Loading...
2005-03-20PLEASF~ TURN OFF AT CELL PHONES & PAGERS IN COUNCIL CHAMBERS. Call meeting to order Staff presentation, public hearing and action authorizing the grant application to DNR for Zero Gravity Skate Park improvements 1-5 3. Adjourn ITEM 1- APPLICATION SUMMARY Local Unit of Government: City. of Mound ContaCt Person: Jim Fackler Title: Parks Director Address: 5341 Maywood Rd. Mound, MN Zip: 55364 County: Hennepin Daytime Phone: 952-472-0611 Fax Number: 952-472-0620 Email Address: JimFackler~ci _tyofmound.com Project Name: Zero Gravi _ty Skate Park Amenities Existing Park Acreage Acres Please identify the activities to be completed with your Application: Acres to be purchased: n/a Acres Facilities to be Developed/Renovated: We plan to add amenities to a new, state of the art skate park facility, in the ci_ty of Mound. The current park is very_ popular and was built by communi _ty dOnations and few public dollars. As more people discover the park, we see the need for additional seating, a shelter for equipment storage, fund generating vending machines, electricity_, shade, and an area for beginning level participants. Cost Breakdown: Grant Request (50%) $ 5,500 Local Match (50%) $ .5,500 Total Cost (100%) $ 11,000 ... -1- ITEM 2 - PROJECT NARRATIVE Provide a.one-page description of your project. 1. Describe the park history. Include the date the park was established, list all existing buildings and facilities and the year they were built. 2. Describe what recreation facilities will be developed or rehabilitated and any lands that will be acquired. 3. Describe your community's need for these facilities and how they will complement existing recreation facilities. 1. Zero Gravity Skate Park opened for use in the spring of 2004. After more than a year of construction and several years of planning and designing, the unique cement structure was completed and the kids began using it immediately. Additional features including a half pipe and hook up of the already installed lighting, drinking fountain and mister will be completed in the spring of 2005. There are currently no buildings on the site. Zero Gravity Skate Park came about as a community effort to replace an indoor facility that was no longer feasible to operate. After the summer of 1999, the indoor skate park called Take Five closed due to the high cost of maintaining the wooden ramps and the lack of a permanent, year round location. The park was staffed by a community collaborative group and fell under the insurance coverage of the Westonka School District. Funds to construct the new facility were raised from youth, community members and businesses. The Cities of Mound and Minnetrista also contributed to the park and the City of Mound donated the land to house the park. Much of the labor and supplies were donated or discounted by suppliers and contractors. To date $163,000 has been spent and (appx $$$$) several thousand dollars of in-kind labor and supplies have been donated. We learned a lot from the old Take Five skate park that allowed us to construct a top quality, free and multi skill level park. It was important that we keep the ramps within the four- foot height restriction of the League of Minnesota Cities Insurance Trust, allowing the City of Mound's general liability insurance to cover the skate park at no additional charge to the taxpayer. The tier one park (ramps four feet and under) does not need to be staffed, allowing for a free facility to serve a wider group of participants. 2. We are requesting funds to: - add a shelter that will hold fund generating vending machines, electrical hook ups, and a place to store brooms and squeegees for the park. - Landscaping and side walks to connect the skate park to the building, parking lot and drinking fountain. -2- - Picnic tables and benches. - A cement slab for beginners to practice on small, street course obstacles. 3. The need for this facility has been seen in the tremendous use. We have also seen a need to improve the park for parents and children not yet using the park. It is a pleasure to watch the park users and builds a greater understanding of the sport and the children who are participating in the sport. The Westonka Collaborative group that initatiated the skate park construction identified a community need of free, healthy things for kids to do in our community. The children that do not drive are isolated in our small community with little public transportation and few pa~:k facilities for older children. The skate park is located near a new, City of Mound Greenway Project that includes trails, transient docks in a former water transportation route, and an observation peer. A new retail and residential development is planned for the area. The improvement of the skate park will complement the greenway area and offer the community youth an area for recreation r~ear other family and adult recreation facilities. ITEM 3 -EFFICIENCY OF DESIGN AND MATERIALS In accordance with Minnesota Statutes, this program encourages facility design and use of materials that are low maintenance and environmentally sensitive. 1. Describe how your design and material selection for the proposed project will result in greater durability, resistance to vandalism and/or lower long-term operation and maintenance costs. 2. Describe how your design and material selection for the proposed project will result in reduced energy use, reduced water use, use ofrecyclable and recycled materials, and/or similar measures to reduce environmental impacts. 1. The shelter is designed with cedar walls and minimal smooth, flat space for graffiti or defacing. The natural cedar will require no painting and should weather nicely with little maintenance. The electrical hook up attached to the shelter will assist the Mound Parks Department with nearby access to electricity for maintenance. The existence of the shelter allows for storage space of brooms and squeegees to be placed on site. These tools will be available to the park users but having a secure home for them will encourage respect for the tools and an understanding of where the youth can f'md them each time they need them. 2. The current park users are walking to a nearby Super America store to purchase drinks and snacks. The plastic glasses that they are purchasing are landing in' our garbage cans and has created a daily need for trash removal. With our own machines, we can offer screw top bottles that may encourage the consumer to take it with them -3- and still keep out bees while the beverage is sitting, unattended. Profit from the machine sales will be restricted to skate park maintenance. Hook up of the drinking fountain, which is planned for this spring, will also reduce the need for purchasing soda or other drinks. -4- ITEM 8- PROJECTED OPERA TIONAND MAINTENANCE COST._~ Estimate the projected maintenance and operations costs for the proposed facility for the time periods outlined below. In developing these estimates, it is important to consider not only the routine costs (such as labor, materials, utility costs and equipment costs), but also periodic major repairs or preventive maintenance (such as seal coating or replacement of plumbing, lighting, aglime, tuff, etc.). Each applicant should assess the particular needs of their specific project. It is not sufficient to simply reference the overall park and recreation budget and suggest that the operations and maintenance costs for the proposed project are somehow covered within that budget. You will be expected to have made a careful, thorough assessment of the specific cost impact of the proposed project. Cost estimates may be explained in a narrative or table format. However, actual dollar figures must be included for each identified cost. These estimates should be made available at the public hearing. See Item 9. Time Period: The time period needs to be long enough to reflect the ongoing operation and maintenance costs, future repairs and preventive maintenance measures for the Zero Gravity Skate Park Amenities proposed project. Provide an estimate for each of the following time periods. - Annually $5,000 - Every 3-5 years $5,000-$10,000 - Every 10 years $10,000-$15,000 - Every 20 years $15,'000-$30,000 II. Cost Factors: Depending on the type of project proposed, estimates should be made for: (The following are annual costs.) - Utility costs $1,000 - Grounds keeping $1,500 - Waste management $ 250 - Services N/A - Repair and replacements - Vandalism - Vehicle costs - Others (?) $5,000-$10,000 $1,000 N/A N/A III. Inflation: Factor in reasonable inflation rates into the estimate. Above figures based on 3% inflation rate