.50
Invoice 8500286
5/26/2015
Cash Payment
E 609 - 49750 -253 Wine For Resale
WINE
$2,004.66
Invoice 8501116
6/1/2015
Cash Payment
E 609 - 49750 -265 Freight
FREIGHT
$28.75
Invoice 8501116
6/1/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$4,290.52
ReferW
24 PHILLIPS WINE AND SPIRITS, INC
_
Cash Payment
E 609 - 49750 -253 Wine For Resale
WINE
$428.00
Invoice 2795025
5/28/201.5
Cash Payment
E 609 -49750 -251 Liquor For Resale
LIQUOR
$61.50
Invoice 2795024
5/28/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$489.50
Refer
25 SHANKEN COMMUNICATIONS, IN
_
Cash Payment
E 609 -49750 -255 Misc Merchandise For R
WINE SPECTATOR PUBLICATIONS 5 -31 -15
$15.00
EDITION
Invoice 50454179 5/15/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$15.00
Refer _
28 SIMPLE GRACE PROMOTIONS, IN
- -1415-
CITY OF MOUND 06/03/1511:42 AM
Page 5
Payments
Current Period: June 2015
Cash Payment
E 609 -49750 -340 Advertising
4" X 3" ADHESIVE NOTEPADS- 25 SHEETS-
$1,474.46
HWS
Invoice S -1192
5/27/2015
Transaction Date 6/3/2015
Wells Fargo 10100 Total
$1,474.46
Refer
26 SOUTHERN WINE & SPIRITS OF M
_
Cash Payment
E 609- 49750 -253 Wine For Resale
WINE
$3,108.00
Invoice 1290069
5/29/2015
Cash Payment
E 609 -49750 -251 Liquor For Resale
LIQUOR
$1,076.18
Invoice 1290068
5/29/2015
Cash Payment
E 609 - 49750 -254 Soft Drinks /Mix For Resa MIX
$112.63
Invoice 1290070
5/29/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$4,296.81
Refer
27 ST CLOUD REFRIGERATION, INC
_
Cash Payment
E609-49750-400 Repairs & Maintenance
REPAIR REFRIGERATION UNIT #2- THAW
$550.88
FROZEN COILS, CLEAN EVAPORATOR,
REPAIR LEAKS - REPLACE CONTACTOR &
CAPS 5 -4 -15 HWS
Invoice 298724
5/26/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$550.88
Refer
30 THORPE DISTRIBUTING COMPAN
_
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$92.75
Invoice 897021
6/2/2015
Cash Payment
E 609 - 49750 -252 Beer For Resale
BEER
$3,368.05
Invoice 897022
6/2/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$3,460.80
Refer
29 THORPE DISTRIBUTING COMPAN
_
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$118.00
Invoice 895903
5/25/2015
Cash Payment
E 609 -49750 -252 Beer For Resale
BEER
$3,628.46
Invoice 895903
5/25/2015
Cash Payment
E 60949750 -252 Beer For Resale
BEER CREDIT
Invoice 00751560 5/25/2015
Cash Payment
E 609-49750 -252 Beer For Resale
BEER CREDIT
- $3115
Invoice 320000
5/25/2015
Cash Payment
E 609- 49750 -252 Beer For Resale
BEER CREDIT
- $128.40
Invoice 319994
5/25/2015
Transaction Date
6/2/2015
Wells Fargo 10100 Total
$3,577.53
Refer
31 V/NOCOPIA, INCORPORATED
_
Cash Payment
E 609 - 49750 -251 Liquor For Resale
LIQUOR
$396.00
Invoice 0125295
5/28/2015
Cash Payment
E 609 - 49750 -265 Freight
FREIGHT
$4.50
Invoice 0125295
5/28/2015
Cash Payment
E 609 -49750 -253 Wine For Resale
WINE
$560.00
Invoice 0125293
5/28/2015
Cash Payment
E 609 - 49750 -265 Freight
FREIGHT
$9.00
Invoice 0125293
5/28/2015
Cash Payment
E 60949750 -254 Soft Drinks /Mix For Resa SODA
$120.00
Invoice 0125294
5/28/2015
-1416-
CITY OF MOUND
Payments
Current Period: June 2015
Cash Payment
E 609 - 49750 -265 Freight
FREIGHT
Invoice 0125294
5/28/2015
Cash Payment
E 609 -09750 -254 Soft Drinks /Mix For Rees SODA
Invoice 0124911
5/21/2015
Cash Payment
E 609 -49750 -265 Freight
FREIGHT
Invoice 0124911
5/21/2015
Cash Payment
E 609 - 49750 -251 Liquor For Resale
LIQUOR
Invoice 0124910
5/21/2015
Cash Payment
E 609- 49750 -265 Freight
FREIGHT
Invoice 0124910
5/21/2015
_
Transaction Date
6/2/2015
Wells Fargo 10100 Total
Refer
32 WACONIA BREWING COMPANY
_
Cash Payment
E 609-49750 -252 Beer For Resale
BEER
Invoice 3723
5/26/2015
'
Transaction Date
6/2/2015
Wells Fargo 10100 Total
Refer 33 WINE MERCHANTS
Cash Payment E 609 - 49750 -253 Wine For Resale
Invoice 7032161 5/28/2015
Cash Payment E 609 -49750 -253 Wine For Resale
Invoice 702777 5/15/2015
Transaction Date 6/2/2015
Refer 34 WIRTZ BEVERAGE MN BEER
WINE
WINE CREDIT
06/03/15 11:42 AM
Page 6
$9.00
$88.00
$7.50
$123.96
$2.50
$1,320.46
$360.00
$360.00
$2,228.64
- $144.00
Wells Fargo 10100 Total $2,084.64
Cash Payment E 609 -49750 -252 Beer For Resale
BEER
$3,672.95
Invoice 1090410306 5/27/2015
Cash Payment E 609 -49750 -252 Beer For Resale
BEER
$188.65
Invoice 1090410309 5/27/2015
Cash Payment E 609 -49750 -252 Beer For Resale
BEER
$80.00
Invoice 1090410310 5/27/2015
Cash Payment E 609 - 49750 -252 Beer For Resale
BEER
$353.10
Invoice 1090409342 5/22/2015
Transaction Date 6/2/2015
Wells Fargo 10100
Total $4,294.70
Refer 35 WIRT Z BEVERAGE MN WINE SP/RI
_
Cash Payment E 609 -49750 -253 Wine For Resale
WINE
$1,206.00
Invoice 1080329110 5/29/2015
Cash Payment E 609 -49750 -253 Wine For Resale
WINE
$36.00
Invoice 1080329111 5/29/2015
Cash Payment E 609 -49750 -251 Liquor For Resale
LIQUOR
$1,081.15
Invoice 1080328692 5/28/2015
Transaction Date 6/2/2015
Wells Fargo 10100
Total $2,323.15
-1417-
CITY OF MOUND 06/03/151142 AM
Page 7
Payments
Current Period: June 2015
Fund Summary
10100 Wells Fargo
609 MUNICIPAL LIQUOR FUND $67,220.81
$67,220.81
Pre - Written Check $0.00
Checks to be Generated by the Computer $67,220.81
Total $67,220.81
-1418-
CITY OF MOUND 06/04/159:18 AM
Page 1
Payments
Current Period: June 2015
Batch Name 060915CITY -2 User Dollar Amt $5,668.18
Payments Computer Dollar Amt $5,668.18
Refer
6 ANCOM COMMUNICAT IONS
Cash Payment
E 222 -42260 -325 Pagers -Fire Dept.
Invoice 53104
5127/2015
Transaction Date
6/3/2015
$0.00 in Balance
MINITOR V REPAIR
$95.00
Wells Fargo 10100 Total $95.00
Refer 10 ARSON INVESTIGATORS MINNES _
Cash Payment E222-42260-433 Dues and Subscriptions 2015 MEMBERSHIP RENEWAL TONY $25.00
MYERS- MNIAAI
Invoice 102464 2/26/2015
Transaction Date 6/3/2015 Wells Fargo 10100 Total $25.00
Refer 4 5 BERRY COFFEE COMPANY
Cash Payment 'E 222-42260-418 Other Rentals OASIS COUNTERTOP MODEL $72.00
COLD/TEMPTED RENTAL -FIRE DEPT
Invoice RENT24735 6/1/2015 _
Transaction Date 6/3/2015 Wells Fargo 10100 Total $72.00
_Refer_ 1 CARQUEST OF NAVARRE (PAM
Cash Payment E 101 - 45200 -500 Capital Outlay FA FLOOR MATS BLACK PARKS TRUCK #415 $120.09
F150
Invoice 6974 - 248552 5/8/2015
Cash Payment E 101- 45200 -500 Capital Outlay FA
Invoice 6974- 248598 5/11/2015
Cash Payment E 101- 45200 -500 Capital Outlay FA
Invoice 6974 - 248607 5/11/2015
Cash Payment E 101- 45200 -221 Equipment Parts
Invoice 6974 - 248941 5/15/2015
Transaction Date 613/2015
Refer 7 EMBEDDED SYSTEMS, INC
SEAT COVERS- PARKS TRUCK #415 F150 $52.78
BACKRACK STD & LIGHT MOUNT- PARKS $306.29
TRUCK #415 F150
SPINNER SKULL, GOLD BATTERIES- PARKS $111.88
VEHICLE
Wells Fargo 10100 Total $591.04
Cash Payment
E 101 - 42115 -329 Sirens /Phone Linesl
3 EMERGENCY SIRENS -6 MO MTCE FEE- 6-
$772.74
1 -15 THRU 12 -31 -15
Invoice 33722
5/18/2015
_
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$772.74
Refer a
8 FIRE EQUIPMENT SPECIALTIES, I
Cash Payment
E 222 - 42260 -210 Operating Supplies
FIREBOAT #11. PUMP ADAPTERS
$134.42
Invoice 8803
5128/2015
_
Transaction Date
613/2015
Wells Fargo 10100 Total
$134.42
Refer
13 LEAGUE MN CITIES INSURANCE T
Cash Payment
E 101 - 41110 -151 Worker s Comp Insuranc
FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$1.44
14 TO 2 -1 -15
Invoice 29922 5/17/2015
Cash Payment E 101 -41310 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1- $65.63
14 TO 2 -1 -15
Invoice 29922 5/17/2015
Cash Payment E 101 - 41500 -151 Workers Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1- $78.76
14TO21'°
Invoice 29922 5/17/2015 -1419-
CITY OF MOUND 06/04/159:18 AM
Page 2
Payments
Refer 11 O- REILLY AUTO PARTS
Cash Payment
Current Period: June 2015
3 QTY 230Z WAX- FIRE DEPT
$20.97
Invoice 2462240930 5/31/2015
Cash Payment
E 101 -42110 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$52.51
6/3/2015
14 TO 2 -1 -15
$20.97
Invoice 29922
5/17/2015
_
Cash Payment
E 101- 42400 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$65.63
GALLON LOTION SOAP- HWS
14 TO 2 -1 -15
Invoice 124555
Invoice 29922
5117/2015
Cash Payment
E 101 - 43100 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$761.33
$27.65
14 TO 2 -1 -15
5/13/2015
Invoice 29922
5117/2015
Transaction Date
Cash Payment
E 101 - 45200 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$323.43
14 TO 2 -1 -15
Invoice 29922
5/17/2015
Cash Payment
E 222- 42260 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$729.59
14 TO 2 -1 -15
Invoice 29922
5/17/2015
Cash Payment
E 281- 45210 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$42.00
14 TO 2 -1 -15
Invoice 29922
5/17/2015
Cash Payment
E 601 - 49400 -151 Workers Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$367.90
14 TO 2 -1 -15
Invoice 29922
5/17/2015
Cash Payment
E 602 -49450 -151 Workers Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$761.33
14 TO 2 -1 -15
Invoice 29922
5117/2015
Cash Payment
E 609 - 49750 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$241.52
14 TO 2 -1 -15
Invoice 29922
5/17/2015
Cash Payment
E 675 -49425 -151 Worker s Comp Insuranc FINAL AUDIT 2014 WORKERS COMP INS 2 -1-
$6.93
14 TO 2 -1 -15
Invoice 29922
5/17/2015
Transaction Date
6/3/2015 Wells Fargo 10100 Total
$3,498.00
Refer
12 MINNESOTA DEPT OF HEALTH _
Cash Payment
E 601- 49400 -438 Licenses and Taxes WATER SUPPLY SYSTEM OPERATOR
$23.00
RENEWAL CLASS D LICENSE- R. HANSON
Invoice 060915
613/2015
_
Transaction Date
6/3/2015 Wells Fargo 10100 Total
$23.00
Refer 11 O- REILLY AUTO PARTS
Cash Payment
E 222 -42260 -210 Operating Supplies
3 QTY 230Z WAX- FIRE DEPT
$20.97
Invoice 2462240930 5/31/2015
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$20.97
Refer
2TRUE VALUE HWS
_
Cash Payment
E 609 - 49750 -210 Operating Supplies
GALLON LOTION SOAP- HWS
$14.42
Invoice 124555
5/1/2015
Cash Payment
E609-49750-400 Repairs & Maintenance
32 WATT LN FLUORESCENT TUBE
$27.65
Invoice 124942
5/13/2015
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$42.07
Refer 3 TRUE VALUE MOUND (FIRE)
Cash Payment E 222- 42260 -210 Operating Supplies 25 PK 8" CABLE TIES, BLACK MOUNTING $7.45
BASE- FIRE DEPT
Invoice 124587 5/2/2015
-1420-
CITY OF MOUND 06/04/159:18 AM
Page 3
Payments
Current Period: June 2015
Invoice 125368
5/27/2015
DIAG CUT PLIERS- PARKS
$23.38
Transaction Date
6/3/2015
Wells Fargo 10100 Total
$5191
Cash Payment
4 TRUE VALUE, MOUND(PWPKS)
BLK S BINER, 4 PK AA LITH BATTERIES-
$17.79
_Refer
Cash Payment
E 609 -49750 -210 Operating Supplies
TRITAP ADAPTER
$1.79
Invoice 124658
514/2015
Cash Payment
E 101 -45200 -230 Shop Materials
SW BT SNAP 1 -PARKS
$5.21
Invoice 124707
5/612015
Cash Payment
E 101 - 43100 -230 Shop Materials
FG EYE BT WN- STREETS
$3.77
Invoice 124727
516/2015
PARKS
Cash Payment
E 101- 41930 -210 Operating Supplies
9V & AA BATTERIES- CITY HALL
$18.68
Invoice 124762
5/7/2015
Cash Payment
E 101 -45200 -230 Shop Materials
DOUBLE BOLT NSAP- PARKS
$3.14
Invoice 124786
518/2015
Cash Payment
E 101 - 45200 -232 Landscape Material
1.1 GAL HOME DEFENSE KILLER -PARKS
$14.84
Invoice 124787
5/8/2015
Cash Payment
E 601- 49400 -221 Equipment Parts
LAWNBOY AIR FILTER
$10.79
Invoice 124803
5/8/2015
Cash Payment
E 101 - 41930 -220 Repair /Maint Supply
WHITE NYLON CORD, SWIVEL BOLT SNAPS
$41.99
FLAG POLE OUTSIDE CITY HALL
Invoice 124873 5/11/2015
Cash Payment E 101 -43100 -230 Shop Materials 26 PT DEEP SOCKET, 3/8 SODKET ADAPTER $10.78
Invoice 124875 5/11/2015
Cash Payment E 101- 45200 -221 Equipment Parts GRI WHEEL- PARKS $4.31
Invoice 124881 5/11/2015
Cash Payment E 101 - 45200 -230 Shop Materials LEV FAUCET POP UP, CONNECTORS- $70.17
PARKS SHOP
Invoice 124887 - 5/1112015
Cash Payment E 101- 45200 -223 Building Repair Supplies GAL FLOOR FINISH- PARKS SHOP $16.19
Invoice 124941 5/13/2015
Cash Payment
E 101- 45200 -230 Shop Materials
DIAG CUT PLIERS- PARKS
$23.38
Invoice 124945
5/13/2015
Cash Payment
E 601 - 49400 -230 Shop Materials
BLK S BINER, 4 PK AA LITH BATTERIES-
$17.79
WTR DEPT
Invoice 124943
5113/2015
Cash Payment
E 101 - 45200 -230 Shop Materials
50' BLU EXTENSION CORD -PARKS
$77.39
Invoice 124954
5/13/2015
Cash Payment
E 101 - 45200 -230 Shop Materials
WHT PLASTIC KITCHEN TUBE, EXT TUBE-
$13.48
PARKS
Invoice 124993 5/14/2015
Cash Payment E 601 -49400 -230 Shop Materials SCREWS, NUTS, BOLTS -WTR DEPT $0.94
Invoice 125110 5/18/2015
Cash Payment E 101 - 45200 -232 Landscape Material 10 OZ LANDSCAPE ADHESIVE $5.39
Invoice 125200 5/21/2015 _
Transaction Date 6/3/2015 Wells Fargo 10100 Total $340.03
-1421-
CITY OF MOUND
Payments
Current Period: June 2015
Fund Summary
10100 Wells Fargo
101 GENERAL FUND
$3,021.23
222 AREA FIRE SERVICES
$1,130.89
281 COMMONS DOCKS FUND
$42.00
601 WATER FUND
$420.42
602 SEWER FUND
$761.33
609 MUNICIPAL LIQUOR FUND
$285.38
675 STORM WATER UTILITY FUND
$6.93
$5,668.18
Pre - Written Check $0.00
Checks to be Generated by the Computer $5,668.18
Total $5,668.18
1422-
06/04/15 9:18 AM
Page 4
MOUND CITY COUNCIL MINUTES
May 26, 2015
The City Council of the City of Mound, Hennepin County, Minnesota, met in regular session on
Tuesday, May 26, 2015, at 7:00 p.m. in the council chambers of the Centennial Building.
Members present: Mayor Mark Wegscheid, Council Members Heidi Gesch, Ray Salazar, Kelli
Gillispie, and Jennifer Peterson
Members absent: None.
Others present: City Manager Kandis Hanson, Director of Finance /Clerk(Treasurer Catherine
Pausche, Community Development Director Sarah Smith, Director of Public Works Eric
Hoversten, Katie Morford, James Reuper, Aaron Zimmerman, Katy Nordhagen, Rob Bergh,
Josh Leddy, Chris Remis, Keith Anderson, Ellen Luken, Steve McDonald, Kevin Knopick.
Consent agenda: All items listed under the Consent Agenda are considered to be routine in
nature by the Council. There will be no separate discussion on these items unless a Council
Member or citizen so requests, in which event it will be removed from the Consent Agenda and
considered in normal sequence.
1. Open meeting
Mayor Wegscheid called the meeting to order at 7:00 p.m.
2. Pledge of Allegiance
3. Approve agenda
MOTION by Gesch, seconded by Gillispie, to approve agenda.
All voted in favor. Motion carried.
4. Consent agenda
Council Member Gillisipie asked for the removal of item 4G.
MOTION by Gillisipie, seconded by Gesch, to approve the consent agenda.
Upon roll call vote, all voted in favor. Motion carried.
A. Approve payment of claims in the amount of $359,075.72
B. Approve minutes: May 12, 2015 regular meeting
C. RESOLUTION NO. 15 -53: RESOLUTION AUTHORIZING PREPARATION OF PLANS
AND SPECIFICATIONS AND ORDERING RECEIPT OF QUOTES FOR THE 2015
CRACK SEAL AND SEAL COAT PROJECTS, CITY PROJECTS PW -15 -07 AND PW-
15-08
D. RESOLUTION NO. 15 -54: RESOLUTION AUTHORIZING CITY MANAGER TO SIGN
PROPOSAL FOR CONSTRUCTION OBSERVATION AND MATERIALS TESTING
SERVICES FOR THE 2015 STREET, UTILITY & RETAINING WALL IMPROVEMENTS
- GRANDVIEW BOULEVARD AND TUXEDO BOULEVARD PROJECT, CITY
PROJECTS NO. PW -15 -01 AND PW -15 -02
-1423-
Mound City Council Minutes —May 26, 2015
E. Approve payment of invoice from AET, Inc., in the amount of $2,371.10, for geotechnical
services supporting Bartlett watermain improvements, City Project PW -15 -09
F. Approve payment of invoice from AET, Inc., in the amount of $1,750, for geotechnical
services supporting Lift Station C -2 replacement, City Project PW -15 -04
G. Removed.
H. Approve Public Gathering Permit for 2015 Red Ribbon Bike Ride on Dakota Regional
Trail as it passes through Mound and for use of Wolner Field
I. RESOLUTION NO. 15 -55: RESOLUTION TO AUTHORIZE CITY MANAGER TO
ENTER INTO A CONTRACT WITH SIMPLEX GRINNELL FOR FIRE AND SAFETY
SYSTEMS MONITORING SERVICES
Gillisipie requested removal in order to abstain from voting due to her position as President of
Westonka Community and Commerce.
MOTION by Gesch, seconded by Peterson, to approve the following resolution. The following
voted in favor: Wegscheid, Gesch and Peterson. The following voted against: None. The
following abstained: Gillisipie.
RESOLUTION NO. 15 -56: RESOLUTION APPROVING PERMITS FOR 2015 TASTE OF
TONKA SPECIAL EVENT AND REDUCED PUBLIC GATHERING PERMIT APPLICATION
FEE DUE TO PUBLIC PURPOSE OF GATHERING
5. Comments and suggestions from citizens present on any item not on the agenda.
Jim Rueper, 4815 Island View Drive, said that he is the volunteer bay captain for the Lake
Minnetonka Association AIS treatment and that he is here to request funding. Josh Leddy, the
project manager for the Lake Minnetonka Association, said they are requesting $12,000 from
Mound as it owns 3/5th, of the shoreline in Phelps Bay.
Mayor Wegscheid said $3,000 was budgeted and he asked that Mr. Leddy prepare a formal
report and submit to the City to be placed on a future agenda for consideration.
Council Member Salazar arrived at 7:16 pm.
6. Public Hearing
Sarah Smith, Community Development Director, requesting consideration /action on request for
Conditional Use Permit for Metropolitan Council Environmental Services (MCES) L -39 lift station
infrastructure project on portion of City -owned property
PID No. 24-117-24-41-0001
Planning Case No. 15 -08
Applicant: HR Green, on behalf of the MCES
Sarah Smith, Community Development Director, provided background on the MCES L -39 lift
station and infrastructure project planned for the southeast corner of Wilshire Boulevard and
Bradford Lane, which is City owned property. Smith said the project qualifies as an Essential
Service Building per Sec 129 -2 of the code. A neighborhood meeting was held on April 9th and
-1424-
Mound City Council Minutes — May 26, 2015
the MCES is responding to requests for landscaping, screening and making the buildings as low
profile as possible.
Smith said Staff and the Planning Commission are recommending approval. Mayor Wegscheid
complemented the MCES for holding a public meeting to engage affected residents prior to the
issue coming to the City Council.
Mayor Wegscheid opened the public hearing at 7:25 pm.
Chris Remis, MCES, said the Met Council has 5 lift stations in Mound and showed maps of the
current and proposed location for the L39 lift station. Remis reviewed the goals, including
phasing out L40 lift station and replacing forcemain on Wilshire Boulevard. Relocating the L39
and decommissioning the L40 lift station will move them away from residential property and
make maintenance access easier for crews.
Keith Anderson, HR Green, Project Manager introduced architect Ellen Luken.
Ellen Luken, Luken Architecture, said there has been a collaborative effort to minimize impact.
Luken showed views of what the finished site would look like from the street level and
surrounding properties and emphasized the flat roof structure and dual roof height that
minimizes height/obstruction of view. Luken showed samples of proposed siding and colors.
Luken said the residents requested a black roof and windows will face away from residential
properties to reduce light at night.
Wegscheid asked if there have been any other residents come forward and Chris Remis said
no.
Mayor Wegscheid closed the public hearing at 7:37 pm.
Wegscheid thanked the team again for collaborating and providing for public input and
recommended that the same approach be used in similar situations in the future.
Requested Actions:
A. MOTION by Salazar, seconded by Gesch, to approve the following resolution. All voted in
favor. Motion carried.
RESOLUTION NO. 15 -57: RESOLUTION GRANTING CONDITIONAL USE PERMIT
APPROVAL FOR METROPOLITAN COUNCIL ENVIRONMENTAL SERVICES (MCES)
LIFT STATION INFRASTRUCTURE PROJECT ON PID NO. 24- 117 -24-41 -0001
B. MOTION by Salazar, seconded by Gesch, to approve the following resolution. All voted in
favor. Motion carried.
RESOLUTION NO. 15 -58: RESOLUTION APPROVING PUBLLIC LANDS PERMIT FOR
MCES L -39 LIFT STATION INFRASTRUCTURE PROJECT ON ROAD RIGHT OF WAY
-1425-
7.
Mound City Council Minutes —May 26, 2015
Applicant: Nathan Holm
Smith said the applicant is requesting a reduced set -back variance to allow for a 3 season porch
and deck. Smith said the applicant is trying to utilize French doors that were installed by a
former owner. Staff recommends approval of a variance with conditions, and to reduce the size
of the deck from 12' x 14' to 12' by 12' in order to minimize the variance. Smith noted a six foot
side setback is allowed and the code states any variance should be minimized. Smith stated
the original plan would have only needed a 1' variance and now they are requesting a 3'
variance. Smith noted a three foot setback per the building code requires 25% maximum of
windows and doors and requires a 1 hour fire door.
The Planning Commission recommended a 3' variance and Staff is recommending a 1'
variance. Since the Planning Commission and Staff recommendations differ, a resolution was
not prepared in advance. Staff requests direction be provided in order to assist in preparing the
findings of fact and demonstrating the practical difficulty test.
Mayor Wegscheid asked if the original permit was 12 x 12. Smith said yes, but the original plan
did note 12 x 14 was preferred but they tried to make it conforming. Once it was determined the
property line was not where they thought it was and a variance was needed either way, they
decided to make it 12 x 14. The original plan would have required a 1 foot variance vs. the 3
feet that is currently being requested.
Smith said the Planning Commission considered the original plan and intent and that it
appeared the resulting 3 feet setback was adequate. Gesch asked why they would just not turn
the porch and run the 14' along the side of the house. Gesch asked about the set -backs for the
neighboring property and Smith said it would be either 6 or 10 feet and they, too, would be
eligible to ask for a setback variance.
Nathan Holm, 5079 Bartlett Boulevard /applicant, noted the huge space between the proposed
plan and the neighbor's garage, although he said he understood that could change, but feels it
is unlikely. Holm stated that since a variance was going to be required after the original
application, he thought he would go for the larger variance since there are additional benefits
with not that much more cost.
Salazar asked about the existing footings and that they are 12' from the house and Holm said
they would be removed either way. Wegscheid said he sees both sides and wants to hear from
the other Council Members. Peterson said the Planning Commission could have gone either
way, but she now believes the 12 x 12 is more appropriate based on Staff's report presented in
the packet.
Gillispie asked about other 3 foot variances. Smith said variances should not set precedent and
that they are individual to a site. Smith struggles with the fact that 12 x 12 appears a
reasonable improvement. Wegscheid said he recognizes the layout of the house on the lot and
that there is a lot of open space on the other side, but said the Council has to anticipate what if
the neighbor most impacted by the variance wanted to make changes, however unlikely.
Gillisipie asked about the neighboring side set -back. Smith said it would be between 6 and 10
feet, depending. Salazar asked about the reason for the additional two feet and Holm said just
-1426-
Mound City Council Minutes —May 26, 2015
comfort and increased property value. Wegscheid said that plays into the practical difficulty
argument.
Gesch said she questions the practical difficulty because there are options, but she thinks it
should be 12 feet out from the house and the applicant can decide what to do with the length.
Salazar agreed and said the objective is to minimize the variance.
Holm asked why is there a Planning Commission. Wegscheid said they are advisory and exist
to provide a system of checks and balances. The Council has to balance Staff and the Planning
Commission recommendations and that the Council ultimately has to vote their conscience.
Smith said often all three are in agreement, Staff, Planning Commission and Council, but often
there is a combination thereof. Holm asked why a Planning Commissioner does not present the
case in front of the Council and Wegscheid said the Council Liaison is here to represent the
Planning Commission discussion.
MOTION by Wegscheid, seconded by Salazar, to direct Staff to prepare a resolution for the next
meeting approving a one foot set -back variance for the proposed porch /deck at 5079 Bartlett
Boulevard as recommended by Staff and based upon the Council discussion. All voted in
favor. Motion carried.
8. Steve McDonald, representing Abdo, Eick & Meyers, LLP, presenting the 2014
Steve McDonald, Managing Partner, said the unmodified opinion is the best possible and no
findings were noted on internal controls. McDonald highlighted other audit objectives.
Kevin Knopik, Audit Manager, reviewed the financial information in the management letter.
Knopik said the 43% General Fund balance is healthy, the budget to actual was favorable, and
the per capita expenditures was very comparable to the peer group average. Knopik noted the
recommended cash balance for the enterprise funds is 25% of operating costs plus next year's
debt service. Knopik noted the debt service coverage is 84% and the goal should be over
100 %. Peer group averages are provided to give perspective. Knopik noted that GASB 68 will
be implemented in 2015 and that it will have some impact on the financials. The auditor's will
work with staff to implement that standard.
Wegscheid said he likes the way the information is laid out in the Management Letter and
thanked the auditors for their effort.
MOTION by Salazar, seconded by Gesch, to approve the receipt of the 2014 Comprehensive
Annual Financial Report (CAFR) and Management Letter and thanking AEM. All voted in favor.
Motion carried.
9. Kandis Hanson, City Manager, presenting Certificate and Award of Financial
Hanson read a press release from the Government Finance Officers Association (GFAO) and
stated this was the 26th consecutive year of the City receiving the award and that it
demonstrates the high standards in which the CAFR was prepared. Hanson thanked Pausche
for her diligence, responsiveness and dedication. Pausche thanked Hanson for her comments.
1427-
Mound City Council Minutes — May 26, 2015
10. Information /Miscellaneous
A. Comments /reports from Council Members /City Manager
Hanson reported the Mound Fire Fish Fry is June 6th, with dinner from 3 pm to 8pm
with music to follow. Tickets are available from fire fighters going door to door, at
City Hall or Harbor Wine and Spirits, or at the event itself.
Gillispie mentioned the DARE Golf Tournament Fundraiser is Friday, June 5th and
that the first Taste of Tonka will be held on September 1gth and is sponsored by
Westonka Community and Commerce.
B. Minutes:
C. Reports:
D. Correspondence: Lake Minnetonka Conservation District - Draft 2016 Budget
Mediacom letter: May 8, 2015
Met Council 2014 population estimate: May 14, 2015
11. Adiourn
MOTION by Salazar, seconded by Gesch, to adjourn at 8:41 p.m. All voted in favor.
Motion carried.
Attest: Catherine Pausche, Clerk
-1428-
Mayor Mark Wegscheid
F, 4 ' q$k a
MEMORANDUM
Date: June 2, 2015
To: Honorable Mayor and City Council Members
From: Catherine Pausche, Director of Finance and Administrative Services
Subject: Public Lands Permit for Dredge of 4730 Galway Road Abutting Dock Site
The Docks and Commons Commission (DCC) discussed a public lands permit for a dredge of
4730 Galway Road abutting dock site, Applicant Justin Rock, at the May 21, 2015 DCC regular
meeting.
The DCC unanimously approved a recommendation to the City Council to approve the public
lands permit. An excerpt of the drat meeting minutes follows:
1. Public Lands Permit - 4730 Galway Road
Pausche stated she has researched records to find a similar request and has not been able to.
Pausche could only find projects that the City funded. Pausche said the final recommendation
will contain conditions that ensures the City is not liable in any way and is not responsible for
any wetland rules. Pausche said she sees this as benefiting the public because it makes one of
the dock sites more usable.
MOTION by Osmek, seconded by Funk, to approve the public lands permit for abutting
property 4730 Galway Road Dock Site NIP -08979 dredge project with any conditions
offered by staff. All voted in favor. Motion carried.
The accompanying resolution contains conditions and a waiver of the public lands permit fee of
$200 because the proposed dredge provides a public benefit by improving the usability of one of
our City dock sites. Input was obtained from City Attorney Melissa Manderschied, Mark Perry,
Natural Resource Specialist/Wetland Consultant for Bolton and Menk, City Staff, and the
MCWD. This will establish the requirements for future privately funded dredge projects. Staff
recommends approval of the public lands permit.
Please let me know if you have any questions regarding this matter.
-1429-
CITY OF MOUND
RESOLUTION NO. 15-
RESOLUTION TO APPROVE PUBLIC LANDS PERMIT
4730 GALWAY ROAD DREDGE PROJECT
WHEREAS, the applicant, Justin Rock, is seeking a Public Lands Permit to dredge the
area of abutting dock site NIP -08979 in Excelsior Commons; and
WHEREAS, Section 62 -11, requires City Council approval by a majority vote for
construction of any kind on any public way, park or commons, or the alteration of the
natural contour of any public way, park or commons; and
WHEREAS, the City of Mound is located in the Minnehaha Creek Watershed District
(MCWD); and
WHEREAS, the MCWD is the agency responsible for dredge permitting activities on
Lake Minnetonka; and
WHEREAS, Staffs familiarity with the site and low water conditions deems the project
necessary and feasible; and
WHEREAS, the Docks and Commons Advisory Commission recommended approval
with conditions at its May 21, 2015 Docks and Commons Commission meeting;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mound,
Minnesota, to approve the Public Lands Permit for a dredge project at 4730 Galway
Road abutting dock site NIP -08979 in Excelsior Commons as attached in Exhibit A and
made a part herein, with the following conditions:
MCWD approval of Water Resource Permit Application for dredge project,
including notification of affected property owners and a public hearing.
Any other required permits or forms that are needed by the MCWD to undertake
the project are completed or conditions met, including Landowner Statement and
Contractor Responsibility for Work in Wetlands or Public Waters
Submit in writing the planned truck route, access route, and equipment
location(s) to be approved by the City of Mound Director of Public Works
at least two weeks in advance of the dredge project.
4. Provide a repair /maintenance bond in amount deemed necessary to ensure any
damage to commons, roads, or other City or privately owned property as a result
of this project will be restored to the existing condition.
NOW, THEREFORE, BE IT FURTHER RESOLVED by the City Council of the City of
Mound, Minnesota, that the dredge project will be funded by the applicant and provides
a public benefit, therefore the Public Land i430- 0--nit fee of $200 is waived.
Adopted by the City Council this 9th day of June, 2015.
Attest: Catherine Pausche
-1431-
Mayor Mark Wegscheid
Exhibit A Page 1 of 4
DISTRIBUTION Building Official Parks Director
DNR MCWD
4� Public Works li Other
Check One
❑ CONSTRUCTION ON PUBLIC LAND PERMIT — new construction. NOTE: NO
PERMIT SHALL BE ISSUED FOR CONSTRUCTION OF BOAT HOUSES OR
OTHER BUILDINGS ON PUBLIC LAND - City Code Section 62 -11(a) & (b).
❑ PUBLIC LAND MAINTENANCE PERMIT — to allow repairs to an existing structure -
City Code Section 62- 11(c).
❑ CONTINUATION OF STRUCTURE — to allow an existing encroachment to remain in
an "as is" condition - City Code Section 62- 11(g).
® LAND ALTERATION — change in shoreline, drainage, slope, trees, vegetation, fill,
etc. - City Code Section 62- 11(d).
The structure or work you are requesting is an activity on publicly owned lands. Structures like boat houses, patios,
sheds, etc. are all NONCONFORMING USES. It is the intent of the City to bring all these uses into conformance, which
means that those structures will at some time in the future have to be removed from the public lands. All permits are
granted for a limited time and are non - transferable. Stairway construction must meet the State Building Code when the
permit is for new construction, or a new permit is applied for due to a change in dock site holder.
Please tvne or cirint legibly
APPLICANT
Name Justin Rock Email lustinjayrock @gmail.com
Address 7647 Mariner Pt Maple Grove MN 55311
Phone (H) (W) (M) 612- 508 -5870
ABUTTING
Address 4730 Galway Rd, Mound, MN 55364
PROPERTY
Lot Lot 000 Block 015 Seton Lots 15 16 17 and 18 Block
LEGAL
DESC.
Subdivision Seton
PID # 1911723230139 Zoning: R1 EDR2 R3 Bt B2 B3 (Circle one)
Public Lands Permit Application
Page 1 of 2
Revised 111812013 -1432-
Exhibit A Page 2 of 4
BL C
Name Email
OPERTY
F
Dock Site # 8979 Shoreline Type Rock
CONTRACTOR
Name Shoreline Services Inc. Email justinjayrock @gmail.com
Address 7647 Mariner Pt, Maple Grove, MN 55311
Phone (H) (W)651- 528 -5060 (M)612- 508 -5870
A FEE OF $200.00 APPLIES IF VALUATION OF PROJECT EXCEEDS $1,000.00 AND NO
PUBLIC BENEFIT IS DERIVED.
PROPOSED COST OF PROJECT (INCLUDING LABOR & MATERIALS) $1,000.00
DESCRIBE REQUEST & PURPOSE
Dredging area around proposed dock site #8979. Removing existing silt to off site location. Please review Dredging
exhibit for details.
Applicant's Signature Date _f 5
Public Lands Permit Application
Page 2 of 2
Revisod 111812013 -1433-
Exhibit A Page 3 of 4
ei
W
ova
RLL
42
(SN80GAdVa V =1:01) j - - - (
F T U- 0
... ...
J
�
� r�
Lu
+
((7NnowjoAi1o) 0, �
ei
u
;Z
Z
W
ova
0
Lu
ui z
O
3NV7
NONNV14S
O
u
;Z
Z
W
ova
0
Exhibit A Page 4 of 4
Print Form
WATER RESOURCE PERMIT APPLICATION FORM
Use this form to notify /apply to the Minnehaha Creek Watershed District (MCWD) of a proposed project or work which may fall within
their jurisdiction. Fill out this form completely and submit with your site plan, maps, etc. to the MCWD at:
15320 Minnetonka Blvd. Minnetonka, MN 55345.
Keep a copy for your records.
YOU MUST OBTAIN ALL REQUIRED AUTHORIZATIONS BEFORE BEGINNING WORK.
1. Name of each property owner: Justin Rock
Mailing Address: 7647 Mariner Pt. City: Maple Grove State: MN Zip: 55311
Email Address: justinjayrock @gmail.com Phone: 612 -508 -5870 Fax:
2. Property Owner Representative Information (not required) (licensed contractor, architect, engineer, etc...)
Business Name: Shoreline Service Inc. Representative Name: Justin Rock
Business Address: 7647 Mariner Pt. City: Maple Grove State: MN Zip: 55311
Email Address: justinjayrock @gmail.com Phone: 612- 508 -5870 pax:
3. Project Address: 4730 Galway Rd. City: Mound
State: MN Zip: 55364 Qtr Section(s): 3 Section(s): 19 Township(s): 117 Range(s): 23
Lot: 060 Block: 015 Subdivision: Seton Lots 15 16 17 18 piD: 1911723230139
4. Size of project parcel (square feet or acres): 11,200 sq It
Area of disturbance (square feet): 960 Volume of excavation /fill (cubic yards): 85
Area of existing impervious surface: Area of proposed impervious surface:
Length of shoreline affected (feet): 30 Waterbody (& bay if applicable): Black Lake
5. Type of permit being applied for (Check all that apply):
❑ EROSION CONTROL ❑ WATERBODY CROSSINGS /STRUCTURES
❑ FLOODPLAIN ALTERATION ❑ STORMWATER MANAGEMENT
❑ WETLAND PROTECTION ❑ APPROPRIATIONS
O DREDGING ❑ ILLICIT DISCHARGE
❑ SHORELINE /STREAMBANK STABILIZATION
6. Project purpose (Check all that apply):
0 SINGLE FAMILY HOME ❑ MULTIFAMILY RESIDENTIAL (apartments)
❑ ROAD CONSTRUCTION ❑ COMMERCIAL or INSTITUTIONAL
❑ UTILITIES ❑ SUBDIVISIONS (include number of lots)
❑ DREDGING ❑ LANDSCAPING (pools, berms, etc.)
❑ SHORELINE /STREAMBANK STABILIZATION ❑ OTHER (DESCRIBE):
7. NPDES /SDS General Stormwater Permit Number (if applicable):
8. Waterbody receiving runoff from site: Lake Minnetonka
9. Project Timeline: Start Date: August 31, 2015 Completion Date: September 18, 2015
Permits have been applied for: City ❑ County ❑ MN Pollution Control Agency P DNR ❑ COE ❑
Permits have been received: City ❑ County—M MN Pollution Control Agency ❑ DNR OCOE
By signing below, I hereby request a permit to authorize the activities described herein. I certify that I am familiar with MCWD
Rules and that the proposed activity will be conducted in compliance with these Rules. I am familiar with the information
contained in this application and, to the best of my knowledge and belief, all information is true, complete and accurate. I
understand that proceeding with work before all required authorizations are obtained may be subject to federal, state and/or local
admininwe, civil and/or criminal penalties.
Z � � --5~
Si nature of Each Property Owner Date
-1435-
.ra M--I, haha freek
e1C, I.`; s1 cc .pis t i ict is
rornnr, #ed fa n
, ;,. >ah:;, so a in
a,.:; ,rrnrjdn7 the
r -at< <s ara
sawce, ), -i.m:, the
+,clu7afg f)reil
lrn:,�i) !esuirti�u:,
( . i p+uieds.
: ^du; "n,ion, cooperurire
1e'BSS r <, arlC Oiilc'/
d', (p " based err
so(d)a science,
'Or 4 t '� t�i'ri:lSiRg, G %1
'si rfi, itwW the 0b
:ulitic funds.
QUALITY OF WATER
June 2, 2015
Justin Rock
7647 Mariner Pt.
Maple Grove, MN 55311
QUALITY OF LIFE
RE: MCWD Permit Application #15 -208: 4730 Galway Rd., Mound
Dear Mr. Rock,
Thank you for submitting an application for a Minnehaha Creek Watershed District permit
for Dredging for the installation of a dock located at 4730 Galway Road in the City of Mound.
The application was received on May 11, 2015.
After review of the application materials submitted, the proposed project triggers the
District's Dredging rule. Additional information is required to complete the application and
is outlined below. Based on additional information needed, the application is incomplete.
Permit applications that do not require a variance or exception to District Rules require a
public notice to all properties within 600 feet of the subject property, which includes a 14
day comment period allowing members of the public to receive further information and /or
request a public hearing. If a public hearing is requested, it will be scheduled on the first
available Board meeting after the application is determined by staff to be complete.
Applications that require a variance or exception to District Rules require approval of the
District Board of Managers which also includes the public notification process. Following the
completion of the public process and the District's determination that the permit application
is complete you will receive written notice of conditional approval. This notice will list the
conditions of the approval that will need to be complete prior to the permit being issued.
Please submit the following information:
Application Information:
1. A permit application form signed by the City of Mound.
Procedural Requirements:
This project requires a 14 -day public comment period. Please supply a certified list of
property owners and mailing labels for each property within 600 feet of the project location.
At the applicant's expense, the District will supply the mailing list and labels and will send
out the notice.
-1436-
Dredging:
The District's Dredging rule is triggered for any project proposing the removal of material from the beds,
banks, or shores of any public water or public waters wetland. Because this project proposes the
removal of accumulated sediment from the location of a proposed docking structure within a public
water of the state, the District's Dredging rule is triggered. To satisfy the criteria of the Dredging rule,
please submit the following information:
1. Written consent from the Minnesota Department of Natural Resources that the project is
permissible under MnDNR rules, orthat project is deferred to the Minnehaha Creek Watershed
District under the general permit.
As we review your submittals, we may find the need to request additional information, and will so
inform you. If you have any questions please contact me at tdietrich @minnehahahcreek.org or
(952) 641 -4518.
Sincerely,
Tom Dietrich
Permit & Compliance Coordinator
-1437-
L- 1 ® -.i 8,. N 4 A V r< I
Consulting Engineers & Surveyors
" 2638 Shadow Lane, Suite 200 • Chaska, MN 55318 -1172
Phone (952) 448 -8838 • Fax (952) 448 -8805
www.bolton- menk.com
June 2, 2015
Ms. Kandis Hanson, City Manager
City of Mound
2415 Wilshire Boulevard
Mound, MN 55364
IMNOR
RE: 2014 Street and Utility Improvement Project — West Three Points Blvd. Utilities
City Project Nos. PW -14 -01
Pay Request No. 2
Dear Ms. Hanson:
Please find enclosed Pay Request No. 2 from Geislinger & Sons, Inc. for work completed on the
2014 Street, Utility and Retaining Wall Improvement Project — West Three Points Boulevard
Utilities, from April 26, 2015 through May 25, 2015.
We have reviewed the contractor's request, verified quantities and recommend payment in the
amount of $198,597.97 to Geislinger & Sons, Inc.
Sincerely,
BOLTON & MENK, INC.
Daniel L. Faulkner, P.E.
City Engineer
cc: Catherine Pausche, Director of Finance
DATE: 602015
CONTRACTORS PAY REQUEST NO. 2 CONTRACTOR Gelslinger
& Sons
2014 STREET IMPROVEMENTS - WEST THREE POINTS BLVD UTILITIES OWNER
City of Mound
CITY PROJECT NOS. PW -14 -01 ENGINEER
Bolton
& Menk
BMI PROJECT NO, C12.107130
FOR WORK COMPLETED FROM 4/26/2015 THROUGH 6/25/2015
TOTALAMOUNT BID ........... ...................................._...........................I--............................. ............_......._..........
$
920,288.89
APPROVED CHANGE ORDERS........................... .. ...... .. ........ ..... ... .......... ............... ........... ............ ........
$
-
CURRENT CONTRACT AMOUNT ................ -- ................................................ ....... ...............................
$
920,288.89
TOTAL, COMPLETED WORK TO DATE ..................................................................................... ...............................
If
332,332.29
TOTAL, STORED MATERIALS TO DATE ........ ............................. ......................... ................... .... .......... I ... I .... ........
$
-
DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED.................................................... ..... --
$
-
TOTAL, COMPLETED WORK & STORED MATERIALS........... .............. ........................ -- ............. ,....... ..............
...1 $
332,332.29
RETAINEDPERCENTAGE 6% ) ....................................................................... ...............................
$
16,616.61
TOTAL AMOUNT OF OTHER DEDUCTIONS ....... .-............................. .........--- .......... -., ... . ..... ....... .....,.........
..,. $
-
NET AMOUNT DUE TO CONTRACTOR TO DATE.......................... ---- ................. -.. ...... ..... ...............................
$
315,715.66
TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES ................................................................ ...............................
$
117,117.71
PAY CONTRACTOR AS ESTIMATE NO. 2 ................................................................................. ...............................
$
198,597.97
Certificate for Payment
I hereby certify that, to the best of my knowledge and belief, all Items quantities and prices
of work and material shown on this Estimate are correct and that all work has been
performed In full accordance with the terms and conditions of the Contract for this project
between the Owner and the undersigned Contractor, and as amended by any
authorized changes, and that he foregoing is a true and correct statement of the amount
for the Final Estimate, that the provisions of M. S. 290.92 have been complied with and that
all claims against me by reason of the Contract have been paid or satisfactorily secured.
Contractor: Gelsiinger & Sons, Inc.
$11 Central Ave. S. PO Box 437
Watkins, MN 65389
Name Title
Date 6 -a ' 5�
CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT:
BOLTON & MEN, INC., ENGINEERS, 2838 S DO ITV CHASKA MN 58
M PROJECT ENGINEER
Daniel L. FFaulkknnerr -j'0, 1
Date lO d'. ys
APPROVED FOR PAYMENT:
Omer: CITY OF MOUND
By
Name Title Date
-1439-
8i , 1
�� Consulting Engineers & Surveyors
2638 Shadow Lane, Suite 200 • Chaska, MN 55318 -1172
Phone (952) 448 -8838 • Fax (952) 448 -8805
www.bolton- menk.com
June 4, 2015
Ms. Kandis Hanson, City Manager
City of Mound
2415 Wilshire Boulevard
Mound, MN 55364
RE: Bartlett Blvd. Watermain Improvement Project — Commerce Blvd to Lost Lake Bridge
City Project No. PW -15 -09
Pay Request No. 2
Dear Ms. Hanson:
Please find enclosed Pay Request No. 2 from Widmer Construction LLC for work completed on
the Bartlett Boulevard Improvement Project, Commerce Boulevard to the Lost Lake Bridge,
from April 26, 2015 through May 25, 2015.
We have reviewed the contractor's request, verified quantities and recommend payment to
Widmer Construction LLC in the amount of $15,472.81.
Sincerely,
BOLTON & MENKK, INC.
Daniel L. Faulkner, P.E.
City Engineer
cc: Catherine Pausche, Director of Finance
-1440-
DATE: 5/25/2015
CONTRACTOR'S PAY REQUEST NO. 2
CONTRACTOR Widmer
Construction
Bartlett Blvd. Watermain Improvements, Commerce Blvd. to Lost Lake Bridge
OWNER City of
Mound
CITY PROJECT NOS. PW -15 -09
ENGINEER Bolton
& Monk
BMI PROJECT NO. 012.108982
FOR WORK COMPLETED FROM 4/2512015 THROUGH 5/25/2015
TOTALAMOUNT BID ........ ..._.......... ......................................._....._...............................-......
.......................-- ...... $
406.008.60
APPROVED CHANGE ORDERS ........ ............................... .............. .--- ...... - ... -- ....
... ...... ... ......... ........ $
-
CURRENT CONTRACT AMOUNT. ... .._. ........ ....._.... ........ ._.._......... .._.......... ..... ...............................
$
406,008.60
TOTAL, COMPLETED WORK TO DATE ..... ............................. .............. ............................................
.............. ........ - $
366.27125
TOTAL, STORED MATERIALS TO DATE ... -- ...... -- ................................................................
............................... $
-
DEDUCTION FOR STORED MATERIALS USED IN WORK COMPLETED. ............................
...... - ..... ................. $
-
TOTAL, COMPLETED WORK & STORED MATERIALS ...... .......... - ........... ........... - ......................
....................... ... $
366,273.25
RETAINED PERCENTAGE ( 5% ) ...... ..... ............ .................. ......................................
- ..................... $
18,313.66
TOTAL AMOUNT OF OTHER DEDUCTIONS .......... ....... .......... .............. .... ... -- .................. ....
.......................... ..... $
-
NET AMOUNT DUE TO CONTRACTOR TO DATE ........... -- ....... - .............................................
............................... $
347,959.58
TOTAL AMOUNT PAID ON PREVIOUS ESTIMATES ................................................................
............................... $
332,48637
PAY CONTRACTOR AS ESTIMATE NO. 2 ..........................................................-.....................
............................... $
15,472.81
Certificate for Payment
I hereby certify that, to the best of my knowledge and belief, all items quantities and prices
of work and material shown on this Estimate are correct and that all work has been
performed in full accordance with the terms and conditions of the Contract for this project
between the Owner and the undersigned Contractor, and as amended by any
authorized changes, and that the foregoing is a true and correct statement of the amount
for the Final Estimate, that the provisions of M. S. 290.92 have been complied with and that
all claims against me by reason of the Contract have been paid or satisfactorily secured.
Contractor: Widmer Construction LLC
9455 County Road 15
Maple Plain, MN 55359
By
Date
CHECKED AND APPROVED AS TO QUANTITIES AND AMOUNT:
BOLTOB & MENK, Imo., ENGI63DON, SCHASKA MN 55 ENGINEER
Daniel L/. FF-/aulkner PROJECT `d%
Date A f
APPROVED FOR PAYMENT:
Owner: CITY OF MOUND
By
Name Title Date
-1441-
r ` Eac> ` 1 ®N GX e V s 1 V i k<
nl� Consulting Engineers & Surveyors
2638 Shadow Lane, Suite 200 • Chaska, MN 55318 -1172
Phone (952) 448 -8838 • Fax (952) 448 -8805
www.bolton - menk.com
June 2, 2015
Eric Hoversten, Director of Public Works
City of Mound
2415 Wilshire Boulevard
Mound, MN 55364
IN
RE: 2014 Street and Utility Improvements — West Three Points Blvd. Utility Improvements
City Project No. PW -14 -01
Braun Intertec Invoice for Construction Testing Services
Dear Eric:
Attached please find Braun Intertec's Invoice number B028732 dated 5/22/2015 in the amount of
$1,021.75 for engineering and soils testing services for the West Three Points Boulevard Utility project.
Invoice number B028732 is in conformance with Braun Intertec's proposal dated April 9, 2015 and
approved on May 5, 2015. I recommend payment of this invoice in the amount of $1,021.75 to Braun
Intertec.
Sincerely,
BOLTON &nMENNK, INC
Daniel L. Faulkner, P.E.
City Engineer
HWOUN\C 12107 130 \1_ Corres\D_Docs\2015 -06.02 Ltr of Recdn, Braun Construction Services Inv.doc
DESIGNING FOR A BETTER TOMORROW
Bolton & Menk is r- - -)pportunity employer
1442-
• + r \ �
INTERTEC
The Science You Build On.
7
Dan Faulkner Date 5/22/2015
City of Mound Invoice number 8028732
c/o Bolton & Menk, Inc. Project ID 81503025
2638 Shadow Lane Customer account M13913
Chaska, MN 55318 Customer PO
2014 Street, Utility, & Retaining Wall Impts SAP 145-
106 -003
Construction Materials Testing
Three Points Blvd., From Commerce Blvd. to Avocet
Lane
Mound, MN 55364
For Professional Services rendered through 5/15/2015
1 - MnDOT Testing
1.1 - Soil Testing
1.4 - Project Management
Amount Previously Invoiced: $0.00
Amount Invoiced to Date: $1,021.75
$706.25
$315.50
$1,021.75
Total Fees $1.021.75
Page 1 of 2
Please pay from this Invoice. En VJS4A 0I
Terms: Due on receipt, 11/2% per month after 30 days. 18% annual percentage rate. We accept
Projects: B1503025 - 2014 Street Utility, & Retaining Wail Impts SAP 145 -106 -003 Invoice number. B028732
Qty /Hours Rate Amount
1 - MnDOT Testing
1.1 - Soil Testing
Consulting Services Detail
Compaction Testing - Nuclear
4.75
74.00
351.50
Non -Salary Detail
Nuclear moisture- density meter charge, per hour
4.75
21.00
99.75
Standard Proctor Test(ASTM D 698)
1,00
175.00
175.00
CMT Trip Charge
2.00
40.00
80.00
Total 1.1 -Soil Testing
$706.25
1.4 - Project Management
Consulting Services Detail
Project Manager
1.75
158.00
276.50
Project Assistant
0.50
78.00
39.00
Total 1.4 - Project Management
$315.50
Total 1- MnDOT Testing
$1,021.75
Total Project
$1.021.75
Page 2 of 2
.,
• A live music permit is not required as the event is taking place during the day.
• An open sided tent(s) will be used at the event. No heater(s) will be in the tent(s).
Recommendation: Staff recommends approval of the requested Public Gathering Permit for the Dog
Days event, subject to the following conditions:
1. Applicant shall submit a final site plan for review and approval prior to release of the
Public Gathering Permit.
2. Applicant shall be responsible for procurement of all required public agency permits
that are needed to hold the event (i.e., the Hennepin County Transportation
Department, the Three Rivers Park District, etc.) Applicant is also required to
for ensuring that all vendors (i.e., food vendors, etc.) have all of the required permits
needed, including, but not limited to, a temporary food permit from Hennepin County
Environmental Health.
3. Applicant shall be responsible for obtaining a temporary sign permit, including
payment of $25.00 fee for the placement of a banner. Special event signage shall be
subject to the provisions of Code Section 119 -(i) (6). Applicant is responsible
for removal of all signage following the event.
4. Applicant shall work with the Orono Police Department, the Fire Department, and
and the Public Works Department regarding logistics for the upcoming event
including, but not limited to, equipment and personnel needs, site set -up and
staging, traffic /pedestrian control and circulation, road closure, etc. Applicant is
responsible for payment of fees for public safety or public services that may apply.
5. Amplified music, speakers and PA/sound systems are to be directed in the
direction best suited to minimize impact upon neighbors.
6. Applicant shall be responsible for obtaining all required agency permits required for
the event and shall provide copies of all said permits to the City prior to the issuance
and release of the Public Gathering Permit.
7. A reduced fee of $150.00 shall be charged for the event.
8. The portable restroom being provided for the event is required to be ADA compliant.
9. Applicant shall be in contact with the Mound Farmers' Market & More to inform
them of the upcoming event.
A (draft) resolution, based on Staffs recommendation, has been prepared for the Council's
consideration/action.
• Page 2
-1445-
CITY OF MOUND
RESOLUTION NO. 15-
RESOLUTION APPROVING PUBLIC GATHERING PERMIT FOR 2015 DOG DAYS
EVENT WITH A REDUCED FEE DUE TO PUBLIC PURPOSE OF GATHERING
WHEREAS, on December 9, 2014, the City Council of the City of Mound adopted
Resolution 14 -111 to establish its fee schedule for 2015 ( "Fee Schedule "); and
WHEREAS, the Fee Schedule set a public gathering permit fee range from $300 -600 per
day with the actual amount to be determined by the City Manager and City Staff upon receipt of
the permit application stating the specific use and requirements of the City for the proposed
public gathering; and
WHEREAS, pursuant to the requirements of City Code of Ordinances, Section 50 -20,
Westonka Community & Commerce submitted a public gathering permit application for the
2015 Dog Days event to be held on Saturday, August 22, 2015, on Auditor's Road and
surrounding vicinity; and
WHEREAS, City Staff has reviewed said application and has recommended reasonable
conditions to protect the public's investment in its public parks and commons areas as set forth in
a staff memo to the City Council dated June 4, 2015 ("Conditions"),- and
WHEREAS, the City Manager and City Staff desire to waive a portion of said fee and to
charge a reduced fee of $150 for the proposed public gathering because it is a public celebration
that benefits the community as a whole, it requires an extremely limited amount of city
expenditures, and the primary objective of the event is not to benefit a private interest but rather
to showcase the economic, recreational, and residential opportunities and amenities located
within the City of Mound as a whole and within the geographic area of the proposed public
gathering.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mound as
follows:
1. The recitals set forth above are incorporated into this Resolution.
2. A reduced fee of $150 is in the public interest due to the overwhelming public benefits
and extremely limited demands on city resources arising from the 2015 Dog Days event.
3. The Public Gathering Permit for the 2015 Dog Days event is hereby approved with
Conditions.
Passed by the City Council this 9th day of June
Attest: Catherine Pausche, Clerk
Mayor Mark Wegscheid
-1446-
CITY OF MOUND
5341 MAYWOOD ROAD
MOUND, MINNESOTA 55364
PUBLIC GATHERING PERMIT
Use of a public park or commons by any group consisting of 15 or more individuals.
Use is not to interfere with traffic and general use of the park or commons or to be beyond the
ability of the police in maintaining order.
NO LIQUOR OR BEER MAY BE USED IN ANY OF THE CITY PARKS OR BUILDINGS.
Group is to remove all litter and trash and provide a deposit to insure cleaning up of the park area.
PERMIT FEE: $300 /DAY TO $600 /DAY*
DAMAGE DEPOSIT: $500 TO $1000 /DAY*
*Permit fee and damage deposit amount to be determined by City Manager and City Staff
upon receipt of application stating specific use and requirements.
Date(s) of Use
Area to be Used
Time Frame 00 A'( h -'c I r oo {M
Intended Use N� 0�Q/V�F-�/r t�kp= )
Expected Attendance �4 00 —beo i
Organization
Representative's Name
Address b 2� q t- f I u) U-
k-)
Telephone No. Home: qn q,7�A `-CMS Work: 15A
Drivers License Numbe__,
Departmental Approval
City Clerk
Police Dept.
Park Dept.
- 1447 -Fire Dept.
2415 Wilshire Boulevard
Mound, MN 55364
(952) 472 -0604
MEMORANDUM
To: Honorable Mayor and City Council
From: Sarah Smith, Community Development Director
Date: 6/4/2015
Re: June 9, 2015 City Council Consent Agenda Item — Public Gathering Permit for "Fishing for
Life"
Overview. Brenda Frommes has reserved the Mound Depot and has also submitted a Public
Gathering Permit application for an upcoming event called "Fishing for Life" to be held on Friday, June
19, 2015 from 7:00 a.m. to 2:00 p.m. at Surfside Park and Beach. The event provides a free, guided
day of fishing for military families and matches up a volunteer with a guest to take to them out for a
day of fishing on Lake Minnetonka with a lunch afterwards. The boats will arrive from volunteer
homes on the lake and /or from public launches on Lake Minnetonka, including the boat launch on
the east side of the park.
Comments.
• The event is by invitation only and approximately 95 guests are expected for the event.
The group has put on several of these events in past years including an event last summer at
lord Fletchers Restaurant. Based on information from the applicant, she has been in contact
with the LMCD, the MnDNR and the Hennepin County Sheriffs Water Patrol. No permit is
needed from the LMCD or the MnDNR. A permit is required from the Water Patrol and is
pending following the Council's action on the Public Gathering Permit. The Council is advised
that the applicant has indicated that the MnDNR is an emcee for the event.
Applicant information is that approximately 35-40 vehicles will be parked for the event. As
they have reserved the Depot, the parking spaces in the Depot lot are available for their use.
Additional parking will take place on street, as allowed by the parking regulations in the
subject area, or in the parking lot by the public launch on the east side of the park on a first
come, first serve basis with no special parking reserved for the event.
• Staff understands that there will be approximately 15 boats used for the event. Staff
recommends use of alternate boat launches for event volunteers who will be guides for the
event. The applicant requested reserved use of 6 boat /trailer parking spaces in the parking
lot by the boat launch. Boat /trailer spaces are available in the parking lot by the launch on a
first come, first serve basis with no special parking reserved for the event. Applicant is advised
that there is limited boat /trailer parking in the east parking lot by the public launch and that all
vehicle /trailer parking is required to be in accordance with established parking regulations
. / ;
• They are requesting use of the public launch dock and the Depot dock. Use of the Depot dock
is part of the request Public Gathering Permit. Use of the dock on the east side of the park
does not require City approval as it is a public launch .
e Event information will be shared with Mound Staff and Departments, including, but not
limited to, the Public Works and Parks Departments, the Orono Police Department, and the
Mound Fire Department; also involved agencies (i.e., Hennepin County Transportation, the
LMCD, the Hennepin County Sheriffs Water Patrol, etc.)
• No tent will be on site for the event.
• A banner is requested to be hung on the fence on the building deck.
RECOMMENDATION. Staff recommends approval of the requested permit subject to the following
conditions:
1. Payment of the required $300 fee and $500.00 damage deposit.
2. So as to allow for public use and enjoyment of the park, park use is restricted to the
area in and around the Depot building. Staff to work with the applicant to specifically
define the use area for the event and will be depicted on an approved final site plan.
3. Applicant shall be responsible for procurement of all required local and public
agency permits that are needed to hold the events. Applicant shall provide copies of
all said permits to the City priorto the issuance and release of the Public Gathering
Permit
4. Applicant shall work with the Orono Police Department, the Mound Fire
Department, and the Public Works and Parks Departments regarding logistics for the
upcoming event including, but not limited to, equipment and personnel needs, site
set -up and staging, traffic /pedestrian control and circulation, etc. Applicant is
responsible for payment of fees for public safety or public services that may apply.
5. As applicable, amplified music, speakers. and PA/sound systems are to be directed in
the direction best suited to minimize impact upon neighbors.
6. Placement of any and /or all temporary signs shall be subject to regulations contained
in City Code Chapter 119 and may include issuance of a permit and payment of the
required fee. Applicant shall work with the Community Development Department to
determine if a temporary sign permit is required.
7. No signage can be placed upon private property unless permission from the private
property owner and /or other interested party has been provided to the applicant who
shall be responsible for obtaining same.
8. Signage placement is subject to review and approval by the City of Mound. No signage
shall be placed in a location so as to affect vehicular and pedestrian traffic. The City of
Mound reserves the right to modify sign placement in the field.
• Page 2
-1449-
9. Signage placed outside of the City's approval of the temporary permit shall be subject
to removal by the City.
10. The submittal of a Certificate of Insurance, naming the City of Mound as an additional
insured , is required and shall be provided prior to the release and issuance of the
Public Gathering Permit. Required insurance and coverage shall be in accordance
with the City's established policies. Applicant to work with Finance Director Catherine
Pausche regarding the form and required amounts for the Certificate of Insurance.
11. Applicant is advised that no special parking approvals for event parking in the parking
lot by the launch area for vehicles or boat /trailer parking or on local streets
are granted as part of the Council's approval of the Public Gathering Permit.
12. If different from the application, contact information, including name and cell phone
number, for the person(s) who will be on site the day of the event shall be
provided prior to the release of the Public Gathering Permit.
13. The consumption of alcoholic beverages is not allowed for the event as it is not
allowed in Mound parks by ordinance.
14. Applicant shall be responsible for procurement of all required public agency permits
including but not limited to the Hennepin County Sheriffs Water Patrol, Hennepin
County, and the Lake Minnetonka Conservation District.
15. All refuse from the event will be removed by the applicant. Applicant is responsible for
monitoring the site during the event and appropriate clean up to ensure the park is in
good order following the event.
16. Pick up and drop off activities for event participants /guest at the Depot dock is
approved as part of the Public Gathering Permit.
17. Additional comments from Staff and the City Council.
• Page 3
-1450-
CITY OF MOUND
5341 MAYWOOD ROAD
MOUND, MINNESOTA 55364
PUBLIC GATHERING PERMIT
Use of a public park or commons by any group consisting of 15 or more individuals.
Use is not to interfere with traffic and general use of the park or commons or to be beyond the ability
of the police in maintaining order.
NO LIQUOR OR BEER MAY BE USED IN ANY OF THE CITY PARKS OR BUILDINGS.
Group is to remove all litter and trash and provide a deposit to insure cleaning up of the park area.
PERMIT FEE: $300/DAY TO $600/DAY* -t -200
DAMAGE DEPOSIT: $500 TO $1000/DAY* $ is-DO
*Permit fee and damage deposit amount to be determined by City Manager and City Staff
upon receipt of application stating specific use and requirements.
Date(s) of Use &I al 11 5
Area to be Used % n n f s d ocX4 o* SU.✓k rAl Ro-4 G
Time Frame OAC OA( pn i
Intended Use 6�M�eL � ffirr i1 _Rs k) 4 Cd 1 10�rmb &- .
Expected Attendance 9 5- ( /
Organization 6 5 a 0 -(v l i if
Representative's Name j'-P '�f -7�✓>� °rt9�11�- t'1GL1
Address 1>0 P&X (CM0 M10 (,T �yMN `554 H
Telephone No. Home: %(�3 ayS �1�ZQI `Work: (Q 12 1) B1 94 to (? u �4
Drivers License Number
Departmental Approval
City Clerk
Police Dept.
Park Dept.
Fire Dept.
-1451-
-uo
� -10
viS�
fjY S
\ �S� X� J
� � N
C�-
-1452-
s � 3
A
C
s � 3
is
v � •�`S o � u
A- vi 3
2415 Wilshire Boulevard
Mound, MN 55364
(952) 472 -0604
iTAfVA[O7:7_ 01 Bill IVA
To: Honorable Mayor and City Council
From: Sarah Smith, Community Development Director
Date: June 4, 2015
Re: June 9, 2015 City Council Consent Agenda Item — Resolution Approving Variance for
5079 Bartlett Boulevard
Summary. As directed by the Council at its May 26th meeting, Staff has prepared a
resolution, approving a variance for a porch /deck project at 5079 Bartlett Boulevard
based on the Council's discussion, for consideration /action at its June 9th meeting.
Requested Action. A (draft) resolution, granting variance approval, subject to conditions, has
been prepared for consideration by the Council. Staff recommends approval.
-1453-
RESOLUTION NO. 15-
RESOLUTION APPROVING VARIANCE FOR 5079 BARTLETT BOULEVARD
PLANNING CASE NO. 15 -01
WHEREAS, the applicant, Nathan Holm, applied for a variance to the required
six (6) foot side -yard setback requirement to allow the construction of a 3-
season porch and deck at 5079 Bartlett Boulevard; and
WHEREAS, the property is located in the R -1 single family residential zoning
district; and
WHEREAS, the 9,750 square foot property is located on the southeast side of
Bartlett between Glendale and Avon. The property currently has a home with an
attached garage that was built in 1974; and
WHEREAS, the current owner purchased the property in 2013. The home,
which was constructed in 1974, currently has a 10 foot setback on the west and a
17 foot setback on the east. The applicant would like to construct a three - season
porch that is approximately 12 feet by 14 feet in size and then a 6 foot by 14 foot
deck attached to the porch. The placement and size of the porch and deck would
result in a side yard setback of only 3 feet when a 6 foot minimum is required for
a lot of record; and
WHEREAS, a building permit was issued in 2014 for construction of a 12' x 12'
porch /deck addition, however, the project was not undertaken when the applicant
learned the proposed deck/porch addition would not meet the required side
setback requirement; and
WHEREAS, details regarding the requested variance for the proposed project
are contained in the Planning Commission Report No. 15 -01 and the submitted
application and supporting materials from the applicant; and
WHEREAS, City Code Section 129 -39 (a) identifies the following criteria to be
used when evaluating requests for variances:
(1) The variance proposed meets the criteria for Practical Difficulties as
defined in City Code Sub.129 -2.
(2) Granting of the variance requested will not confer on the applicant any
special privilege that is denied by this chapter to owners of other lands,
structures or buildings in the same district nor be materially detrimental
to property within the same zone.
-1454-
(3) The variance requested is the minimum variance which would alleviate
the practical difficulty.
(4) A variance shall only be permitted when it is in harmony with the
general purposes and intent of the zoning ordinance and when the
terms of the variance are consistent with the comprehensive plan.
; and
WHEREAS, "practical difficulties" is defined in City Code Section 129 -2 as
follows:
Practical Difficulties, as used in conjunction with a variance, means that:
(i) The property owner proposes to use the property in a reasonable
manner not permitted by the zoning ordinance;
(ii) The plight of the landowner is due to circumstance unique to the
property including unusual lot size or shape, topography or other
circumstances not created by the landowner; and
(iii) The variance, if granted, will not alter the essential character of the
locality.
Economic considerations alone do not constitute practical difficulties.
Practical difficulties include, but are not limited to, inadequate access
to direct sunlight for solar energy systems.
WHEREAS, Staff recommended approval of the variance subject to conditions;
and
WHEREAS, the variance request was reviewed by the Planning Commission at
its May 5, 2015 meeting; and
WHEREAS, based on its review, the Planning Commission unanimously voted
to recommend Council approval of the variance, as recommended by Staff,
excluding the condition requiring modification of the porch /deck addition to the
same size that was originally approved with the building permit for the project
issued in 2014; and
WHEREAS, the City Council reviewed the variance request at its May 26, 2015
meeting and determined that approval would allow the property to be used in a
reasonable manner; and
WHEREAS, the City Council unanimously voted to direct Staff to prepare a
resolution for the next meeting approving a one foot set -back variance for the
proposed porch /deck at 5079 Bartlett Boulevard, as recommended by Staff,
based upon the Council discussion; and
-1455-
WHEREAS, the City Council's decision on the variance application was made
within the timelines included in Minnesota Statutes 15.99; and
WHEREAS, in granting approval of the variance request, the City Council hereby
makes the following findings of fact:
The criteria of City Code Section 129 -39 (a) are being met.
2. The addition of a three - season porch and deck is a reasonable use and is
in harmony with the general purposes and intents of the zoning ordinance
and comprehensive plan.
3. The placement of the house on the lot and the internal layout of the house
limits the location and design options for a three - season porch and deck.
The placement of the three - season porch in this location was also
influenced by the previous owners, who had already installed a set of
french doors in this location.
4. Modifying the porch /deck addition to 12'x 12' minimizes the variance to
undertake the proposed addition project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Mound does hereby approve a one (1) foot side setback variance for the
porch /deck project at 5079 Bartlett Boulevard with the following conditions:
The plans for the porch /deck addition be revised to original proposal for a
12' x 12' addition.
2. Applicant shall be responsible for payment of all costs associated with the
land use request.
3. No future approval of any development plans and /or building permits is
included as part of this action.
4. Applicant shall provide all required information upon submittal of the
building permit application.
5. Impervious surface coverage shall be less than 40% of the site. Hardcover
calculations will be verified as part of building permit process.
6. Applicant shall be responsible for procurement of any and /or all local or
public agency permits including, but not limited to, the submittal of all
required information prior to building permit issuance.
7. The applicant shall be responsible for recording the resolution with
Hennepin County. The applicant is advised that the resolution will not be
released for recording until all conditions have been met.
-1456-
8. No building permit will be issued until evidence of recording of the
resolution at Hennepin County is provided unless an escrow of sufficient
amount is on file with the City. The applicant may also direct the City to
record the resolution with the fees to be taken out of the escrow.
9. Effective September 1, 2011, new Minnehaha Creek Watershed District
(MCWD) rules related to wetlands, floodplain, erosion control and others
are in effect. These rules are now under the jurisdiction of the MCWD as
regulatory authority and permitting was officially turned back to the District
by the Mound City Council on August 23, 2011. Applicant is directed to
contact the MCWD related to the new regulations and applicable permits
that may be needed to undertake the proposed project. Evidence from the
MCWD in the form of a permit or waiver must be provided before release
of any future building permit.
The variance is hereby approved for the following legally described property on
the attached Exhibit A.
Adopted by the City Council this 9th day of June.
Attest: Catherine Pausche, Clerk
Mark Wegscheid, Mayor
-1457-
Exhibit A
2415 Wilshire Boulevard
Mound, MN 55364
(952) 472 -0604
MEMORANDUM
To: Honorable Mayor and City Council
From: Sarah Smith, Community Development Director
Date: June 4, 2015
Re: June 9, 2015 City Council Consent Agenda Item — 2015 Music in the Park
Summary. Westonka Community Education has submitted and is requesting approval
of the permits that are required for this year's Music in the Park program held at Surfside
Park and Beach on Thursdays from 6:00 p.m. to 8:00 p.m. on the following dates:
June 11
June 18
June 25
July 9
July 23
As Council members are aware, this is an annual summer concert series held during June and
July at Surfside Park and Beach for community enjoyment. Staff is recommending waiver
of the involved permit fees. The requested permits are outlined below:
A. Public Gathering Permit
B. Seasonal Banner and Portable Sign Permit
A (draft) resolution, approving the permit applications, subject to conditions, based on Staff's
recommendation, has been prepared for the Council's consideration.
-1459-
CITY OF MOUND
RESOLUTION NO. 15-_
RESOLUTION APPROVING PERMITS RELATED TO THE 2015 MUSIC IN THE PARK
WITH FEES WAIVED DUE TO PUBLIC PURPOSE OF GATHERING
WHEREAS, on December 9, 2014, the City Council of the City of Mound adopted
Resolution 14 -111 to establish its fee schedule for 2015 ( "Fee Schedule "); and
WHEREAS, the Fee Schedule set public gathering permit fee range from $300 -600 per
day with the actual amount to be determined by the City Manager and City Staff upon receipt of
the permit application stating the specific use and requirements of the City for the proposed
public gathering and permit fees for temporary signs; and
WHEREAS, pursuant to the requirements of City Code of Ordinances, Section 50 -20, on
June 4, 2015, Mound Westonka Community Education submitted public gathering permit and
temporary sign applications for the 2015 Music in the Park concert season, that is an annual
event held during the summer months at Surfside Park and Beach; and
WHEREAS, the City Council, upon recommendation of the City Manager and city staff,
have reviewed said applications;
WHEREAS, the City Manager and City Staff desire to waive the related permit fees
associated with the summer music program as it benefits the community as a whole and the
primary objective of the event is not to benefit a private interest but rather to encourage
community participation and is open to all residents.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mound as
follows:
1. The recitals set forth above are incorporated into this Resolution.
2. The following permits are approved:
a. Public Gathering Permit
b. Temporary Sign Permit
3. All permit fees for 2015 Music in the Park music program are waived as the activities
are in the public interest due to the overwhelming public benefits.
4. Applicant shall be responsible for making arrangements for this year's activities in
cooperation with all involved City departments including, but not limited to, the Mound
Public Works and Parks Departments; also the Orono Police Department.
-1460-
5. Applicant shall be responsible for obtaining any other permits or approvals that may be
required (i.e., Hennepin County Transportation Department, Hennepin County
Environmental Health, etc.)
Passed by the City Council this 9th day of June, 2015
Attest: Catherine Pausche, Clerk
-1461-
Mayor Mark Wegscheid
CITY OF MOUND
5341 MAYWOOD ROAD
MOUND, MINNESOTA 55364
PUBLIC GATHERING PERMIT
Use of a public park or commons by any group consisting of 15 or more individuals.
Use is not to interfere with traffic and general use of the park or commons or to be beyond the ability
of the police in maintaining order.
NO LIQUOR OR BEER MAY BE USED IN ANY OF THE CITY PARKS OR BUILDINGS.
Group is to remove all litter and trash and provide a deposit to insure cleaning up of the park area.
PERMIT FEE: $300 /DAY TO $600 /DAY* e
DAMAGE DEPOSIT: $500 TO $1000/DAY*
*Permit fee and damage deposit amount to be determined by City Manager and City Staff
upon receipt of application stating specific use and requirements.
Date(s) of Use -,Svw
AreatobeUsed Sur5% Jr, ?ark,
Time Frame
Intended Use (nuz o %� PJO.r- k. to ai V: \C QS
Expected Attendance \00 - I on
Organization
Representative's Name
Address S o\,o t.
Telephone No. Home:
Drivers License
Work: q61 -1icA\- yo k-1
4 A^n
n
-. oo —,,,nt fir
2415 Wilshire Blvd, Mound, MN 68304
Phone 062 -472 -0600 Faxe52.472.0020
SEASONAL, BANNER, &
PORTABLE SIGN PERMIT
APPLICATION
Note: Any Information supplied on this form will be considered public
according to the Minnesota Government Data Practices Act.
SITE
Property Address CjwrS
t: a Q
Zono
Business Name
Phone
APPLICANT
Name �/¢ sko n �r u.
C. l£
Email rAw� o wmt log ka. is t� h,n• �S
Phone
Fax
Other
OWNER
Name ryf,¢pran
Phone
Fex
_ Other
SIGN
Company Name
CONTRACTOR
Address
Contact Parson
Email
Phone
Fax
Other
See City Code Chapter 119 -4
❑ Seasonal Sign $25 - Dates from to Size — feet x _ feet = ____sf
Message
Seasonal Signs - Seasonal signs of a temporary or portable nature may be used in the non - residential districts to
promote or advertise on- premise seasonal services or merchandise. Such signs shall be limited to a maximum of
thirty-two (32) square feet and shall not be left in place for more than a two (2) month period. Permits and fees
shall be required for all seasonal signs, and permits may be Issued no more than two (2) times per calendar
year per business.
Banner /Pennant $25 - Dates from -5m�, X to .,. a1A
Describe event Mj-.,, kk4, dab U
Sign locations (fist or attach map) rr arc Pwr k
Temporary banners and pennants employed for grand openings of business establishments, special events or
promotions and holidays are not exempt from permits and fees and shell be removed within thirty (30) days
upon permit issuance unless an alternate schedule is approved by the City Council. Temporary banners and
pennants are prohibited from being placed upon any decorative fencing unless the banner or pennant is used in
conjunction with a goverment, a quasi - public function, at similar - related special event. Permits for banners and
pennants can be issued no more than four (4) times per calendar year,
❑ Portable Sign (no fee) - Dates from to Number of signs
Sign locations (fist or attach map)
Describe sign (message, materials, etc.)
-1463-
Portable Signs used for the purpose of directing the public may be permitted underthe following conditions:
(a) Said sign is coincidental to, or used In conjunction with, a governmental unit ar quasi- public function;
and
(b) The period of use of said sign shall not exceed thirty (30) consecutive days; and
(c) Signs shall not be used more than four (4) times during a calendar year; and
(d) Signs shall be placed on the premises of the advertised event and/or on such other premises following
approval of a temporary sign permit by the City of Mound. Administrative approval of a portable sign permit is
permitted If the following conditions are met:
1. The sign Is not being placed on public property.
2. Written permission from the property owner of record is provided if being located off - premises,
3, The criteria reference In subsections (a), (b), and (e) above are met.
4. The proposed location of the sign Is reviewed and deemed acceptable by Mound Staff, which shall
include the Police, Planning, and Engineering Departments, based on the following criteria:
+ The sign is not being placed in the road right -of -way.
+ The sign does not obstruct the sight triangle for pedestrian or vehicular traffic.
+ Placement of the sign does not create any potential trafflo or other related hazard; and
(e) Portable sign placement on public property requires City Council approval; and
(f) Such signs shall require the issuance of a permit but will be exempt from all fees; and
(g) In the instance of a mul ti-use facility, only one seasonal sign may be placed on the premises at any one
time.
Applicants are advised that incomplete applications or insufficient information can delay the
processing of the permit request or may result in the application being rejected. Please fully complete
all involved sections of the application and provide as much detail as possible, including, but not
limited to, the proposed locations of signs, using addresses or landmarks, and written permission
from the property owner for off -site locations.
DATE
(OFFICE USE ONLY) SPECIAL CONDITIONS & COMMENTS:
RECEIVED By & DATE
PLANS CHECKED BY
APPROVED BY & DATE
COPIED
APPROVED
ZONING
� I
8 1_ ON a
Consulting Engineers & Surveyors
2638 Shadow Lane - Suite 200 • Chaska, MN 55318 -1172
Phone (952) 448 -8838 • FAX (952) 448 -8805
MEMORANDUM
TO: Honorable Mayor and City Council
FROM: Daniel L. Faulkner, City Engineer.
DATE: June 3, 2015
SUBJECT: Mound Storm Water Pollution Prevention Program (SWPPP)
2014 Annual Meeting — June 9, 2015
MPCA General Permit for Storm Water Discharge
As required by the National Pollutant Discharge Elimination System (NPDES), State
statute requires that cities with populations in excess of 10,000 must obtain coverage
under the state's General Permit for storm water discharge. The city of Mound was
required to apply for Permit coverage in 2003, with revisions in 2006. That permit
expired August 1, 2013 and was replaced with a new permit effective the same date. The
City of Mound was required to submit a new application reflecting the new BMP (Best
Management Practices) requirements by December 29, 2013. That application was
submitted on December 28, 2013. (Later approved in March of 2014). It requires an
annual assessment of how the City is implementing its SWPPP which includes the
opportunity for citizen input which is formally accomplished with the Annual Meeting.
What is the SWPPP?
The primary requirement for coverage under the General Permit is the completion of a
City Storm Water Pollution Prevention Plan (SWPPP). This plan outlines how the city
will manage storm water to improve overall water quality and meet the requirements of
the permit, which includes addressing multiple state - identified best management practices
(BMPs). The new permit is very similar to the old permit in that there are 6 minimum
control measures (MCMs) each one including several of the identified BMPs. These
MCMs are very briefly described below and accompanied with potential improvement
options as well as items that are addressed in the newly approved permit:
MCM 1) Public Education and Outreach
• The current program includes outreach using the city newsletter, brochures
available at city hall, posters at city hall and newspaper articles. This information
is to include information on recognizing and reporting to the City any possible
illicit discharge. Partnering with the MCWD and lake associations is suggested as
a means to promote these activities.
Page 1 of 3
-1465-
In 2013 the City has included links on its website to information or educational
opportunities regarding general surface water management and best management
practices. The new permit directs the City to provide links to MCWD activities
and information. The City's quarterly newsletter, City Contact, has contained
various articles on what residents can do to improve water quality.
The City has added (in the new permit) the action item to develop a stormwater
information page on the City's website.
MCM 2) Public Participation and Involvement
• It is required that the City solicit public input on water quality related issues. This
requirement is met by the annual public meeting and 30 day advance notice which
was published in the Saturday, May 2, 2015 copy of The Laker. Written
procedures need to be developed for obtaining and reviewing public input.
MCM 3) Illicit Discharge Detection and Elimination
• The City maintains its storm sewer and drainage area maps.
• Public works addresses any illicit discharge reports from the public.
• The new permit requires that the City: update its ordinances to meet regulatory
control requirements, train staff in detecting illicit discharges, identify areas
within the City that have a high potential for illicit discharge.
MCM 4) Construction Site Storm Sewer Runoff
• The city currently requires sediment and erosion be controlled to State and
Minnehaha Creek Watershed District (MCWD) standards.
• City projects are inspected and weekly reports are made even though the MCWD
has the regulatory authority for issuing construction site permits and inspecting
construction sites.
MCM 5) Post - Construction Storm Water Management in New Development and
Redevelopment
• The City requires storm water treatment facilities meeting State and Watershed
standards and plans are reviewed for verification.
• The MCWD has regulatory authority to perform post construction site inspections
and oversee post construction management.
MCM 6) Pollution PreventionlGood Housekeeping
• The City follows a spring and fall street sweeping schedule, with greater emphasis
put on heavier traffic areas.
• The City has met the requirement to inspect 100% of all storm sewer outfalls
during a 5 year period and 100% of all structural pollution control devices
annually and keep appropriate records of these inspections.
• The City should continue to work with the Minnehaha Creek Watershed to
implement Total Maximum Daily Load (TMDL) requirements as they arise.
1-1466-'3 H MOUNU23928612015 (2014 -to bedo.e2015)\2015 06 09C.0 fl-.to., DFv,
Written procedures need to be developed for City staff operations in monitoring
and repairing, as necessary, city facilities that could negatively impact water
quality.
The City of Mound is in compliance with the General Permit for storm water discharge.
The City does need to update the ordinance regarding Illicit Discharge Detection to meet
current MS4 requirements. Bolton & Menk staff will work with City staff to author the
new ordinance and implement the above recommendations.
No action is required by City Council with respect to the public meeting or the annual
SWPPP report to be submitted to the MPCA before the June 3Oa' deadline.
1= 1467 -3 H NOUMC1239286t2015( 2014 -to be done 2015)\2015_06_09 Council -memo, DF ve
2415 Wilshire Boulevard
Mound, MN 55364
(952) 472 -0604
MEMORANDUM
To: Honorable Mayor and City Council
From: Sarah Smith, Community Development Director and Scott Qualle, Building Official
Date: June 4, 2015
Re: Required Building Repairs at 3243 Warner Lane
The Building Official has had significant concerns about the condition of the property located
at 3243 Warner Lane for some time now. Staff has been working with the owner, David
Umbehocker, throughout the process. On September 18, 2014, an abatement order was
included on the agenda for Council consideration but was removed at the meeting,
following a request by the owner, who indicated he would be bringing the building into
compliance in the near future per code. The reroof permit was issued September 22, 2014
and the deck and chimney repair permits were issued September 30, 2014. Following permit
issuance, the chimney was removed. This was the most urgent issue regarding the unsafe
structure status. Members are advised that the unsafe decks were also removed before the
end of the 2014.
As of this date, the outstanding exterior work items are removal and reinstallation of the roof
underlayment and then reroofing to include shingles. However, additional progress has
been very slow. There have also been multiple promised completion dates that have come
and gone for various reasons including, but not limited to, weather conditions, scheduling,
etc. Recently, there had been renewed project activity in late May 2015, with additional
commitments for completion, by May 29, 2015 and June 5, 2015. However, the owner
cancelled the inspection scheduled on May 29, 2015. It remains unknown as to whether the
owner will meet his commitment to have the entire roof completed, by June 5, 2015.
It is also relevant to note that there may be interior work items that also need to be
addressed. Given the length of time that a roof has been missing from the structure, it is
possible the interior has been damaged. The Building Official will conduct a visual
inspection from the public right of way on June 5, 2015. In summary, as of the date of this
memo, the work remains uncompleted.
The City's goal has been to compel the owner to complete the work approved, while not
creating impediments to his ability to complete the work. This approach has had mixed
success. At this time, the Building Official is requesting direction from the City Council as to
next steps. The owner was invited to attend the June 9, 2015 City Council meeting.
For discussion purposes, the following are examples of possible next steps:
1) Declare the property a public nuisance pursuant to city code
a) Abate the nuisance condition
b) Assess abatement costs against the property
2) Charge with criminal misdemeanor
3) Issue citations for violations of the State Building Code, City Code
International Property Maintenance Code and /or other applicable codes
5) Declare the property an unsafe structure
6) Create and adopt a fagade improvement program
• Page 2
-1469-
MOUND DOCKS AND COMMONS COMMISSION MINUTES
MAY 21,201S DRAFT
The Mound Docks and Commons Commission met on Thursday, May 21, 2015, at 7:00 p.m.
in the council chambers of the Centennial Building.
Present: Chair Jim Funk, Commissioners Derrick Hentz, Rodney Beystrom, David
Osmek, Council Representative Kelli Gillispie
Excused: Commissioner Susan Gardner
Others Present: Director of Finance and Administration Catherine Pausche
Public Present: Becky Hall, Ory Burma, Justin Rock, Laura Mattioli
Chair Jim Funk called the meeting to order at 7:00 p.m.
1. Approval of Agenda.
MOTION by Beystrom, seconded by Hentz, to approve agenda. All voted in favor.
Motion carried.
2. Approval of Minutes from March 19. 2015 meeting.
MOTION by Beystrom, seconded by Funk, to approve the minutes from March 19,
2015 meeting. The following voted in favor: Funk, Beystrom, Hentz. The following
voted against: none. The following abstained: Osmek. Motion carried.
3. Comments and Suggestions from Citizens Present:
Becky Hall, 4430 Manchester, asked what was the status of allowing the use of lifts at
multiple slip sites. Hall expressed concern for the damage caused by zebra mussels
and the cost to repair. Hall said her family likes to take their boat to other lakes and
now more is involved in doing that. Hall said North Shore Marina and others are
using a small profile lift. Hall understands use of lifts may be on a case by case basis,
but she questioned why the City would concern itself with storage and that should be
left up to the lift owner.
Chair Funk acknowledged that it is a growing concern and evaluation will continue
with the dock use area study to take place this summer.
Pausche said further study is warranted and other parties will need to be consulted
like the DNR and the in /out service. Pausche said lifts are allowed at dock sites, but
there are other issues that need to be addressed at multiple slip sites and the
subcommittee will come up with a recommended plan /rules.
Council Representative Gillispie arrived at 7:09 pm.
4. Review 2014 End of Year Reports /Financials
Pausche said a slight $25 across the board fee increase was approved and payroll
allocations were significantly reduced to free up capital funds. Pausche said the rip
rap project did not take place due to the high water levels, but that the vendor will
-1470-
MOUND DOCKS AND COMMONS COMMISSION MINUTES 05/21/15
honor the quote. Pausche said all the Lost Lake Slips were rented and funds were
loaned to pay for the debt service related to the dredge.
Gillispie asked what the blank line was in the expense section. Pausche said she
thought it was the Administrative Overhead charges (legal, audit, accounts payable,
accounting, etc), but that she would confirm. Gillispie also asked if beavers were
doing any damage in Lost Lake. Pausche said Brian Swartzer from the Parks
Department will be meeting with the vendor to talk about maintenance issues and
that she will tell him to look for signs of damage.
5. Review 2015 Rip Rap Protect Area /RFQ
Pausche said the packet included the Shoreline Improvement Project Study from
2013 and that her recommendation for 2015 improvements is an extension of that.
Pausche stated page 16 contained the shoreline ratings for the sites she is
recommending to improve and that the Request for Quotes will include the option to
reduce the linear feet depending on the bid results. Pausche stated she will be
asking the council to amend the budget to allow for the 2014 capital funds to be used
in 2015 in addition to a new project.
MOTION by Funk, seconded by Beystrom, to approve the recommended sites on
page 16 to be included in a Request for Quotes. All voted in favor. Motion carried.
6. Partial Street Vacation Application - unimproved portion of Galway Lane abutting
4730 Galway Road
Pausche stated the request for a total vacation of this unimproved street was denied
by the Council at the March 24, 2015 meeting. One of the applicants, Justin Rock,
has since returned requesting a partial vacation. Pausche stated that the standard
for allowing a vacation is that there is no public benefit to keeping the land.
Justin Rock, 4730 Galway Road, stated the partial vacation he is requesting will still
leave 15 feet of public access all the way to the commons and that variances have
been granted to essentially do the same improvements, but that a vacation would
simplify the process.
Osmek said this is not the first road vacated so it is not setting the precedent. Funk
said the DCC should focus on the public benefits of access and he felt the 15 feet is
still adequate.
Beystrom asked about the setbacks before and after the vacation and Rock said they
are just shifting the whole house pad south and do not intent to expand the
footprint.
Gillispie asked what side of the road parking is permitted. Rock said parking occurs
on the side streets in addition to Shannon. Osmek said the DCC could recommend a
condition to clearly mark what is public and what is private and Rock said he and the
neighbor are currently maintaining the entire area so that is not really a concern.
-1471-
MOUND DOCKS AND COMMONS COMMISSION MINUTES 05/21/15
Osmek mentioned vacating to the waterline invokes other rules and Rock said the
vacation is up to the unimproved Excelsior Road and not the water.
Pausche noted that no noticing took place for this discussion like the last time.
Noticing is not required for a DCC meeting, but area residents will be noticed for the
Planning Commission and Council discussion. Pausche relayed residents concerns
noted in the March DCC meeting that were included in the minutes. One resident
questioned the dedication of the Seton Plat and why a vacation can even be
considered.
Gillispie added she thought the DNR report also mentioned the dedication language
and asked if they have been consulted on the partial vacation. Pausche said they
have and their response will be received in time for the Planning Commission and
Council meetings. Pausche asked that the DCC assume the DNR response would be
similar for the purpose of this discussion. Gillispie asked what the typical width of
other public access points are and Osmek said roads are typically 24 feet wide but
that 15 feet is not unusual.
MOTION by Funk, seconded by Beystrom, to recommend that the City Council
approve the partial vacation application for an unimproved portion of Galway Lane
based on sufficient public access still being available. All voted in favor. Motion
carried.
7, Public Lands Permit - 4730 Galway Road
Pausche stated she has researched records to find a similar request and has not been
able to. Pausche could only find projects that the City funded. Pausche said the final
recommendation will contain conditions that ensures the City is not liable in any way
and is not responsible for any wetland rules. Pausche said she sees this as benefiting
the public because it makes one of the dock sites more usable.
MOTION by Osmek, seconded by Funk, to approve the public lands permit for
abutting property 4730 Galway Road Dock Site NIP -08979 dredge project with any
conditions offered by staff. All voted in favor. Motion carried.
8. Review: 2015 Calendar
Pausche noted the dock use area subcommittee will meet in June and September will
be the next DCC meeting.
MOTION by Funk, seconded by Beystrom, to approve the calendar. All voted in
favor. Motion carried.
9. Reports:
Pausche noted the Administrative Services Coordinator, Kevin Kelly, started on March
30th and will be assisting her with the clerk and dock functions. Pausche noted dock
inspector Ron Stanchfield is retiring but has offered to train his replacement who will
begin in June.
-1472-
MOUND DOCKS AND COMMONS COMMISSION MINUTES 05/21/15
Gillispie highlighted the Annual Fish Fry is to take place June 6th and the Crime
Prevention Dare Open will take place on June 5th.
MOTION by Funk, seconded by Hentz, to adjourn at 7:56 p.m. All voted in favor.
Motion carried.
Submitted by: Catherine Pausche
-1473-
2
m
W W W 41 m m rn m OJ O A A A A W W W W W W W W W W W W W W W N N N+
W CO m -1 W J J O O O V N O O V V J a> m m rn rn rn m N U W W W N O
0 K"� O <vacvw�vm000 oo cccoo o o� ;o@m
D m m 0 O F d m d m a 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.
D m v. CO D 9 '� o 0 m+ n D-- M xl — 11 -i -I m m F A
r. Z -� -� 5 r ^ w 0 0= d m m 3 m 3 3 3 3 3 w d a 3 3
0 d d N m �� QCC .d�0 7x c ca E -oaaaa x d caa O
goo (° 2 ° d t0 O = — ° .d... o ° n n < ¢ < OG < G < O O a OG < N (!) c
0 0 z N N C NG `G O O N i == N j N N N O N"
», y 3 ro m m t° 3 2 3 3 3 3 N M 3 3 a 2 n
O d O O N N A N A 4 a
d F d O D D W D m D m D p D D
O = d N
d J O
O
W O (T A W W N W W V O W W O U A O W V O U tD (T N U N
W W O N W _(O _U _U _m + _O _<O _V _N _V _ _O _W _U _A _O (D
. . . . . . . . . . .
U U V N N W+ l0 U N !O W O+ V O O W W+ f0 -� W
N A 41 U W V W O V OI O A W V t0 A O (O A U W N W O> U U W W W
V O m U U OJ N W W O> (O N (O V A A T 0 O O+
(O 50 (O U W U J W:- O P!, J A+ O W U A+ O (O W W J A N U J
O 10 + O) N N O) W W W O A U N A N (O A (O U W N N O) U U W A W A
U m
O f0 U N+ W+ O W O V O ++ O t0 J+ O f0 W W N+ V (D O
N A V m N N (O V (O W W O W U A A V A W W (T W N fp OJ U W t0 V W N
m m +
T A O W J CO m+ W J t0 W m O D U O W V O U V U : wow
O O W m (O U O7 + O W O V V ++ U (D J A+ (O W W A W A N W
J� W 01 O D7 A N V N W O W O7 U A V A V N 01 W A U O� U O i O U W V !O
-1474-
n
D
N
2 _O
m
Nti0
03m
NZO
� C
A Z
9 O
O
A
z
2
O
T
T
Z
D
Z
n
m
C♦
S
N
N
N
n
N
N
r
0
r
m
'O
m
m
0
d
Q
N
Z3
m
O 0
i m
In :VrN �-iO Drn � Z W V m
a
N
O
N N C N a N =' m O� N N X Z
v n 2 N m N m m m N= O C
Q ^r F, N c
T o_ rN 2
m N 2. = m m
O N
� O T
N N
3
m
W
J J A O A W m A O W O tli O O N O) A O N i
O tp (p w W
O NOON O A J W tli O -� 0 0 0 0 0 (O O O N
O O O O O O A N N N O N 0 0 0 0 0 O W O O W
'a 9
N� mr
lP W V t0 N M N Ui w (P O O N N O O
_ m-1
z O n
(T W UN W j T (n W O Of W O W GI N N W ip O V m O
N
D c
W J W W O N t0 W N O Co Co W V O w N (O N W N n
(TmN w(li IV fa (pN N V OJ in O�O�O J V mTA V m m
m m
m0
T wwN W N Nw r N W -� W A�mw Gm W
m A V O O) O O A V N 9). OJ V G) W W W O m Z W
O W IU LJ w CJ O IJ CJ V [J OJ N N O OJ V IJ fV V O O '0 "1 fJ
d o 0 0 0 o a o a o 0 0 0 o a o o a o o a o o e
N � L
A W W V (O J t0 W Ol N w O Z
_ m
N (P O (AO W V OV A OI O a7 W A W CW11 N A
V O J A fJ J A i0 fD Cb (T W ip M W tp N (O
A (Il V O] V V V N A V N N W J J W 0 0
-1475-
m
m
m
z
m 0
C
r� OO
Nm3
�Xc
a m
m z
O
0
z
0
O
oDM
3 n o m m o
Nd o ^ TZ
— N C 0 0 � t° � to
S m J d y
S
N
c o �
N � N
J
c0 �
N
xT
(O (O D7 O A m
O
(O N m N V Or
Ur V N
m A W m 0 (O
O Ur A
O O N (O O N
W tO W
V O A A A V
O m W
(O m W Ut V Ut r r i
i T O W N
A V A (O V m tp N� Ui
in a�i0 mia vowo
V m O 0 A W W m A t D
O W O A m W i i r r m O A m
O�oCNir �.Wp A mcND
W A O) A m y m V
0 0 0 0 0 0 91 91 ii d N o e o
N N _
Ol �I N V W O
fJ W (O W W V Ut (O O W
N � N Ui Ut O O
m V� Vt N O m W m
m Ur O m U7 O N W O
C)
m
m
vOOn�DTmC)vn
O o m m m 4 3 0 0 0 �D m m .0 0
3 F m J m n 3' J m m °' �,'< c A
J d
N � m
m is
N
N �
W W (T W W W W W (n m (D O O (O O> V
OI O O A N V P:-
N O O m O m N A m W A O N O N Ut O O
V O O m O N N W W N m 0 0 0 0 A (Jt m O N
W
m'o
o 22
xT
(O (O D7 O A m
O
W W O m N m
(O A (O (D
AA V cO UtO r r
i i V (n�o
N
m W lT W A N N
ZO 6A 6
O
(mD O O m N (VD (mO Omi
w o
o v�N�mo�A V o cn o m
a
mN
N
N A m m N O� _ r
� i v (➢ N N
O�oCNir �.Wp A mcND
W A O) A m y m V
0 0 0 0 0 0 91 91 ii d N o e o
N N _
Ol �I N V W O
fJ W (O W W V Ut (O O W
N � N Ui Ut O O
m V� Vt N O m W m
m Ur O m U7 O N W O
C)
m
m
vOOn�DTmC)vn
O o m m m 4 3 0 0 0 �D m m .0 0
3 F m J m n 3' J m m °' �,'< c A
J d
N � m
m is
N
N �
W W (T W W W W W (n m (D O O (O O> V
OI O O A N V P:-
N O O m O m N A m W A O N O N Ut O O
V O O m O N N W W N m 0 0 0 0 A (Jt m O N
W
m'o
o 22
W
N V N M W U NW
0 Jt m (D W
O <Tr ( IV !J W (p CO O V m m
m V (ONN W AN(O �Om W
m _
O V m !J IJ W W W O N m (O m
m m m (OmmOm(O � m V m
W W fT N W
O O W Ja O O IV (J IV IV (T N
m Ut m W m � N tp W O m W V
i r A N UI N O V W m fO i m i m r N
xT
mr
Z
N
m W lT W A N N
ZO 6A 6
O
(mD O O m N (VD (mO Omi
w o
o v�N�mo�A V o cn o m
a
mN
N
N
W �
f
O �
m
O W O A OAJ W i i
r i m m A W
I (AT
x
O lAp 0 0 (J9 W i
i 0 i N
T
W W
A A AN_(P V UtlJ Ut Am0 (O
m
T
W A
OOOi W
r
W mAmNOON� r i [AID
�
A
A
C
N
a
A
o
mm W
W m W W m0 -+AOmN W -+Om
m
a
Ut A O
N V V A m V (O X 0 0 Ot A V O W
Ip
V A O
cp A lO V O m O N N O A v Ut O V
w
W
N V N M W U NW
0 Jt m (D W
O <Tr ( IV !J W (p CO O V m m
m V (ONN W AN(O �Om W
m _
O V m !J IJ W W W O N m (O m
m m m (OmmOm(O � m V m
W W fT N W
O O W Ja O O IV (J IV IV (T N
m Ut m W m � N tp W O m W V
i r A N UI N O V W m fO i m i m r N
xT
.o m
m 2 W
ZO 6A 6
(mD O O m N (VD (mO Omi
ON-. �,
0 0 0 0 0 o a o 0 o a o 0 o a a o 0 o
a
W
N V N M W U NW
0 Jt m (D W
O <Tr ( IV !J W (p CO O V m m
m V (ONN W AN(O �Om W
m _
O V m !J IJ W W W O N m (O m
m m m (OmmOm(O � m V m
W W fT N W
O O W Ja O O IV (J IV IV (T N
m Ut m W m � N tp W O m W V
i r A N UI N O V W m fO i m i m r N
A
m
x
V
m
2
N
N o
ACO
T
H 0 m
mmo
n m z
My
O
A
Z
O
AVACD V Ut
ON-. �,
-1476
JN
m W �W W A
N
N
W �
f
O �
0
O W O A OAJ W i i
r i m m A W
I (AT
I m i
O lAp 0 0 (J9 W i
i 0 i N
A
m
x
V
m
2
N
N o
ACO
T
H 0 m
mmo
n m z
My
O
A
Z
O
Harbor Wine & Spirits May 2015
Date
Weather
Cust 15
Cust 14
Variance
2015
2014
Difference +/-
5/1/2015
sun to 70s
620
289
331
15573.73
5808.81
9764.92
5/2/2015
sun mid 70s
711
628
83
18183.28
15187.43
2995.85
5/3/2015
580
0
13760.32
5/4/2015
sun hi 60s
263
263
5231.12
5231.12
5/5/2015
sun 69
327
300
0
6408.16
6641.23
-233.07
5/6/2015
rain 70s
264
338
-74
5245.76
6433.24
- 1187.48
5/7/2015
RAIN 64
307
281
26
6032.85
4810.41
1222.44
5/8/2015
pt sun to 60s
565
309
256
13149.49
6090.81
7058.68
5/9/2015
sun 60
693
581
112
17866.45
13583.38
4283.07
5/10/2015
641
0
16175.71
5/11/2015
rain 58
249
0
4343
4343
5/12/2015
dreary 55
307
245
62
5495.73
4455.02
1040.71
5/13/2015
sun wind 65
278
293
-15
5556.34
5250.27
306.07
5/14/2015
rain all day
269
296
-27
5792.78
5827.57
-34.79
5/15/2015
ovrest 60
577
265
312
13837.9
6317.14
7551.43
5/16/2015
mix 70
619
582
37
14943.82
14592.33
351.49
5/17/2015
699
-699
17170.7
5/18/2015
wind cldy 50
245
245
5106.08
5106.08
5/19/2015
sun 55
308
274
34
5929.68
5388.82
540.86
5/20/2015
sun mid 60s
315
359
-44
7258.01
7561.97
- 303.96
5/21/2015
sun to 70s
343
332
11
8728.86
6344.15
2384.71
5/22/2015
sun to 70s
749
365
384
20176.17
7933.82
12242.35
5/23/2015
rain mid 60s
655
748
-93
19708.96
20161.67
- 452.71
5/24/2015
886
-886
0
26388.27
5/25/2015
pt rain 70
283
283
5963.53
5963.53
5/26/2015
RAIN 66
274
354
-80
5450.15
7329.27
- 1879.12
5/27/2015
sun 87
345
288
57
6623.12
5181.69
1441.43
5/28/2015
sun mid 80s
324
326
-2
7419.88
5751.63
1668.25
5/29/2015
rain 74
629
343
286
15641.47
7691.02
7950.45
5/30/2015
SUN 70
651
754
-103
16351.16
17921.21
- 1570.05
5/31/2015
622
-622
14911.5
TOTALS
11170
11978
-808
262017.5
276683.4
- 144665.92
-1477-
Minnesota
Pollution
Control
Agency
An Overview
he Municipal Separate Storm Sewer
System (MS4) general permit is
mandated by the federal regulations
under the Clean Water Act and
administered by the Minnesota Pollution
Control Agency.
The MS4 permitting program gives owners
or operators of municipal separate storm
sewer systems approval to discharge
stormwater to lakes, rivers and wetlands in
Minnesota.
Environmental harm
Urban stormwater frequently contains
litter, oil, chemicals, toxic metals, bacteria,
and excess nutrients, like nitrogen and
phosphorous. Polluted stormwater
contributes to swimming -beach closings,
fish - eating advisories, excess algae growth
and poor water clarity in urban water
resources, especially lakes.
In addition to human effects, poorly
managed urban stormwater can drastically
alter the natural flow and infiltration of
water, scour stream banks and harm or
eliminate aquatic organisms and
ecosystems.
The primary goal of the MS4 general
permit is to improve water quality by
reducing pollutants in stormwater
discharges. Specifically, the program aims
to ensure proper management of
stormwater discharges into waters of the
state.
Defining MS4s
In general terms, MS4s are publicly owned
or operated stormwater infrastructure, used
wq- swl -04 • April 2008
solely for stormwater, and which are not
part of a publicly owned wastewater
treatment system. Examples of stormwater
infrastructure include curbs, ditches,
culverts, stormwater ponds and storm
sewer pipes. Common owners or operators
of MS4s include cities, townships and
public institutions.
The MS4 general permit focuses on
reducing the pollution that enters these
public systems and discharges to wetlands,
streams and lakes ( "waters of the state ").
Owners and operators of MS4s which are
required to get a permit are created in one
of three ways: By federal rule, 40 CFR §
122.34 (a) and (b) (the Clean Water Act),
state rule (Minnesota Rules Chapter 7090),
or by public petition to the Minnesota
Pollution Control Agency.
By federal rule, stormwater systems in
urban areas are labeled Mandatory MS4s.
In addition to these, Minnesota added other
stormwater systems (Designated MS4s) to
the list. These MS4s are only added if the
stormwater system is located in an urban
area that meets the criteria established in
the State Rule for population and discharge
points.
The number of MS4s in Minnesota is
growing as urban areas expand. As of April
2008, there were 24; MS4s in Minnesota.
Public Process
After a term of five years, the MS4 general
permit is improved and revised, if
necessary, and re- issued. Public comment
Minnesota Pollution Control Agency 520 Lafayette Rd. N., St. Paul, MN 55155 -1194 • w .pca. state. mn. us
651- 296 -6300 • 800 - 657 -3864 TTY 651- 282 -5332 or 800- 657 -3864 • Available in alternative formats
is encouraged before the re- issuance of new MS4
general permits and before the creation of new MS4s. In
addition, the public is asked each year to share its
opinion on plans the owner or operator of their local
MS4 has made to manage stormwater. These opinions
are shared at local meetings required by the permit.
Requirements of the
MS4 General Permit
All owners or operators of MS4s are required to satisfy
the requirements of the MS4 general permit;
Minneapolis and St. Paul are required to meet
customized individual permits, which are similar but
which contain additional requirements.
Basically, the MS4 general permit requires the MS4
operator or owner to create a Stormwater Pollution
Prevention Program with six important components:
1. Public education and outreach, which includes
teaching citizens about better stormwater
management
2. Public participation: Include citizens in solving
stormwater pollution problems. This includes a
required public annual meeting and an annual report.
I A plan to detect and eliminate illicit discharges to the
stormwater system (like chemical dumping and
wastewater connections)
4. Construction -site runoff controls
5. Post - construction runoff controls
6. Pollution prevention and municipal "good
housekeeping" measures, like covering salt piles and
street - sweeping.
Reducing Stormwater Pollution
The MS4 general permit is a requirement, but also a tool
in the hands of city, township and county officials who
want to improve the quality of lakes and rivers that
receive their stormwater discharges. MS4 administrators
have can improve the quality of life for their citizens by
protecting and restoring local water quality.
Citizens served by an MS4 are invited to encourage the
owner or operator (normally their city, township or
county) to tackle stonnwater pollution problems, but the
responsibility for water quality is not left in the hands of
public officials_
Public and private spaces contribute to urban stormwater
pollution. While MS4 administrators control the public
sources of stormwater pollution, it's ultimately in the
hands of private citizens to change the way they do small
things that will have a dramatic effect on the quality of
their favorite fishing spot or swimming beach.
Simple Steps for
Better Water Quality
You can make simple changes to reduce stormwater
pollution and improve the quality of your local lake or
river by following these tips:
• Fertilize established lawns with phosphorous -free
fertilizer and don't overspray fertilizer into the street.
• Rake leaves and sweep grass clippings away from
curbs. Clean curbs mean clean water.
• When you wash your car or truck, direct water onto
your lawn to soak up soap.
• Find attractive alternatives to large, impervious
driveways and sidewalks.
• Direct your home's gutters onto your lawn. Water that
doesn't make it to the curb can't carry pollutants to lakes
and streams.
Detailed Information
For more detailed information about the MS4 general
permit or for further information about reducing
stormwater pollution, please visit the MPCA stormwater
program Web site: www.pea.state.mn.us /stormwater
Municipal Separate Stormwater Sewer System (MS4) Program Overview • wq- swl -04
page 2
t
March 2008 .? Minnesota Pollution
,,
Control Agency