Loading...
2011-04-26 CC Agenda PacketPLEASE TURN OFF CELL PHONES & PAGERS IN COUNCIL CHAMBERS. •' AGENDA • • ...................................................................................................................................... ............................... ............................................ ...._.......................... ........................ ......._............... _...... ........ _ ........................... MOUND CITY COUNCIL TUESDAY, APRIL 26, 2011- 7:00 PM REGULAR MEETING MOUND CITY COUNCIL CHAMBERS *Consent Agenda: Items listed under the Consent Agenda are considered routine in nature and will be enacted by a single roll call vote. There will be no separate discussion of these items unless a Council Member or Citizen so requests. In that event the item will be removed from the Consent Agenda and considered in normal sequence. Page 1. Open meeting 2. Pledge of Allegiance 3. Approve agenda, with any amendments 4. *Consent Agend *A. Approve minutes: April 12, 2011 regular meeting 752 -756 April 19, 2011 special meeting workshop 757 *B. Approve payment of claims 758 -793 *C. Approve Resolution Approving an Expansion Permit for Property 794 -825 At 5174 Tuxedo Boulevard *D. Approve Resolution for Educational Project by Our Lady of the 826 -830 Lake Catholic School 5. Comments and suggestions from citizens present on any item not on the agenda. (Limit to 3 minutes per speaker.) 6. Dick Osgood, representing Lake Minnetonka Association, on Phelps Bay milfoil treatments, with any necessary approvals 7. Carlton Moore, Public Works Director, requesting action on Resolution 831 -833 Accepting Bid for the 2011 Street, Utility and Retaining Wall Improvement Project — Southwest Island Area (PW 11 -01), and the 2011 Street, Utility and Retaining Wall Improvement Project — Highland Area (PW 11 -02) 8. Sarah Smith, Community Development Director, requesting discussion/action 834 -853 related to violation(s) of Conditional Use Permit for property at 4831 Shoreline Drive, which allows for sales and display of (20) vehicles PLEASE TURN OFF CELL PHONES & PAGERS IN COUNCIL CHAMBERS. 9. Information/Miscellaneous A. Comments /reports from Councilmembers /City Manager B. Reports: Finance: January - March 2011 854 -862 • C. Minutes: Docks & Commons Comm: March 17, 2011 863 -865 Parks & Open Space Comm: April 14, 2011 866 -867 D. Correspondence: Mediacom letter on programming 868 Letter from Michael Regan of Porta del Sol, 869 withdrawing CUP application for property at 5309 Shoreline Drive 10. Adjourn Note: This is a preliminary agenda and subject to change. The Council will set a final agenda at the meeting. More current meeting agendas may be viewed at City Hall or at the City of Mound web site: www.cityofmound.com. • • COUNCIL BRIEFING April 26, 2011 • Upcoming Events Schedule: Don't Forget!! Apr 26 — 6:30 — HRA regular meeting Apr 26 — 7:00 — CC regular meeting May 2 — Seasonal Hours begin May 5 -7 — 9:00 -4:00 — Hazardous Household Waste Collection — Independence City Hall May 9 — 5:30 — Step To It Challenge — Transit Center May 10 — 6:30 — HRA regular meeting May 10 — 7:00 — CC regular meeting May 14 — 8:00 -3:00 - Recycling Day May 14 — 8:00 — Farmers' Market & More first day of sesason May 21 — Trista Day May 24 — 6:30 — HRA regular meeting May 24 — 7:00 — CC regular meeting June 4 — 3:00 -12:00 — Fire Department Fish Fry and Dance June 6 —12:00 — DARE Open June 16 — 4:00 — Agency Recognition for Wellhouse Relocation Project (public restrooms) June 25 — Arts Council Talent Show July 14 -16 — Spirit of the Lakes Festival Aug 2 — Night to Unite Aug 6 — Tour de Tonka passes through Mound (up to 2450 riders expected) Sept 11 — 911 Ceremony Oct 8 — 8:00 -12:00 — Recycling Day • Oct 30 — Seasonal Hours end Nov 6 - Daylight Saving Time ends Nov 17 — 6:00 — Tree Lighting Ceremony City Hall Closings May 30 July 4 Sept 5 Memorial Day Independence Day Labor Day City Official's Absences Apr 27 -May 9 Ray Salazar May 4 -6 Kandis Hanson Music in the Park June 16 July 14 June 23 July 21 June 30 July 28 City Manager's Conf MOUND CITY COUNCIL MINUTES • APRIL 12, 2011 The City Council of the City of Mound, Hennepin County, Minnesota, met in regular session on Tuesday, April 12, 2011, at 7:00 p.m. in the council chambers of city hall. Members present: Mayor Mark Hanus; Councilmembers Kelli Gillispie, Ray Salazar, Heidi Gesch, ' and David Osmek Others present: City Attorney John Dean, City Manager Kandis Hanson, City Clerk Bonnie Ritter, Community Development Director Sarah Smith, Fire Chief Greg Pederson, Finance Director Catherine Pausche, Amanda Schwarze, Maureen Michalski, Ellen Higgins, Kady Curtis, Johann Chemin, Cheryl Martin, Michael Regan, Jeff Andersen, Travis Baldwin. Consent agenda: All items listed under the Consent Agenda are considered to be routine in nature by the Council. There will be no separate discussion on these items unless a Councilmember or citizen so requests, in which event it will be removed from the Consent Agenda and considered in normal sequence. 1. Open meeting Mayor Hanus called the meeting to order at 7:08 p.m. 2. Pledge of Allegiance 3. Approve agenda • Hanus requested the addition of Item 10. 1, Banner approval for Step To It Program, and Item 10.2, Police Cooperative Services Study. MOTION by Osmek, seconded by Gesch to approve the agenda as amended. All voted in favor. Motion carried. 4. Consent agenda Gillispie requested the removal of item 4D(3) for discussion. MOTION by Osmek, seconded by Gesch to approve the consent agenda as amended. Upon roll call vote, all voted in favor. Motion carried. A. Approve minutes from March 22, 2011 regular meeting B. Approve payment of claims in the amount of $319,826.49 C. Approve application to conduct Excluded Bingo from Mound Fire Department Auxiliary D. Approvals for Our Lady of the Lake Catholic School "Blast" (1) Application /permit for Temporary on -sale liquor license for May 21, 2011 (2) Application for public dance /live music for May 21, 2011 (3) (removed) E. RESOLUTION NO. 11 -23: RESOLUTION TO AUTHORIZE THE PRE -ORDER OF STREET LIGHT POLES FOR THE 2011 STREET LIGHTING REPLACEMENT PROJECT (PW -11 -07) F. RESOLUTION NO. 11 -24: RESOLUTION AUTHORIZING THE TRANSFER OF FUNDS G. Approve Pay Request, First and Final, by Noble Conservation Solutions for energy upgrades to the lighting at Harbor Wine & Spirits and HVAC at City Hall, in the amount of $20,650.00 • -752- Mound City Council Minutes —April 12, 2011 4D(3) Approval of temporary sign permit for Our Lady of the Lake "Blast" Gillispie asked if there are numerous sign permits being approved from different groups, for the • same site at Caribou Coffee. Smith stated that there are, and that groups are notified that others are using the same site. Hanus expressed concern that the decorative fences in the City will become billboards and if banners should be allowed past the 15 days, or if the 15 days should even be shortened. MOTION by Osmek, seconded by Gesch that the temporary sign permit for the Our Lady of the Lake Blast be approved, from April 23, 2011 through May 23, 2011, or 30 days. All voted in favor. Motion carried. 5. Comments and suggestions from citizens present on any item not on the agenda. None were offered. 6. Action on Resolution Accepting Proposal of the Sale of $6,405,000 GO Bonds, Series 2011 B. Stacie Kvilvang of Ehlers & Associates, presented the results of today's bond sale to finance the costs of the 2011 Street, Utilities and Retaining Wall Project, including the SW Island and Highland Areas. There were eight bidders with the lowest being Piper Jaffrey of Leawood, Kansas, with a true interest cost of 3.5099 %, and an adjusted price of $6,315,000. MOTION by Osmek, seconded by Salazar to adopt the following resolution. All voted in favor. Motion carried. RESOLUTION NO. 11 -25: RESOLUTION PROVIDING FOR THE ISSUANCE AND SALE OF $6,315,000 GENERAL OBLIGATION BONDS, SERIES 2011 B, PLEDGING FOR THE • SECURITY THEREOF SPECIAL ASSESSMENTS AND NET REVENUES AND LEVYING TAX FOR THE PAYMENT THEREOF 7. Lake Minnetonka Association request for funding for milfoil treatments on Phelps Bay Dick Osgood, representing Lake Minnetonka Association, appeared before the Council with a request for $6,000 for continued milfoil treatments in Phelps Bay. He presented an accounting of income and expenses for the Phelps Bay treatment, along with projected revenues and costs for 2011. There was discussion as to the amount of payments being made versus the amount of benefit received. Hanus would like to see how the DNR contribution is allocated and also how the money is allocated to each of the five bays, by shoreline footage or area, and like to see that the Mound City and private contributions are staying in Mound and not being sent elsewhere. Osgood will get information that Hanus is requesting and report back. MOTION by Osmek, seconded by Salazar to table action on the contribution for milfoil treatment until more information is received. All voted in favor. Motion carried. 8. Discussion /Action on CUP for Class III Restaurant submitted by Michael Regan on behalf of Porta del Sol This discussion is continued from the February 8, 2011 Council meeting, where the Council held a public hearing for the review of the application from Michael Regan for a Conditional Use Permit for a Class III restaurant (classification) for Porta del Sol at 5309 Shoreline Drive. Action on the request was tabled at that meeting so as to evaluate the building's seating capacity related to the minimum 50 -seat requirement in the City's liquor regulations, dual conditional use permits, and other issues. • -753- Mound City Council Minutes — April 12, 2011 Fire Chief Greg Pederson stated that, according to the Fire Code, the current seating • arrangement is at maximum capacity for approximately 31 -33 guests (15 sq. ft/occupant). The current City code for 3.2 beer is a minimum capacity of 50. Smith stated that there are two issues: What does the Council want to do about the required number of people and square footage; and is a CUP to allow beer and wine appropriate. She also stated that Staff is recommending that the Council consider amending the definition of the Class III restaurant in the zoning ordinance to include that a Class III restaurant may include a pick -up window. It was also noted that if the CUP is granted, the liquor ordinance would still have to be altered to accommodate for less than the stated minimum capacity of 50 guests. Hanus stated that he is not in favor of changing our liquor ordinance to accommodate this request. Gillispie stated she feels this is a reasonable request and maybe the code should be looked at, and suggested that the capacity follow the fire code rather than have a specific minimum number of guests stated. Hanus stated that if a code change is desired, it should be done globally, not just for one business. Osmek stated he is open to talk about the pick -up window concept, but action needs to be taken on this specific case. Chief Pederson stated that there is an issue with the current City Code, in that the requirement for a minimum capacity of 50 guests does not match up with the stated minimum size of 254 sq. ft., and feels that this should be addressed and corrected. John Dean stated that he believes that many years ago the ordinance read that you couldn't have one room smaller than 254 sq.ft. in size if there were a series of dining rooms in the restaurant, but somehow part of that got lost. Michael Regan, applicant, asked what he needs to do to make this work. If he has to change the building, he will. Osmek stated he is willing to look at changing the drive through to a pick- up window in the code, but the seating is still an issue. Regan asked if he needed 750 sq. ft. to • get to the 50 guest minimum and Hanus answered that he did. Smith brought up that the deadline for action on this CUP request is May 6 and if it is denied, there is a one -year waiting period to re- apply. Hanus stated that as long as the request changes, that one -year is waived. MOTION by Osmek, seconded by Salazar to direct staff to prepare a resolution of denial of the CUP request for consideration at the next meeting. The following voted in favor: Salazar, Hanus, Gesch, and Osmek. The following voted against: Gillispie. Motion carried. 9. Discussion /Action on 2011 Farmers' Market & More seasonal use approvals Sarah Smith reviewed the request to allow interim placement of an architectural shed in the market area, to be located on the south side of the Dakota Regional Trail in a 12' x 12' green space located immediately to the east of the market area, which will be used for vendor display and storage. Travis Baldwin and Karly Curtis presented a picture of the proposed shed and informed the Council that they are also requesting permission to put a banner on the shed advertising the Market, along with the shed vendor's advertising. This banner would be displayed from May 1 through October 15. MOTION by Osmek, seconded by Gesch to approve the permit requests per the April 5, 2011 request memo from Farmers' Market & More, adding to Item 3 (Banner Permits) that the banner to be placed on the shed needs to receive Council approval prior to display, and that the Council • is requesting that the shed vendor's advertising take up no more than 20% of this signage. All voted in favor. Motion carried. -754- Mound City Council Minutes —April 12, 2011 10. Proposal for possible future reuse of a portion of Commerce Place Center Maureen Michalski of Schafer Richardson, along with Ellen Higgins of Common Bond • Communities appeared before the Council with a preliminary concept plan for possible future redevelopment of the north portion of the existing Commerce Place shopping center for multi- family residential use to include (52) rental units. Osmek stated that he is not in favor of turning that commercial area over to residential, and asked if they considered the apartments on Belmont & Basswood. Michalski stated that they already own this property and are not looking to purchase more, but to redevelop what they have. No Council needed at this time. 10.1 Banner approval for Step To It Program Sarah Smith appeared on behalf of the City to request approval of a temporary sign permit to allow placement of a temporary banner on the decorative fence in front of Caribou Coffee from 4/13 to 6/5 to promote Mound's participation in the Step To It Challenge program. Hanus stated that all three requests for banners this evening were for more than the 15 -day requirement and suggested that the ordinance be looked at for possible amendment. Osmek stated that after the program begins, the signage may be not as important as before it starts. MOTION by Osmek, seconded by Gesch to approve the temporary sign request for the Step To It Challenge, from April 13 through May 13, and to waive the fee. All voted in favor. Motion carried. 10.2 Police Cooperative Services Study Hanus reported that a study group met and determined the feasibility of having an outside group perform a cooperative services study for the possible merging of the Minnetrista and Mound Police services. It was noted that a cost estimate was received from Emergency Services Consulting International in the amount of $35,757. This cost would be shared equally with Minnetrista. MOTION by Osmek, seconded by Salazar to approve funding not to exceed $17,878.50 for a Police Cooperative Services Study, to be taken from the general fund. All voted in favor. Motion carried. 11. Executive Session for the purpose of the City Mananees performance evaluation Hanus announced that the Council would be going into Executive Session for the purpose of the City Manager's performance evaluation. Upon return the Mayor stated that the performance evaluation ad been completed and no action is necessary. 12. Information /Miscellaneous A. Comments /reports from Councilmembers /City Manager: Hanson reported on the progress of the liquor store sump pump and drainage tile installation. B. Reports: Finance 2010 Preliminary Year -end, as of April 2011 C. Minutes: Parks & Open Space Commission — March 3, 2011 Planning Commission — March 1, 2011 Docks & Open Space Commission — March 17, 2011 D. Correspondence: Mediacom letter on pricing • Xcel rate increase notice -755- Mound City Council Minutes — April 12, 2011 13. Adiourn • MOTION by Osmek, seconded by Salazar to adjourn at 10:53 p.m. All voted in favor. Motion carried. Mayor Mark Hanus Attest: Bonnie Ritter, City Clerk is • -756- MOUND CITY COUNCIL MINUTES APRIL 19, 2011 • The City Council of the City of Mound, Minnesota, met in special session on Tuesday, April 19, 2011, at 6:30 p.m. in the council chambers of city hall. Members present: Mayor Mark Hanus; Councilmembers Kelli Gillispie, Ray Salazar, Heidi Gesch, and David Osmek. Others present: City Manager Kandis Hanson, City Clerk Bonnie Ritter, Community Development Director Sarah Smith, Police Chief Jim Kurtz, Fire Chief Greg Pederson, Finance Director Catherine Pausche, Public Works Director Carlton Moore, Public Works Superintendent Jim Fackler, Public Works Supervisor Ray Hanson 1. Open meetino Mayor Hanus called the meeting to order at 6:30 p.m. 2. Department Head Annual Reports Annual reports were presented by Department Heads, with discussion following. A. Liquor Store — Manager John Colotti (this item was presented after 2G, and in the absence of Colotti, Finance Director Catherine Pausche presented the Liquor Store Report. B. Police Department — Police Chief Jim Kurtz C. Fire Department — Fire Chief Greg Pederson Councilmember Gillispie arrived at this point in the meeting, 6:58 p.m. • D. City Clerk's Department — City Clerk Bonnie Ritter E. Finance Department — Finance Director Catherine Pausche F. Community Development — Community Development Director Sarah Smith G. Public Works Divisions 1. Public Works a. Public Works Director Carlton Moore b. Public Works Supervisor Ray Hanson 2. Parks and Docks — Public Works Superintendent Jim Fackler 3. Adjourn MOTION by Osmek, seconded by Gesch to adjourn at 8:48 p.m. All voted in favor. Motion carried. Attest: Bonnie Ritter, City Clerk -757- Mayor Mark Hanus • � 0 10 City of Mound Claims as of 04 -26 -11 YEAR 2011 2011 2011 2011 2011 2011 BATCH NAME 040811CTYMAN 0414CITYMAN 041411CITY 0420CITYMAN 042611CITY 042611CITY2 DOLLAR AMOUNT $ 331966.07 $ 34,134.19 $ 1,072.00 $ 1,130.22 $ 3441837.19 $ 461073.64 TOTAL CLAIMS $ 461,213.31 -758- /-�� I, CITY OF MOUND Batch Name 040811 CTYMAN Payment CITY OF MOUND Payments Current Period: April 2011 04/21/11 11:35 AM Page 1 Computer Dollar Amt $33,966.07 Posted Refer 111 ACTION FLEET, INCORPORATED Ck# 037475 4/8/2011 �J Cash Payment E 101 - 42110 -404 Machinery/Equip Repairs DOME LIGHT FOR NEW SQUAD #844 $64.21 Invoice 6705 314/2011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $64.21 Refer 112 ALLIED WASTE Ck# 037476 4/8/2011 Cash Payment E 101 -41910 -384 Refuse/Garbage Dispose CITY HALL GARBAGE APRIL 2011 $100.19 Invoice 0894- 002475383 Cash Payment E 101 -42110 -384 Refuse/Garbage Dispose PUBLIC SAFETY GARBAGE APRIL 2011 $96.60 Invoice 0894 - 002478220 Cash Payment E 222 -42260 -384 Refuse /Garbage Disposa PUBLIC SAFETY GARBAGE APRIL 2011 $96.60 Invoice 0894 -002478220 Cash Payment E 101 -45200 -384 Refuse /Garbage Dispose PARKS GARBAGE APRIL 2011 $164.76 Invoice 0894- 002476281 Cash Payment E 602 -49450 -384 Refuse/Garbage Dispose PIN BLDG GARBAGE APRIL 2011 $95.96 Invoice 0894- 002478222 Project SA -2 Cash Payment E 670 - 49500 -440 Other Contractual Servic RECYCLING MARCH 2011 $14,280.21 Invoice 0894- 002474758 Transaction Date 416/2011 Due 0 Wells Fargo 10100 Total $14,834.32 • Refer _ 114- CARQUEST OF NAVARRE (P/W) Ck# 037477 4/8/2011�F� Cash Payment E 602 -49450 -221 Equipment Parts BELT $10.43 Invoice 6974 - 150222 3/7/2011 Cash Payment E 602 -49450 -221 Equipment Parts BELT $10.43 Invoice 6974 - 150220 3/7/2011 Cash Payment E 602 -49450 -221 Equipment Parts RETURN BELT -$9.97 Invoice 6974 - 150273 3/8/2011 Cash Payment E 602 -49450 -230 Shop Materials BRAKE CLEANER $14.94 Invoice 6974 - 150507 3/10/2011 Project SA -2 Cash Payment E 101 -45200 -221 Equipment Parts TIE ROD END, FUEL INJECTION CLAMP $115.37 Invoice 6974 - 150507 3/10/2011 Cash Payment E 602 -49450 -221 Equipment Parts RETURN BELT -$9.52 Invoice 6974 - 150301 3/8/2011 Cash Payment E 602 -49450 -230 Shop Materials VINYL ELECTRIC TAPE $8.08 Invoice 6974 - 150404 3/9/2011 Project SA -2 Cash Payment E 602 -49450 -221 Equipment Parts #185 $8.69 Invoice 6974 - 149530 2/24/2011 Project SA -2 Cash Payment E 602 -49450 -221 Equipment Parts 15W40 OIL $88.66 Invoice 6974 - 150569 3/11/2011 Cash Payment E 602 -49450 -221 Equipment Parts RETURN BELTS - $20.86 Invoice 6974 - 150288 3/8/2011 Cash Payment E 602 -49450 -221 Equipment Parts FINANCE CHARGE, JAN 2011 $3.29 Invoice FC2714130 2/28/2011 Project SA -2 Cash Payment E 602 -49450 -221 Equipment Parts EXHAUST PIPE ADAPTER, HD CLAMP $24.54 Invoice 6974 - 150055 3/4/2011 Cash Payment E 602 -49450 -221 Equipment Parts WRITE OFF FINANCE CHARGE -$1.52 O Invoice FC2695143 2/22/2011 Project SA -2 -759- CITY OF MOUND 04/21/11 11:35 AM J, Page 2 Payments •CITY OF MOUND Current Period: April 2011 Cash Payment E 60249450 -230 Shop Materials CUT OFF WHL SPECIAL ORDER $23.58 Invoice 6974 - 149778 3/1/2011 Project SA -2 Cash Payment E 602 -49450 -230 Shop Materials SHOP SUPPLIES $122.76 Invoice 6974 - 149721 3/31/2011 Project SA -2 Cash Payment E 602 -49450 -221 Equipment Parts CREDIT RETURN ALTERNATOR - $68.40 Invoice 6974 - 151534 3/24/2011 Project SA -2 Cash Payment E 602 -49450 -221 Equipment Parts CREDIT RETURN AIR FILTER -$9.96 Invoice 6974 - 151594 3/25/2011 Project SA -2 Cash Payment E 101 -43100 -221 Equipment Parts EXHAUST MANIFOLD SET 2005 CHEVY $13.50 SILVERADO Invoice 6974 - 151677 3/28/2011 Cash Payment E 101 -43100 -221 Equipment Parts ENGINE MOUNTS 2005 CHEVY SILVERADO $190.60 Invoice 6974 - 151568 3/25/2011 Cash Payment E 602 -49450 -221 Equipment Parts RETURN - $24.62 Invoice 6974 - 148789 3/31/2011 Cash Payment E 10142110 -404 Machinery/Equip Repairs OIL FILTER $4.05 Invoice 6974 - 151247 3/21/2011 Cash Payment E 10142110 -404 Machinery/Equip Repairs J CASE, FUSE #844 $0.53 Invoice 6974 - 150689 3/14/2011 Cash Payment E 101 - 42110 -404 Machinery/Equip Repairs J CASE, FUSE #844 $5.33 Invoice 6974 - 150681 3/14/2011 •Cash Payment E 101 - 45200 -404 Machinery/Equip Repairs GAS CAP FOR 1994 FORD F350 $7.77 Invoice 6974- 152128 4/1/2011 Cash Payment E 101 - 42110 -404 Machinery/Equip Repairs SEAT BACK RETAINER $3.21 Invoice 6974- 151091 3/18/2011 Cash Payment E 101 -43100 -221 Equipment Parts BATTERIES $210.61 Invoice 6974 - 151554 3/25/2011 Cash Payment E 101 -43100 -221 Equipment Parts EASY SEAL CLAMP $25.59 Invoice 6974 - 151570 3/25/2011 Cash Payment E 601 -49400 -221 Equipment Parts AIR FILTER $15.25 Invoice 6974 - 151566 3/25/2011 Cash Payment E 101 -43100 -221 Equipment Parts BELTS, CUT OFF SAW STIHL $19.94 Invoice 6974 - 150271 3/8/2011 Cash Payment E 602 -49450 -221 Equipment Parts OIL FILTERS $38.33 Invoice 6974 - 151247 3/21/2011 Cash Payment E 101 -43100 -221 Equipment Parts PIGGYBACK KIT $69.86 Invoice 6974 - 150305 3/8/2011 Cash Payment E 602 -49450 -221 Equipment Parts OIL FILTERS $67.65 Invoice 6974 - 150509 3/10/2011 Project SA -2 Cash Payment E 602 -49450 -221 Equipment Parts AIR FILTER $9.96 Invoice 6974 - 151550 3/25/2011 Cash Payment E 602 -49450 -221 Equipment Parts ALTERNATOR $208.69 Invoice 6974 - 151491 3/24/2011 Cash Payment E 602 -49450 -230 Shop Materials TESTER ADAPTER $65.51 Invoice 6974 - 150448 3/10/2011 Project SA -2 Cash Payment E 602 -49450 -230 Shop Materials DIESEL FUEL SUPPLEMENT, COOLANT, $122.76 •BRAKE Invoice 6974- 149721 2/28/2011 CLEANER Project SA -2 Cash Payment E 602 -49450 -230 Shop Materials CUT OFF WHL $11.79 Invoice 6974 - 149768 3/1/2011 Project SA -2 -760- I, CITY OF MOUND CITY OF MOUND Payments Current Period: April 2011 04121/11 11:35 AM Page 3 Cash Payment E 60249450 -221 Equipment Parts RETURN FUEL FILTER - $24.62 Invoice 6974 - 148789 2/15/2011 Project SA -2 Cash Payment E 60149400 -221 Equipment Parts ALTERNATOR AND RETURN ALTERNATOR $55.01 Invoice 6674- 151496 3/24/2011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $1,407.24 Refer 115 CECE'S SIGNS Ck# 037478 4/8/2011 Cash Payment E 101 - 41910401 Building Repairs REPLACE SINAGE AT CITY HALL $465.28 Invoice 5053 3/712011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $465.28 Refer 116 FED. NATIONAL MORTGAGE ASSO Ck# 037479 4/8/2011 • Cash Payment R 601 -49400 -36200 Miscellaneous Revenu 1586 DOVE LN REFUND OVERPAYMENT OF $386.27 WATER BILL $486.42 Refer 122 SPRINT WIRELESS Ck# 037484 4/8/2011 Invoice 032311 3123/2011 Cash Payment E 101 -42110 -321 Telephone & Cells Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $386.27 Refer 117 IKON FINANCIAL SERVICE S ��- � Ck# 037480 4/8/2011 Transaction Date Cash Payment E 222 -42260 -202 Duplicating and copying FIRE DEPT BLACK AND WHITE Wells Fargo 10100 Total $53.38 Invoice 1027537383 3/18/2011 Cash Payment Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $53.38 Refer 118 MUZAK - MINNEAPOLIS Ck# 037481 4/8/2011 SUBURBAL UTILITIES SUPERINTENDENTS Cash Payment E 609 - 49750 -440 Other Contractual Servic MUSIC SERVICES APRIL 2011 $105.94 e Invoice All 5754 4/1/2011 Invoice 040111 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $105.94 Refer 119 REMAXADVISORS WEST Ck# 037482 4/8/2011 _s.. Wells Fargo 10100 Total Cash Payment R 601 -49400 -36200 Miscellaneous Revenu 3149 ALEXANDER LN REFUND $125.75 OVERPAYMENT OF WATER BILL Invoice 031811 3/18/2011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $125.75 Refer 120 SPRINT WIRELESS (FIRE) Ck# 037485 4/8/2011 Cash Payment E 222 -42260 -321 Telephone & Cells FIRE PHONE 2 -13 -11 TO 3 -12 -11 $136.03 Invoice 617320297 -030 3/16/2011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $136.03 Refer 121 SPRINT WIRELESS Ck# 037484 4/8/2011 Cash Payment E 101 -42110 -321 Telephone & Cells POLICE PHONE SERVICE 2 -15 -11 TO 3 -14 -11 $486.42 Invoice 924573317 -112 3/18/2011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $486.42 Refer 122 SPRINT WIRELESS Ck# 037484 4/8/2011 Cash Payment E 101 -42110 -321 Telephone & Cells POLICE PHONE 2 -15 -11 TO 3 -14 -11 $319.92 Invoice 772348811 -040 3/18/2011 Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $319.92 Refer 124 SUBURBAN UTILITIES SUPERINTE Ck# 037486 4/8/2011 Cash Payment E 602 - 49450 -433 Dues and Subscriptions R. HANSON 2011 MEMBERSHIP DUES $100.00 SUBURBAL UTILITIES SUPERINTENDENTS ASSOC. Invoice 040111 4/1/2011 Project SA -2 • Transaction Date 4/6/2011 Due 0 Wells Fargo 10100 Total $100.00 Refer 196 SCDIU TACTICAL TEAM Ck# 037483 761-" CITY OF MOUND 04 /21/11 11:35 AM Page 4 Payments • CITY OF MOUND Current Period: April 2011 Cash Payment E 101 - 42110 -434 Conference & Training SNIPER BASIC COURSE -KEN BECK $225.00 Invoice 040811 3/21/2011 PO 23198 Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $225.00 Refer 197 VERIZON WIRELESS Ck# 037488 4/8/2011 Cash Payment G 101 -22816 Personal Cell Phone CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $9.07 Invoice 2544509523 3/13/2011 Cash Payment E 101 -41310 -321 Telephone & Cells CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $34.34 Invoice 2544509523 3/13/2011 Cash Payment E 101 -45200 -321 Telephone & Cells CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $196.13 Invoice 2544509523 3/13/2011 Cash Payment E 101 -42400 -321 Telephone & Cells CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $17.49 Invoice 2544509523 3/13/2011 Cash Payment E 602 -49450 -321 Telephone & Cells CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $144.12 Invoice 2544509523 3/13/2011 Cash Payment E 101 -43100 -321 Telephone & Cells CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $163.84 Invoice 2544509523 3/13/2011 Cash Payment G 101 -13100 Due From Other Funds CELL PHONE SERVICE 3 -14-11 THRU 4 -13 -11 $34.23 Invoice 2544509523 3/13/2011 Cash Payment E 601 -49400 -321 Telephone & Cells CELL PHONE SERVICE 3 -14 -11 THRU 4 -13 -11 $289.56 Invoice 2544509523 3/13/2011 • Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $888.78 Refer 198- XCEL ENERGY Ck# 037489 4/8/2011 Cash Payment E 101 -42110 -381 Electric Utilities ELECTRIC 1 -30-11 THRU 2 -28 -11 $1,719.62 Invoice 363297876 3/14/2011 Cash Payment E 101 -41910 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $780.37 Invoice 363297876 3/14/2011 Cash Payment E 10145200 -381 Electric Utilities DEPOT BLDG ELECTRIC 1 -30 -11 THRU 2 -28- $71.51 11 Invoice 363297876 3/14/2011 Cash Payment E 22242260 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $1,719.62 Invoice 363297876 3/14/2011 Cash Payment E 60149400 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $3,663.18 Invoice 363297876 3/14/2011 Cash Payment E 10143100 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $968.04 Invoice 363297876 3/14/2011 Cash Payment E 602 -49450 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $1,233.80 Invoice 363297876 3/14/2011 Cash Payment E 101-45200 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $150.61 Invoice 363297876 3/14/2011 Cash Payment E 28546388 -381 Electric Utilities DECK ELECTRIC 1 -30 -11 THRU 2 -28 -11 $2,455.57 Invoice 363297876 3/14/2011 Cash Payment E 609 -49750 -381 Electric Utilities ELECTRIC 1 -30 -11 THRU 2 -28 -11 $1,168.62 Invoice 363297876 3/14/2011 Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $13,930.94 Refer 199 TRUE VALUE, MOUND Ck# 037487 4/8/2011 •Cash Payment G 101 -22810 X -Mas Donation /Expense CHRISTMAS LIGHTS $27.77 Invoice 080893 3/17/2011 Cash Payment E 101 -41910 -210 Operating Supplies LIQUID HAND SOAP $6.39 Invoice 080881 3/17/2011 -762- CITY OF MOUND 04/21/11 11:35 AM Page 5 Payments O CITY OF MOUND Current Period: April 2011 BOLTS, Invoice 080866 3/16/2011 Cash Payment E 609 -49750 -210 Operating Supplies ELECTRICIANS TAPE $5.87 Invoice 081045 3/24/2011 Cash Payment Cash Payment E 609- 49750 -401 Building Repairs SHELVING HARDWARE $16.01 Invoice 080845 3/16/2011 Cash Payment Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $56.04 Refer 200 TRUE VALUE, MOUND Ck# 037487 4/8/2011 WIRE Cash Payment E 101 -45200 -220 Repair/Maint Supply FURNACE FILTER, SCREWS, BOLTS $10.26 Invoice 081274 4/1/2011 E 602 -49450 -230 Shop Materials SCREWS, NUTS, BOLTS Cash Payment E 101 -45200 -220 Repair /Maint Supply BULBS, KNIVES $29.35 Invoice 081022 3/23/2011 E 602 -49450 -223 Building Repair Supplies GLASS SCRAPER, MOP HEAD Cash Payment E 101 -45200 -220 Repair/Maint Supply STAIN, OT IND /OUT FILLER, $29.14 Invoice 081209 3/30/2011 E 602 -49450 -230 Shop Materials CABLE & CLAMP CONNECTOR Cash Payment E 101 -45200 -220 Repair/Maint Supply MASONRY BIT, BLADE, SCREWS, NUTS, $14.03 BOLTS, Invoice 080866 3/16/2011 Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $82.78 Refer 201 TRUE VALUE, MOUND Ck# 037487 4/8/2011 Cash Payment E 60249450 -230 Shop Materials CABLE, CONDUIT, CONNECTORS $10.07 Invoice 080798 3/14/2011 Project SA -2 Cash Payment E 60249450 -223 Building Repair Supplies TOG SWITCH, WALL PLATE, CABLE, BLDG $35.98 WIRE 081037 3/24/2011 Project SA -2 •Invoice Cash Payment E 602 -49450 -230 Shop Materials SCREWS, NUTS, BOLTS $6.94 Invoice 080972 3/21/2011 Cash Payment E 602 -49450 -223 Building Repair Supplies GLASS SCRAPER, MOP HEAD $13.86 Invoice 080928 3/18/2011 Project SA -2 Cash Payment E 602 -49450 -230 Shop Materials CABLE & CLAMP CONNECTOR $5.50 Invoice 080801 3/14/2011 Project SA -2 Cash Payment E 60249450 -230 Shop Materials DRILL BITS, BIT HOLDER, SCREWS, NUT, $45.77 BOLTS Invoice 080897 3/18/2011 Project SA -2 Cash Payment E 60249450 -223 Building Repair Supplies FLOOR STRIPPER, MOP REFILL $51.79 Invoice 080927 3/18/2011 Project SA -2 Cash Payment E 60249450 -223 Building Repair Supplies SCREWS, NUTS, BOLTS $2.89 Invoice 080912 3/18/2011 Project SA -2 Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $172.80 Refer 202 TRUE VALUE, MOUND Ck# 037487 4/8/2011 Cash Payment E 60149400 -322 Postage FED EX SHIPPING TO FERGUSON $9.01 WATERWORKS Invoice 080985 3/21/2011 Cash Payment E 60149400 -220 Repair/Maint Supply 3 1/8 HOLE SAW $26.71 Invoice 081143 3/28/2011 Cash Payment E 60149400 -220 Repair/Maint Supply SCREWS, NUTS, BOLTS, CLEAR FLAT $7.47 ENAMEL Invoice 081214 3/30/2011 Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $43.19 Refer 203 TRUE VALUE, MOUND Ck# 037487 4/8/2011 • Cash Payment E 60249450 -210 Operating Supplies DELIMER/CLEANER, GAS CYLINDER, AIR $26.99 FRESHFNFR DISINFECTANT Invoice 081211 3/30/2011 -763- CITY OF MOUND 04/21/11 11:35 AM Page 6 Payments •CITY OF MOUND • Current Period: April 2011 Cash Payment E 602 -49450 -220 Repair/Maint Supply MINI BAR CLAMP $18.16 Invoice 081021 3/23/2011 Cash Payment E 602 -49450 -322 Postage FED EX SHIPPING CHARGE UEMSI $12.20 Invoice 081208 3/30/2011 Cash Payment E 602 -49450 -210 Operating Supplies RUBBERHOSE WASHERS, GRIP GLOVES $24.43 Invoice 081241 3/31/2011 Transaction Date 4/8/2011 Due 0 Wells Fargo 10100 Total $81.78 Fund Summary BATCH Total $33,966.07 10100 Wells Fargo 101 $6,850.93 222 $2,005.63 285 $2,455.57 601 $4,578.21 602 $2,499.08 609 $1,296.44 670 $14,280.21 $33,966.07 Pre - Written Checks $33,966.07 Checks to be Generated by the Compute $0.00 Total $33,966.07 -764- CITY OF MOUND Batch Name 0414CITYMAN Payment CITY OF MOUND Payments Current Period: April 2011 04/21/11 11:37 AM Page 1 Computer Dollar Amt $34,134.19 Posted Refer 207 MULCH STORE, THE Ck# 037591 4/14/2011 Cash Payment E 670 - 49500 -430 Miscellaneous 2011 CITY OF MOUND CONTRACT FOR 2500 $12,500.00 YARDS Invoice 9074 3/31/2011 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $12,500.00 Refer 208 RDO EQUIPMENT COMPANY Ck# 037593 4/14/2011 Cash Payment E 101 -43100 -221 Equipment Parts BRUSH SET $48.69 Invoice P66536 3/16/2011 Cash Payment E 101 -43100 -221 Equipment Parts BUMPER $155.03 Invoice P66441 3/14/2011 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $203.72 Refer 209 STONEBROOKE EQUIPMENT, INC Ck# 037594 4114/2011 Cash Payment E 101 - 45200 -409 Other Equipment Repair PIN, WING SLIDE BOX PIVOT $40.46 Invoice 18768 4/4/2011 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $40.46 Refer 210 T- MOBILE CELL PHONE Ck# 037595 4/14/2011 Cash Payment G 101 -22816 Personal Cell Phone CELL PHONE SERVICE 03 -03 -11 THRU 04 -02- $23.00 11 Invoice 041411 4/3/2011 Cash Payment E 28145210 -321 Telephone & Cells CELL PHONE SERVICE 3 -03 -11 TO 4 -02 -11 $45.94 Invoice 041411 4/3/2011 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $68.94 Refer 211 TROPHIES BY LINDA Ck# 0375964/14/2011 Cash Payment E 101 - 42110 -430 Miscellaneous 3 POLICE OFFICER AWARD PLAQUES $71.07 Invoice 23306 3/21/2011 PO 23203 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $71.07 Refer 212 NOBLE CONSERVATION SOLUTIO Ck# 037592 4/14/2011 Cash Payment E 609- 49750 -401 Building Repairs ENERGY UPGRADES TO LIGHTING $13,260.00 Invoice 2009 -0200 3/4/2011 Cash Payment E 101 - 41910 -400 Repairs & Maintenance HVAC CITY HALL $7,390.00 Invoice 2009 -0200 3/4/2011 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $20,650.00 Refer 213 BUREAU OF CRIMINAL APPREN T Ck# 037590 4/14/2011 Cash Payment E 101 - 42110 -434 Conference & Training D.A.R.E. DOT TRAINING WITTKE -JAN 24 $600.00 THRU FEB 4 2011 Invoice 204 3/23/2011 PO 23170 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total $600.00 -765- s • 0 CITY OF MOUND Fund Summary 101 281 609 670 CITY OF MOUND Payments 04/21/11 11:37 AM Page 2 Current Period: April 2011 BATCH Total $34,134.19 10100 Wells Fargo $8,328.25 $45.94 $13,260.00 $12,500.00 $34,134.19 Pre - Written Checks $34,134.19 Checks to be Generated by the Compute $0.00 Total $34,134.19 • is -766- CITY OF MOUND Payments CITY OF MOUND Current Period: April 2011 Batch Name 041411 CITY Payment Computer Dollar Amt $1,072.00 Posted Refer 214 LAW ENFORCEMENT EXPLORER, Ck# 037597 4/14/2011 Cash Payment G 101 -22806 Police Explorers SECOND HALF 2011 EXPLORER STATE CONFERENCE PAYMENT Invoice 041411 4114/2011 Transaction Date 4/14/2011 Due 0 Wells Fargo 10100 Total Fund Summary BATCH Total 10100 Wells Fargo 101 $1,072.00 $1,072.00 Pre - Written Checks $1,072.00 Checks to be Generated by the Compute $0.00 Total $1,072.00 -767- 040/11 10:09 AM Page 1 $1,072.00 $1,072.00 • 0 � 01 • CITY OF MOUND 04/20/11 10:21 AM Page 1 Payments CITY OF MOUND Current Period: April 2011 Batch Name 0420CITYMAN Payment Computer Dollar Amt $1,130.22 Posted Refer 1 MOUND POST OFFICE Ck# 037598 4/20/2011 Cash Payment E 602 -49450 -322 Postage UTILITY BILLING POSTAGE APRIL WATER BILLS Invoice 042011 4/20/2011 Cash Payment E 601 -49400 -322 Postage UTILITY BILLING POSTAGE APRIL WATER BILLS Invoice 042011 4/20/2011 Transaction Date 4/20/2011 Due 0 Wells Fargo 10100 Total Refer 2 POSTMASTER Ck# 037599 4/20/2011 Cash Payment E 101 -41110 -322 Postage CITY CONTACT NEWSLETTER POSTAGE - SPRING 2011 Invoice 042011 4/20/2011 Transaction Date 4/20/2011 Due 0 Wells Fargo 10100 Total Fund Summary BATCH Total 10100 Wells Fargo 101 $825.94 601 $152.14 602 $152.14 $1,130.22 Pre -Written Check $1,130.22 Checks to be Generated by the Compute $0.00 Total $1,130.22 $152.14 $152.14 $304.28 $825.94 $825.94 $1,130.22 CITY OF MOUND Payments CITY OF MOUND Current Period: April 2011 Batch Name 042611 CITY User Dollar Amt $344,837.19 Payments Computer Dollar Amt $344,837.19 $0.00 In Balance 04/21/11 11:22 AM Page 1 Refer 24 AMERICAN ENGINEERING TESTIN Cash Payment E 60149400 -440 Other Contractual Servic GEOTECHNICAL EXPLORATION SVC 2012 6" $4,100.00 WATERMAIN PROJECT WINDSOR AND IVD Invoice 50722 3131/2011 PO 23544 Transaction Date 4/21/2011 Wells Fargo 10100 Total Refer ,.. 2 NAMUNDSON, M. LLPF _ Cash Payment E 609 -49750 -256 Tobacco Products For R TOBACCO PRODUCTS Invoice 107035 4/13/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Refer 3 ARCTIC GLACIER PREMIUM ICE $4,100.00 $522.20 Total $522.20 Cash Payment E 609 -49750 -255 Misc Merchandise For R ICE $129.89 Invoice 460109813 4/8/2011 Transaction Date 4/2012011 Wells Fargo 10100 Total $129.89 Refer 4 ASPEN EQUIPMENT _ Cash Payment E 10143100 -221 Equipment Parts KNIFE SHARPENING #204 CHIPPER $53.06 Invoice 10084047 4/6/2011 Cash Payment E 101 -43100 -221 Equipment Parts KNIFE SHARPENING #204 CHIPPER $291.07 Invoice 10084034 4/6/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $344.13 Refer 6 BELLBOY CORPORATION Cash Payment E 609 -49750 -253 Wine For Resale WINE $718.00 Invoice 57224400 2/28/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT $20.15 Invoice 57224400 2/28/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $738,15 Refer 7 BELLBOY CORPORATION _ Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $872.17 Invoice 57821500 4/8/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT $18.73 Invoice 57821500 4/8/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $3,021.45 Invoice 57841400 4/11/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $559.00 Invoice 57924500 4/15/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT $7.75 Invoice 57924500 4/15/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $4,479.10 Refer 9 BELLBOY CORPORATION _ Cash Payment E 609 -49750 -210 Operating Supplies BAGS $28.00 Invoice 85044900 4/11/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $28.00 Refer 10 BELLBOY CORPORATION -769- • • • CITY OF MOUND 04/21/11 11:22 AM Page 2 I, Payments CITY OF MOUND Current Period: April 2011 Cash Payment E 609 -49750 -255 Misc Merchandise For R MISC MERCHANDISE $9.30 Invoice 85039100 4/8/2011 Cash Payment E609-49750-210 Operating Supplies BAGS $48.50 Invoice 85039100 4/8/2011 Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa MIX $28.89 Invoice 85039100 4/8/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $86.69 Refer 11 BELLBOY CORPORATION _ Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa MIX $28.60 Invoice 85044300 4/11/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $28.60 Refer 18 BELLBOY CORPORATION _ Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $3,133.65 Invoice 57939800 4/18/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $3,133.65 Refer 12 BERNICKS BEVERAGES AND VEN _ Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa SOFT DRINKS $141.69 Invoice 21987 4/13/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $780.00 21988 4/13/2011 •invoice Transaction Date 4/20/2011 Wells Fargo 10100 Total $921.69 Refer 66 BOLTON AND MENK, INCORPORA _ Cash Payment E 602 -49450 -300 Professional Srvs SEWER I &I ANALYSIS 2 -5 -11 TO 3 -18 -11 $1,590.00 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment E 101 -42400 -300 Professional Srvs 4757 IVD PUBLIC LANDS PERMIT 2 -5 -11 TO 3- $142.00 18 -11 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment G 101 -23239 5174 TUXEDO PL11 -02 5174 Tuxedo expansion 2 -5 -11 TO 3 -18 -11 $71.00 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment G 101 -23236 Westonka Animal Hospit #10 SHORELINE COMP PLAN AMEND -WEST $142.00 ANIMAL HOSP. 2 -5 -11 TO 3 -18 -11 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment E 675 -49425 -300 Professional Srvs STORMWATER/UTILITY SWPPP UPDATE 2 -5- $737.00 11 TO 3 -18 -11 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment E 402 -43120 -300 Professional Srvs MSA SYSTEM UPDATE 2 -5 -11 TO 3 -18 -11 $4,179.00 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment E 601 -49400 -300 Professional Srvs WELLHEAD PROTECTION PLAN 2 -5 -11 TO 3- $213.00 18 -11 ENGINEERING SVC Invoice 0138905 3/31/2011 Cash Payment E 602 -49450 -300 Professional Srvs 2009 LIFT STATION RECONSTRUCTION 2 -5- $85.00 11 TO 3 -18 -11 ENGINEERING SVC Invoice 0138905 3/31/2011 Project PW0904 Cash Payment E 401 -43160 -300 Professional Srvs STREET LIGHT REPLACEMENT 2 -5 -11 TO 3- $449.00 18 -11 ENGINEERING SVC Invoice 0138905 3/31/2011 Project PWO907 -770- � � I, CITY OF MOUND CITY OF MOUND Payments Current Period: April 2011 Cash Payment E 401 -43101 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 401 -43127 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 675 -49425 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 675 -49425 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 602 -49450 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 602 -49450 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 401 -46590 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 602 -49450 -500 Capital Outlay FA Invoice 0138905 3/31/2011 Cash Payment E 601 -49400 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 602 -49450 -300 Professional Srvs Invoice 0138905 3/31/2011 Cash Payment E 101 -43100 -300 Professional Srvs 04/21/11 11:22 AM Page 3 2011 STREET, UTILITY & WALL IMPRO SW $59,717.00 ISLAND AREA 2 -5 -11 TO 3 -18 -11 Transaction Date 4/21/2011 ENGINEERING SVC $148,226.20 Project PW1101 2011 STREET IMPROV $52,909.25 RIDGEWOOD /IDLEWOOD, HIGHLANDS 2 -5- $24.62 11 TO 3 -18 -11 ENGINEERING SVC Project SA -2 Project PW1102 Cash Payment E 602 -49450 -230 Shop Materials 2010 DRAINAGE IMPROVEMENTS 2 -5 -11 TO $142.00 3 -18 -11 ENGINEERING SVC Project SA -2 Project PW1003 Cash Payment E 601 -49400 -221 Equipment Parts SURFACE WATER MGMT 2 -5 -11 TO 3 -18 -11 $2,169.00 ENGINEERING SVC 2010 LIFT STATION RECONSTRUCTION 2 -5- $2,520.45 11 TO 3 -18 -11 ENGINEERING SVC Project PW1002 LIFT STATION MTCE PLAN 2 -5 -11 TO 3 -18 -11 $355.00 ENGINEERING SVC PIN BLDGS IMPROVEMENTS 2 -5 -11 TO 3 -18- $5,383.50 11 ENGINEERING SVC 2011 LIFT STATION RECONSTRUCTION 2 -5- $13,363.00 11 TO 3 -18 -11 ENGINEERING SVC Project PW1103 WATERMAIN LOOP IVD TO WINDSOR RD 2 -5- $1,628.50 11 TO 3 -18 -11 ENGINEERING SVC UPDATE STREET & UTILITY MAPS 2 -5 -11 TO $707.00 3 -18 -11 ENGINEERING SVC Project SA -2 2 -5 -11 TO 3 -18 -11 GENERAL ENGINEERING $1,723.50 SVC Invoice 0138905 3/31/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $148,226.20 Refer �.. �40 CARQUEST OF NAVARRE (P/I40 Cash Payment E 602 -49450 -230 Shop Materials FUEL FILTER CREDIT TAKEN TWICE $24.62 Invoice 6974 - 148789 2/15/2011 Project SA -2 Cash Payment E 602 -49450 -230 Shop Materials SHOP SUPPLIES PD TWICE - $122.76 Invoice 6974 - 149721 2/28/2011 Project SA -2 Cash Payment E 601 -49400 -221 Equipment Parts LOCK ROD CLIP $3.13 Invoice 6974 - 15000- 3/3/2011 Cash Payment E 101 -43100 -221 Equipment Parts AIR FILTER $35.39 Invoice 6974 - 152033 3/31/2011 Transaction Date 4/21/2011 Refer 43 CARQUEST OF NAVARRE (P/VV _ Cash Payment E 101 -42110 -220 Repair/Maint Supply Invoice 6974 - 152383 4/5/2011 Cash Payment E 101 -43100 -221 Equipment Parts Invoice 6974 - 152383 4/5/2011 Wells Fargo 10100 PIGTAIL SOCKET PIGTAIL SOCKET #304 -771- Total - $59.62 $4.39 $4.36 • • • CITY OF MOUND 04/21/11 11:22 AM Page 4 • Payments CITY OF MOUND Current Period: April 2011 Cash Payment E 602 -49450 -230 Shop Materials TERMINALS -SHOP SUPPLIES $20.95 Invoice 6974 - 151333 3/22/2011 Project SA -2 Cash Payment E 101 -43100 -221 Equipment Parts PIGGYBACK KIT #304 $139.73 Invoice 6974 - 152030 3/31/2011 Cash Payment E 602 -49450 -221 Equipment Parts INSERTS 1/2 13 KIT SEWER $48.52 Invoice 6974 - 152059 3/31/2011 Cash Payment E 101 -43100 -221 Equipment Parts AIR FILTERS -3 #304 $50.36 Invoice 6974 - 152055 3/31/2011 Cash Payment E 101 -43100 -221 Equipment Parts AUTO BATTERIES -3 TENANT SINGE FOR $73.96 #108 Invoice 6974 - 152621 4/7/2011 Cash Payment E 101 -43100 -221 Equipment Parts Invoice 6974 - 151554 3/25/2011 Cash Payment E 101 -43100 -221 Equipment Parts Invoice 6974 - 152054 3/31/2011 Cash Payment E 602 -49450 -230 Shop Materials Invoice 6974 - 152914 4/11/2011 Cash Payment E 101 -43100 -221 Equipment Parts Invoice 6974 - 153289 4/14/2011 Cash Payment E 101 -43100 -221 Equipment Parts Invoice 6974 - 152721 4/8/2011 • Transaction Date 4/2112011 Refer 13 CENTERPOINT ENERGY (MINNEG _ Cash Payment E 101 -45200 -383 Gas Utilities Invoice 042611 4/8/2011 Cash Payment E 101 -41910 -383 Gas Utilities Invoice 042611 418/2011 Cash Payment E 602 -49450 -383 Gas Utilities Invoice 042611 4/812011 Cash Payment E 609 -49750 -383 Gas Utilities Invoice 042611 4/8/2011 Cash Payment E 222 -42260 -383 Gas Utilities Invoice 042611 4/8/2011 Cash Payment E 101 -42110 -383 Gas Utilities Invoice 042611 4/8/2011 Cash Payment E 101 -45200 -383 Gas Utilities Invoice 042611 4/8/2011 Transaction Date 4/20/2011 Refer 14 CLEAN CONSTRUCTION & BUILDI DUAL TERM BATTERIES -10 SWEEPER #304 $210.61 OIL & FUEL FILTERS #407 & #304- SWEEPER $219.45 TERMINALS -SHOP SUPPLIES Project SA -2 OIL FILTER #851 & BATTERY #192 POLY GUARD 30W NON DETERGENT Wells Fargo A 10100 Total GAS SERVICE 02 -16 -11 TO 03 -18 -11 PARKS BLDG $11.76 $10.87 $14.92 $809.88 $785.22 GAS SERVICE 02 -16 -11 TO 03 -18 -11 CITY $1,135.49 HALL GAS SERVICE 02 -16 -11 TO 03 -18 -11 PUBLIC $1,700.98 WORKS Project SA -2 GAS SERVICE 02 -16 -11 TO 03 -18 -11 LIQUOR $436.80 STORE GAS SERVICE 02 -16 -11 TO 03 -18 -11 FIRE $659.82 GAS SERVICE 02 -16 -11 TO 03 -18-11 POLICE $659.81 DEPT GAS SERVICE 02 -16 -11 TO 03 -18 -11 DEPOT $225.22 BLDG Wells Fargo 10100 Total $5,603.34 Cash Payment E 609 - 49750 -440 Other Contractual Servic STRIP & APPLY 4 COATS FLOOR FINISH $801.56 Invoice 1270 4/16/2011 • Transaction Date 4/20/2011 Wells Fargo 10100 Total $801.56 Refer 5 COCA COLA BOTTLING- MIDWEST -772- CITY OF MOUND 04/21/11 11:22 AM I, Page 5 Payments • CITY OF MOUND Current Period: April 2011 Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa COCA COLA PRODUCTS $145.90 Invoice 0188056419 4/14/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $145.90 Refer 17 CONSTRUCTION BULLETIN _ Cash Payment E 401 -43101 -351 Legal Notices Publishing 2011 STREET, UTILITY & RETAINING WALL $89.25 IMPROVEMENT PUBLICATION 4-4 -11 ISSUE Invoice 53582 4/5/2011 Project PW1101 Cash Payment E 401 -43127 -351 Legal Notices Publishing 2011 STREET, UTILITY & RETAINING WALL $89.25 IMPROVEMENT PUBLICATION 4-4 -11 ISSUE Invoice 53582 4/5/2011 Project PW1102 Cash Payment E 401 -43101 -351 Legal Notices Publishing 2011 STREET, UTILITY & RETAINING WALL $89.25 IMPROVEMENT PUBLICATION 4 -11 -11 ISSUE Invoice 53773 4/8/2011 Project PW1101 Cash Payment E 401 -43127 -351 Legal Notices Publishing 2011 STREET, UTILITY & RETAINING WALL $89.25 IMPROVEMENT PUBLICATION 4 -11 -11 ISSUE Invoice 53773 4/8/2011 Project PW1102 Transaction Date 4/20/2011 Wells Fargo 10100 Total $357.00 Refer 24 CRAIG, JEFF _ Cash Payment R 281 -45210 -34725 Dock Permits DOCK REFUND -NO SECOND BOAT WIP $75.00 04305 BRIGHTON Invoice 042611 4/13/2011 • Cash Payment R 281 -45210 -34705 LMCD Fees DOCK REFUND -NO SECOND BOAT WIP $15.00 04305 BRIGHTON Invoice 042611 4/13/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $90.00 Refer 18 DAHLHEIMER BEVERAGE LLC _ Cash Payment E 609 -49750 -252 Beer For Resale BEER $272.00 Invoice 44364 4/11/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $272.00 Refer 19 DAY DISTRIBUTING COMPANY Cash Payment E 609 -49750 -252 Beer For Resale BEER $2,320.00 Invoice 596190 4/12/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $234.00 Invoice 596191 4/12/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $2,554.00 Refer 16 DAY DISTRIBUTING COMPANY _ Cash Payment E 609 -49750 -252 Beer For Resale BEER $891.85 Invoice 597011 4/19/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $891.85 Refer 20 DUSSAUT, ALEJANDRO C. _ Cash Payment R 601 -49400 -36200 Miscellaneous Revenu REFUND WATER UTILITIES OVERPAYMENT $38.16 6325 ALWIN CIRCLE Invoice 042611 4/18/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $38.16 Refer 21.- GLENWOODINGLEWOOD� Cash Payment E 101 - 42110 -430 Miscellaneous HOT & COLD WATER COOLER $121.52 Invoice 042611 4/16/2011 Transaction Date 4/2012011 Wells Fa 10100 Total $121.52 -773- CITY OF MOUND 04/21/11 11.22 AM I, Page 6 Payments CITY OF MOUND Current Period: April 2011 Refer 22 HENNEPIN COUNTY ATTORNEYS _ Cash Payment G 101 -22805 Police Forfeiture Program G. JOHNSON FORFEITURE 20% OF $1,300.00 PROCEEDS Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $1,300.00 Refer 13 HOHENSTE/NS, INCORPORATED _ Cash Payment E 609 -49750 -252 Beer For Resale BEER $165.50 Invoice 556163 4/18/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $165.50 Refer 27 HOIS/NGTON KOEGLER GROUP, I Cash Payment G 101 -23236 Westonka Animal Hospit #10 PROFESSIONAL PLANNING SERVICES $958.90 MARCH 2011 4867 & 4873 SHORELINE DRIVE Invoice 007 - 005 -38 4/7/2011 Cash Payment E 10142400 -300 Professional Srvs PROFESSIONAL PLANNING SERVICES $20.75 MARCH 2011 ISLAND VIEW DRIVE PUBLIC LANDS Invoice 007 - 005 -38 4712011 Cash Payment G 101 -23238 1736 SHOREWOOD PL11 -0 PROFESSIONAL PLANNING SERVICES $166.00 MARCH 2011 1736 SHOREWOOD LANE Invoice 007 - 005 -38 4/7/2011 Cash Payment E 101 -42400 -300 Professional Srvs PROFESSIONAL PLANNING SERVICES $290.50 •MARCH 2011 SCHAEFFER RICHARDSON Invoice 007 - 001 -35 4/7/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $1,436.15 Refer 30 INFRATECH _ Cash Payment E 602 -49450 -210 Operating Supplies Invoice 1100175 4/12/2011 Cash Payment E 602 -49450 -221 Equipment Parts Invoice 1100152 3/28/2011 Transaction Date 4/20/2011 Refer 28 INTERNATIONAL INSTITUTE MUNI SENSOR FOR PHD PLUS CALIBRATION, MARKING FLAGS & PAINT Project SA -2 3 5 PIN & 4 PIN FIBER ARMOR TERMINATION $479.88 $742.96 Wells Fargo 10100 Total $1,222.84 Cash Payment E 101 - 41310 -433 Dues and Subscriptions ANNUAL MEMBERSHIP MUNICIPALS CLERKS THRU 6 -30 -2012 Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total ReferT 31 INTRCOMM TECHNOLOGY Cash Payment E 101 - 41920 -440 Other Contractual Servic INTERNET & NETWORK TECH SUPPORT MARCH 2011 Invoice 58104 4/8/2011 PO 22558 Transaction Date 4/20/2011 Refer 32 JJ TAYLOR DISTRIBUTING MINN _ Cash Payment E 609 -49750 -252 Beer For Resale Invoice 1533301 4/18/2011 Cash Payment E 609 -49750 -252 Beer For Resale •Invoice 1533325 4/18/2011 Cash Payment E 609 -49750 -252 Beer For Resale Invoice 1533288 4/11/2011 $160.00 $160.00 $897.75 Wells Fargo 10100 Total $897.75 BEER $3,985.85 BEER $28.80 BEER $4,390.85 -774- CITY OF MOUND 04/21/11 11:22 AM I, Page 7 Payments CITY OF MOUND Current Period: April 2011 Refer 33 JOHNS VARIETY AND PETS _ Cash Payment E 101 -41910 -220 Repair/Maint Supply Invoice 329057 4/8/2011 Transaction Date 4/20/2011 Refer _ 34 JOHNSON BROTHERS LIQUOR _ Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1031738 4/6/2011 Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1031740 4/6/2011 Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1036342 4/13/2011 Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1036344 4/13/2011 Transaction Date 4/20/2011 Refer 35 JOHNSON BROTHERS LIQUOR _ Cash Payment E 609 -49750 -253 Wine For Resale Invoice 1031739 4/6/2011 Cash Payment E 609 -49750 -253 Wine For Resale Invoice 1036343 4/13/2011 Transaction Date 4/20/2011 Refer 62 KENNEDYAND GRAVEN _ Cash Payment E 101 -41600 -300 Professional Srvs Invoice 042611 4111/2011 Cash Payment E 101 -41600 -300 Professional Srvs 2 FLOWER POTS -CITY HALL $64.13 Wells Fargo 10100 Total $64.13 Cash Payment E 60949750 -254 Soft Drinks/Mix For Resa BEER $143.80 Invoice 1533289 4/11/2011 $1,739.17 LIQUOR Cash Payment E 60949750 -252 Beer For Resale BEER CREDIT - $40.00 Invoice 1520103 3/28/2011 $3,362.80 Wells Fargo 10100 Total Cash Payment E 60949750 -252 Beer For Resale BEER CREDIT - $56.00 Invoice 1523244 4/6/2011 G 101 -23236 Westonka Animal Hospit #10 03 -11 LEGAL SVC WESTONKA ANIMAL Transaction Date 4/20/2011 Wells Fargo 10100 Total $8,453.30 Refer 33 JOHNS VARIETY AND PETS _ Cash Payment E 101 -41910 -220 Repair/Maint Supply Invoice 329057 4/8/2011 Transaction Date 4/20/2011 Refer _ 34 JOHNSON BROTHERS LIQUOR _ Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1031738 4/6/2011 Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1031740 4/6/2011 Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1036342 4/13/2011 Cash Payment E 609 -49750 -251 Liquor For Resale Invoice 1036344 4/13/2011 Transaction Date 4/20/2011 Refer 35 JOHNSON BROTHERS LIQUOR _ Cash Payment E 609 -49750 -253 Wine For Resale Invoice 1031739 4/6/2011 Cash Payment E 609 -49750 -253 Wine For Resale Invoice 1036343 4/13/2011 Transaction Date 4/20/2011 Refer 62 KENNEDYAND GRAVEN _ Cash Payment E 101 -41600 -300 Professional Srvs Invoice 042611 4111/2011 Cash Payment E 101 -41600 -300 Professional Srvs 2 FLOWER POTS -CITY HALL $64.13 Wells Fargo 10100 Total $64.13 LIQUOR $2,220.57 LIQUOR $248.24 LIQUOR $1,739.17 LIQUOR $792.80 Wells Fargo 10100 Total $5,000.78 WINE $923.35 WINE $3,362.80 Wells Fargo 10100 Total $4,286.15 MISC PLANNING /LEGAL SVC 03 -11 IKM RFP $38.50 03 -11 BRENSHELL LANDFORM DEVELOPMENT PLANNING SVC $322.00 Invoice 042611 4/11/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $360.50 Refer 63 KENNEDYAND GRAVEN Cash Payment E 101 -41600 -300 Professional Srvs 03 -11 EXECUTIVE LEGAL SERVICES Invoice 042611 4/1112011 Cash Payment E 101 -41600 -300 Professional Srvs 03 -11 ADMINISTRATIVE LEGAL SVC Invoice 042611 4/1112011 Cash Payment E 101 -41600 -318 Legal Parks 03 -11 PARK & REC LEGAL SVC Invoice 042611 4/11/2011 Cash Payment E 101 -41600 -316 Legal P & 1 03 -11 LEGAL SVC PLANNING & ZONING Invoice 042611 4/11/2011 Cash Payment G 101 -23236 Westonka Animal Hospit #10 03 -11 LEGAL SVC WESTONKA ANIMAL HOSPITAL ZONING Invoice 042611 4/11/2011 Project 14983 Cash Payment E 475 -46386 -300 Professional Srvs 03 -11 LEGAL SVC BECKEL AGREEMENT Invoice 042611 4/11/2011 -775- $531.69 $24.00 $265.20 $372.00 • • $36.00 • $42.00 CITY OF MOUND CITY OF MOUND Payments Current Period: April 2011 04/21/11 11:22 AM Page 8 Cash Payment G 101 -23234 PI10 -01 Mobile Home Park 03 -11 LEGAL SVC MOBILE HOME PARK $35.00 Invoice 042611 4/11/2011 Project P110 -1 Transaction Date 4/21/2011 Wells Fargo 10100 Total $1,305.89 Refer 36 LAWSON PRODUCTS, INC _ Cash Payment E 10143100 -221 Equipment Parts CRIMP FTG & SLOW BLOW FUSE $47.57 Invoice 0320762 4/1/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $47.57 Refer 37 LEAGUE MN CITIES INSURANCE T Cash Payment E 101-41110 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $22.40 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 101-41310 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $358.21 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 101 -41500 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $291.04 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 101-42110 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $8,104.44 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 10142400 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $291.04 • INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 10143100 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $4,298.49 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 101 -45200 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $1,499.99 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 22242260 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $3,268.64 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 28145210 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $291.04 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 60149400 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $1,164.17 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 60249450 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $4,298.49 INSTALLMENT 2011 Invoice 20087 4/3/2011 Cash Payment E 60949750 -151 Worker's Comp Insuranc WORKERS COMPENSATION 2ND $1,388.05 INSTALLMENT 2011 Invoice 20087 4/3/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $25,276.00 Refer 38 LEAGUE MN CITIES INSURANCE T _ Cash Payment E 101 -41110 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $1,804.84 •INSURANCE Invoice 36090 2ND INSTALLMENT 2011 4/3/2011 Cash Payment E 10141310 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $481.29 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 -776- CITY OF MOUND 04/21/11 11:22 AM /1 Page 9 Payments CITY OF MOUND Current Period: April 2011 Cash Payment E 101 -41500 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $649.74 INSURANCE 2ND.INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 -41600 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $120.32 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 -41910 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $264.71 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 -42110 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $3,874.39 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 -42115 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $72.20 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 -42400 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $625.68 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 -43100 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $3,970.65 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 101 - 45200 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $890.39 INSURANCE 2ND INSTALLMENT 2011 • Invoice 36090 4/3/2011 Cash Payment E 222 -42260 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $4,812.90 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 281 -45210 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $1,660.45 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 285 -46388 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $1,251.35 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 601 -49400 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $4,018.77 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 602 -49450 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $3,730.00 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Cash Payment E 609 -49750 -361 General Liability Ins GENERAL LIABILITY & PROPERTY $6,834.32 INSURANCE 2ND INSTALLMENT 2011 Invoice 36090 4/3/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $35,062.00 Refer 53 LEMOINE, MIKE _ Cash Payment R 281 -45210 -34725 Dock Permits DOCK KEY DEPOSIT REFUND VILLA SLIP $100.00 #15 2 KEYS Invoice 042611 4/18/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $100.00 Refer 54 LOCKGUARD • Cash Payment E 285 - 46388 -440 Other Contractual Servic ADAPTER KIT, CONNECTOR & WINDOWS $212.15 SOFTWARE- PARKING DECK Invoice 61345 4/7/2011 -777- CITY OF MOUND 04/21/11 11:22 AM I, Page 10 Payments •CITY OF MOUND Current Period: April 2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $212.15 Refer 39 LOFFLER COMPANIES, INCORPOR _ Cash Payment E 101 -41910 -202 Duplicating and copying COPIER OVERAGE CHARGE FOR 3 -14 -11 $96.13 THRU 4 -13 -11 BLACK & WHITE Invoice 1235419 4/11/2011 Cash Payment E 101 -41910 -202 Duplicating and copying COPIER OVERAGE CHARGE FOR 3 -14 -11 $21.32 THRU 4 -13-11 COLOR COPIES Invoice 1235419 4/11/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $117.45 Refer 40 LUBE TECH, INCORPORATED _ Cash Payment E 101 -43100 -212 Motor Fuels MOBIL GREASE, FLEET OIL, WINDSHIELD $2,635.53 WASH, ENDURANCE CONCENTRATE Invoice 1896124 4/15/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $2,635.53 Refer 41 MERTZ, CRAIG M, LAW OFFICE _ Cash Payment E 101 -41600 -304 Legal Fees PROSECUTION SERVICES MARCH 2011 $6,452.71 Invoice 042611 4/5/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $6,452.71 Refer 42 MINNEHAHA BUILDING MAINTENA _ Payment E 609 - 49750 -440 Other Contractual Servic WINDOW WASHING INSIDE & OUT 3 -14-11 $65.19 •Cash Invoice 921083221 4/3/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $65.19 Refer 45 MINNESOTA DEPT OF FINANCE Cash Payment G 101 -22805 Police Forfeiture Program G. JOHNSON FORFEITURE 10% OF $650.00 PROCEEDS Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $650.00 Refer 43 MINNESOTA DEPT PUBLIC SAFETY Cash Payment E 101 - 42110 -400 Repairs & Maintenance CJDN CONNECT CHARGE $630.00 Invoice MD027130011 3/28/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $630.00 Refer 44 MINNESOTA UNEMPLOYMENT INS Cash Payment E 609 -49750 -140 Unemployment Comp 1ST QUARTER 2011 UNEMPLOYMENT $23.89 BENEFITS PAID - SOURINTA Invoice 042611 3/31/2011 Cash Payment E 609 -49750 -140 Unemployment Comp 1 ST QUARTER 2011 UNEMPLOYMENT $925.91 BENEFITS PAID - CHEELEY Invoice 042611 3/31/2011 Cash Payment E 222 -42260 -140 Unemployment Comp 1ST QUARTER 2011 UNEMPLOYMENT $2,954.01 BENEFITS PAID -WEIST Invoice 042611 3/31/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $3,903.81 Refer 46 MINNESOTA VALLEY TESTING LA _ Cash Payment E 601 - 49400 -470 Water Samples WATER TESTING & MONTHLY CHLORINE $77.50 •REPORT Invoice 545225 4/18/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $77.50 Refer 29 MNSPECT -778- CITY OF MOUND 04/21 /11 11:22 AM Page 11 Payments CITY OF MOUND Current Period: April 2011 Cash Payment E 101 - 42400 -308 Building Inspection Fees INSPECTION FEES MARCH 2011 $6,177.84 Invoice 5218 4/1/2011 E 222 -42260 -124 Fire Pens Contrib Invoice 042611 Cash Payment R 101 -42000 -32220 Electrical Permit Fee ELECTRICAL PERMIT FEES MARCH 2011 - $210.00 Invoice 5218 4/1/2011 Transaction Date 4/20/2011 Cash Payment G 101 -20800 Due to Other Governments ELECTRICAL STATE SURCHARGE MARCH - $70.00 Cash Payment E 101 - 45200 -433 Dues and Subscriptions 2011 $145.00 Invoice 5218 4/1/2011 Transaction Date 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $5,897.84 Refer 47 MOORE, CARLTON Cash Payment E 602- 49450 -434 Conference & Training Invoice 042611 4/14/2011 Transaction Date 4/20/2011 Refer 49 mMOUND FIRE RELIEF ASSOCIATIO _ Cash Payment E 222 -42260 -124 Fire Pens Contrib Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Refer 14 MOUND MARKETPLACE LLC y Cash Payment E 60949750412 Building Rentals Invoice 042611 4/20/2011 Cash Payment E 609 - 49750 -412 Building Rentals REIMBURSE MILEAGE - HENNEPIN COUNTY $13.62 MTG- RIDGEDALE Project SA -2 Wells Fargo 10100 Total $13.62 04 -11 FIRE RELIEF $11,802.08 Wells Fargo 10100 Total $11,802.08 MAY 2011 COMMON AREA MTCE & $956.25 INSURANCE 2010 BUDGET RECONCILIATION COMMON $866.83 AREA MTCE. Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $1,823.08 Refer 48 MOUND, CITY OF _ Cash Payment E 609 -49750 -382 Water Utilities WATER & SEWER UTILITIES 3 -1 -11 TO 4-1 -11 $43.50 Invoice 042611 4/19/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $43.50 Refer 50 NATIONAL RECREATION PARKAS������ Cash Payment E 101 - 45200 -433 Dues and Subscriptions NRPA ANNUAL MEMBERSHIP $145.00 Invoice 042611 4/20/2011 PO 23150 Transaction Date 4/20/2011 Wells Fargo 10100 Total $145.00 Refer 51 NEOPOST ti Cash Payment E 101 - 41910 -400 Repairs & Maintenance Invoice 13427074 4/9/2011 Transaction Date 4/20/2011 Refer 52 NEXX GENERATION CONS7RUCTI RATE CHANGE UPDATE FOR POSTAL SCALE $277.88 Wells Fargo 10100 Total $277.88 Cash Payment G 101 -23230 2012 Villa Lane, #10 -06 Nexa REFUND ESCROW -2012 VILLA LANE PC 10- $387.49 06 Invoice 042611 4/8/2011 Transaction Date 4/20/2011 Refer 55 OFFICE DEPOT Cash Payment E 101 -41500 -210 Operating Supplies Invoice 557823558001 4/1/2011 PO 23541 Transaction Date 4/20/2011 Refer 56 OFFICE DEPOT Wells Fargo 10100 Total $387.49 FILE FOLDERS - ACCOUNTS PAYABLE $10.24 Wells Fargo 10100 Total $10.24 - 779 • • • CITY OF MOUND 04/21/11 11:22 AM Page 12 Payments CITY OF MOUND Current Period: April 2011 Cash Payment E 101 -41310 -200 Office Supplies 2 LASER CARTRIDGES- CITY MANAGER $132.55 Invoice 56075102001 4/12/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $132.55 Refer 58 OFFICE DEPOT Cash Payment E 101 -42110 -200 Office Supplies CATALOG ENVELOPES, 3 -PART RECEIPTS, $63.80 PRINTER RIBBONS Invoice 558194284001\ 4/6/2011 PO 23202 Transaction Date 4/20/2011 Wells Fargo 10100 Total $63.80 Refer 2 OFFICE DEPOT _ Cash Payment E 281 -45210 -200 Office Supplies 2 INK CARTRIDGES, DOCKS $36.32 Invoice 558417874001 4/8/2011 PO 23142 Cash Payment E 281 - 45210 -200 Office Supplies DESK FILES, TABS $10.83 Invoice 558418285001 4/7/2011 PO 23142 Transaction Date 4/20/2011 Wells Fargo 10100 Total $47.15 Refer 10 PAUSCHE, CATHERINE Cash Payment E 101 -41500 -331 Use of personal auto REIMBURSE MILEAGE JAN THRU APRIL $45.90 HEALTH CARE & POLICE OPTIONS MTGS Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $45.90 Refer 8 PAUSTIS AND SONS WINE COMPA Cash Payment E 609 -49750 -253 Wine For Resale WINE $724.63 Invoice 8300850 -IN 4/11/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT $15.00 Invoice 8300850 -IN 4/11/2011 Cash Payment E 609 -49750 -253 Wine For Resale WINE CREDIT - $95.00 Invoice 8300346 -CM 4/612011 Cash Payment E 609 -49750 -265 Freight FREIGHT CREDIT -$1.25 Invoice 8300346 -CM 4/6/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $643.38 Refer 14 PAUST/S AND SONS WINE COMPA _ Cash Payment E 609 -49750 -253 Wine For Resale WINE $522.00 Invoice 8301597 -IN 4/18/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT $8.75 Invoice 8301597 -IN 4/18/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $530.75 Refer 44 PHILLIPS WINE AND SPIRITS, INC _ Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $554.15 Invoice 2041444 4/6/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $229.45 Invoice 2054724 4/13/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $169.20 Invoice 2054720 4/13/2011 Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa MIX $41.95 •Invoice 2054721 4/13/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $994.75 Refer 45 PHILLIPS WINE AND SPIRITS, INC -780- CITY OF MOUND Payments CITY OF MOUND 04/21/11 11:22 AM Page 13 Current Period: April 2011 Cash Payment E 60949750 -253 Wine For Resale WINE $657.25 Invoice 2051445 4/6/2011 Cash Payment E 609 -49750 -253 Wine For Resale WINE CREDIT Invoice 3457021 4/7/2011 _ Cash Payment E 609 -49750 -253 Wine For Resale WINE Invoice 2054722 4/13/2011 WINE Cash Payment E 609 -49750 -253 Wine For Resale WINE Invoice 2054723 4/13/2011 _ Transaction Date 4/21/2011 Wells Fargo Refer 18 POMEROY, JAMIE _ -$3.66 $172.20 $164.00 10100 Total $989.79 Cash Payment R 281 -45210 -34725 Dock Permits DOCK KEY DEPOSIT REFUND VILLA #11 Invoice 042611 4/18/2011 LIQUOR Transaction Date 4/20/2011 Wells Fargo Refer 26 QUALITY WINE AND SPIRITS _ Cash Payment E 609 -49750 -253 Wine For Resale WINE Invoice 441372 -00 4/6/2011 Invoice 444314 -00 4/13/2011 Cash Payment E 609 -49750 -253 Wine For Resale WINE Invoice 444041 -00 4/13/2011 LIQUOR Transaction Date 4/20/2011 Wells Fargo Refer 27 QUALITY WINE AND SPIRITS _ $50.00 10100 Total $50.00 $223.69 $544.00 10100 Total $767.69 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $1,432.25 Invoice 444042 -00 4/13/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $325.95 Invoice 444314 -00 4/13/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $3,464.95 Invoice 441373 -00 4/6/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $5,223.15 Refer 20 R & S COLLISION SERVICES, INCO _ Cash Payment E 101 - 42110 -409 Other Equipment Repair PAINTING & BODYWORK REPAIRS - 2007 $4,308.78 DODGE DAKOTA #851 Invoice 0984 4/4/2011 PO 23200 Transaction Date 4/20/2011 Wells Fargo Refer 4 SCHAEFER RICHARDSON Cash Payment 10100 Total $4,308.78 G 101 -23240 PL 11 -04 COMMERCE PLAC REFUND BAY BREEZE CONCEPT APPLICATION & ESCROW COMMERCE PLACE PROJECT Invoice 042611 4/20/2011 Cash Payment R 101 -42000 -34114 Planning Commission REFUND BAY BREEZE CONCEPT APPLICATION & ESCROW COMMERCE PLACE PROJECT $750.00 $200.00 Invoice 042611 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $950.00 Refer 12 SELA ROOFING & REMODELING IN Cash Payment E 101 -45200 -525 Other Capital Improveme NEW ROOFING DEPOT BLDG - TIMBERLINE $12,275.00 SLATE Invoice 042611 4/6/2011 PO 23141 Transaction Date 4/20/2011 Wells Fargo Refer 28 STERNE ELECTRIC COMPANY _ _781_ 10100 Total $12,275.00 • • 0 - //I--- I, CITY OF MOUND • • CITY OF MOUND Payments 04/21/11 11:22 AM Page 14 Current Period: April 2011 Cash Payment E 101 - 41910 -400 Repairs & Maintenance REPLACE BALLAST HPS 150 WATT $342.33 Invoice 10743 4/8/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $342.33 Refer 35 STRE/CHER'S Cash Payment G 101 -13100 Due From Other Funds EXTRICATION BARRIER GLOVES $64.11 Invoice 1829780 4/1512011 Cash Payment E 601 -49400 -210 Operating Supplies REPLACEMENT BATTERY $63.02 Invoice 1826132 4/1/2011 Cash Payment G 101 -13100 Due From Other Funds EXTRICATION BARRIER GLOVES, $58.77 Invoice 1824159 3/25/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $185.90 Refer 46 SUN PATRIOIT NEWSPAPER Cash Payment E 609 -49750 -351 Legal Notices Publishing LIQUOR FINANCIAL STATEMENT $143.33 Invoice 1044563 4/9/2011 Cash Payment E 401 -43101 -351 Legal Notices Publishing STREET, UTILITY & RETAINING WALL $197.45 IMPROVEMENTS BID Invoice 1044565 4/9/2011 Cash Payment E 281 -45210 -351 Legal Notices Publishing LAKER AD, VILLA SLIPS -4 /14/11 $42.59 Invoice 1040460 4114/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $383.37 Refer 47 THORPE DISTRIBUTING COMPAN _ Cash Payment E 609 - 49750 -252 Beer For Resale BEER $23.30 Invoice 634790 4/12/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $35.70 Invoice 635768 4/19/2011 Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa MIX & WATER $27.00 Invoice 634790 4/12/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $1,395.80 Invoice 634792 4/12/2011 Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa MIX & WATER $18.90 Invoice 635768 4/19/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $2,854.05 Invoice 635691 4/19/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $4,354.75 Refer 31 THYSSEN -KRUPP ELEVATOR COR Cash Payment E 101 - 41910 -401 Building Repairs REPLACE ELEVATOR PHONE W /ADA $600.00 COMPLIANT CITY HALL Invoice 042611 4/18/2011 PO 23149 Transaction Date 4/20/2011 Wells Fargo 10100 Total $600.00 Refer 61 TOWN & COUNTRY FENCE _ Cash Payment E 101 -45200 -221 Equipment Parts REPAIR SWENSON BALLFIELD BACKSTOP $2,295.00 Invoice 919206 4/11/2011 PO 23120 Transaction Date 4/2112011 Wells Fargo 10100 Total $2,295.00 Refer 21 TRUE VALUE, MOUND _ Cash Payment E 101 -42110 -210 Operating Supplies SOCKET, MAGNET $14.94 Invoice 080806 3/15/2011 Cash Payment E 101 -42110 -210 Operating Supplies OPERATINr SUPPLIES, SOCKET $7.47 Invoice 080806 3115/2011 -782- CITY OF MOUND 04/21/11 11:22 AM /, Page 15 Payments • CITY OF MOUND Current Period: April 2011 Cash Payment E 101 -42110 -210 Operating Supplies OPERATING SUPPLIES, PLUGS $9.92 Invoice 080838 3/15/2011 Cash Payment E 101 -42110 -210 Operating Supplies LIQUID CAR WASH, HAND WIPES $21.89 Invoice 081084 3/25/2011 Cash Payment E 101 -42110 -210 Operating Supplies SCREWS, NUTS, BOLTS $2.35 Invoice 081142 3/28/2011 Cash Payment E 101 -42110 -210 Operating Supplies VELCRO, SCREWS,NUTS, BOLTS, $9.81 Invoice 081215 3/30/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $66.38 Refer 22 TRUE VALUE, MOUND Cash Payment E 609 -49750 -210 Operating Supplies DRAIN OPENER, BOWL CLEANER $12.58 Invoice 081587 4/11/2011 Cash Payment E 101 -43100 -221 Equipment Parts SCREWS, NUTS, BOLTS $2.99 Invoice 080615 3/7/2011 Cash Payment E 601 -49400 -210 Operating Supplies 9V ALK BATTERY, COND DISPENSER $11.52 Invoice 081576 4/11/2011 Cash Payment E 602 -49450 -210 Operating Supplies KITCHEN BAGS $10.68 Invoice 081404 4/5/2011 Project SA -2 Cash Payment E 602 -49450 -220 Repair /Maint Supply EPDXY, POL GAS CYLINDER $14.50 Invoice 081412 4/6/2011 Cash Payment E 602 -49450 -220 Repair/Maint Supply ELECT SOLDER, SHRINK TUBING, $53.38 • SOLDERING GUN KIT Invoice 081192 3/29/2011 Transaction Date 4/21/2011 Refer 23 TRUE VALUE, MOUND � Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081621 4/12/2011 Cash Payment E 101 -45200 -220 Repair /Maint Supply Invoice 081464 417/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081514 4/8/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081362 4/4/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081353 414/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 0815951 4/11/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081594 4/11/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081586 4/11/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081469 4/7/2011 Cash Payment E 101 -45200 -220 Repair/Maint Supply Invoice 081652 4/13/2011 Wells Fargo 10100 Total $105.65 SCREWS, NUTS, BOLTS GLOSSY LATEX ENAMEL,SCREWS, NUTS, BOLTS SCREWS, NUTS, BOLTS BIT, WHITE GLOSS ENAMEL -PARKS SHELF BRACKET, PUMPHOUSE BATHROOM CREDIT RETURN U -BOLTS U- BOLTS, TUBING CREDIT SURGE PROTECTOR RETURN SURGE PROTECTORS, LIQ ANT BAIT GE LIGHT BULBS Transaction Date 4/21/2011 Wells Fargo 10100 Refer 48 V/NOCOPIA, INCORPORATED _ -783- Total $4.24 $42.51 $22.43 $12.06 $39.24 - $10.47 $18.51 - $25.63 $33.10 $9.49 $145.48 • • • CITY OF MOUND 04/21/11 11:22 AM Page 16 Payments CITY OF MOUND Current Period: April 2011 Cash Payment E 609 -49750 -253 Wine For Resale WINE $840.00 Invoice 0037683 -IN 4/6/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT $18.00 Invoice 0037683 -IN 4/6/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $858.00 Refer 49 WATER CONSERVATION SERVICE Cash Payment Invoice 2464 Transaction Date E 601 - 49400 -440 Other Contractual Servic LOCATE MARCH 21 @ 2074 GRANDVIEW $235.70 4/7/2011 4/21/2011 Wells Fargo 10100 Total $235.70 Refer 50 WESTSIDE WHOLESALE TIRE AND Cash Payment E 601 -49400 -221 Equipment Parts 2 TIRES BALANCE, MOUNT, FLOAT -DUMP $1,023.75 TRUCK Invoice 654939 2/16/2011 Transaction Date 4/21/2011 Wells Fargo Refer 51 �WESTSIDE WHOLESALE TIRE AND 10100 Total $1,023.75 Cash Payment E 602 -49450 -221 Equipment Parts 2 TIRES MOUNT 2004 STERLING Invoice 654925 2/16/2011 E 609 -49750 -253 Wine For Resale Transaction Date 4/21/2011 Wells Fargo Refer 52� WINE COMPANY _ Cash Payment E 609 -49750 -253 Wine For Resale WINE Invoice 267234 -00 4/14/2011 Wells Fargo 10100 Cash Payment E 609 -49750 -253 Wine For Resale WINE Invoice 266663 -00 417/2011 Cash Payment E 609 -49750 -265 Freight FREIGHT Invoice 266663 -00 4/7/2011 BEER Cash Payment E 609 -49750 -265 Freight FREIGHT Invoice 267234 -00 4/14/2011 Transaction Date 4/21/2011 Wells Fargo Refer 53 WINE MERCHANTS BEER $872.42 10100 Total $872.42 $262.00 $324.00 $8.40 $6.30 10100 Total $600.70 Cash Payment E 609 -49750 -253 Wine For Resale WINE $748.00 Invoice 357480 4/6/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $748.00 Refer 54 W/RTZ BEVERAGE MN BEERt Cash Payment E 609 -49750 -252 Beer For Resale BEER $31.00 Invoice 734628 4/13/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $1,010.25 Invoice 733579 4/11/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $27.20 Invoice 734627 4/13/2011 Cash Payment E 609 -49750 -252 Beer For Resale BEER $5,788.95 Invoice 734626 4/13/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $6,857.40 Refer 19 WIRTZ BEVERAGE MN BEER _ Cash Payment E 609 -49750 -252 Beer For Resale BEER $878.85 Invoice 737229 4/19/2011 Cash Payment E 60949750 -252 Beer For Resale BEER $43.00 Invoice 737230 4/19/2011 -784- CITY OF MOUND 04/21/11 11:22 AM Page 17 Payments CITY OF MOUND Current Period: April 2011 Refer 33 ZEE MEDICAL SERVICE Cash Payment E 101 -45200 -220 Repair/Maint Supply MEDICAL SUPPLIES — ANTISEPTIC SPRAY, $42.88 GAUZE PADS, ROLLS, ZEE STRIPS Cash Payment E 609 -49750 -252 Beer For Resale BEER $144.00 Invoice 737923 4/20/2011 10100 Wells Fargo Transaction Date 4/21/2011 Wells Fargo 10100 Total $1,065.85 Refer 58 WIRTZ BEVERAGE MN WINE SPIRI _ $1,463.50 Cash Payment E 609 -49750 -253 Wine For Resale WINE $725.20 Invoice 557801 4/14/2011 601 WATER FUND $12,577.22 Cash Payment E 609 -49750 -253 Wine For Resale WINE $319.75 Invoice 554058 4/7/2011 $344,837.19 Transaction Date 4/21/2011 Wells Fargo 10100 Total $1,044.95 Refer 60 WIRTZ BEVERAGE MN WINE SP/RI _ Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $413.79 Invoice 557799 4/14/2011 Cash Payment E 609 -49750 -251 Liquor For Resale LIQUOR $870.78 Invoice 554324 4/7/2011 Cash Payment E 609 -49750 -254 Soft Drinks/Mix For Resa MIX $53.90 Invoice 557800 4/14/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $1,338.47 Refer 33 ZEE MEDICAL SERVICE Cash Payment E 101 -45200 -220 Repair/Maint Supply MEDICAL SUPPLIES — ANTISEPTIC SPRAY, $42.88 GAUZE PADS, ROLLS, ZEE STRIPS Invoice 54085518 4/15/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $42.88 Fund Summary 10100 Wells Fargo 101 GENERAL FUND $77,861.85 222 AREA FIRE SERVICES $23,497.45 281 COMMONS DOCKS FUND $2,281.23 285 MOUND HRA $1,463.50 401 GENERAL CAPITAL PROJECTS $119,013.20 402 MUNICIPAL STAID ST CONSTUCT $4,179.00 475 TIF 1 -3 Mound Harbor Rensissan $42.00 601 WATER FUND $12,577.22 602 SEWER FUND $30,520.45 609 MUNICIPAL LIQUOR FUND $70,353.29 675 STORM WATER UTILITY FUND $3,048.00 $344,837.19 Pre- Written Checks $0.00 Checks to be Generated by the Compute $344,837.19 Total $344,837.19 -785- • 0 0 CITY OF MOUND 04/21/11 9:45 AM Page 1 Payments CITY OF MOUND Current Period: April 2011 Batch Name 042611 CITY2 User Dollar Amt $46,073.64 Payments Computer Dollar Amt $46,073.64 $0.00 In Balance Refer 78 ABDO EICK AND MEYERS, LLP _ Cash Payment E 101 -41500 -301 Auditing and Acct'g Servi 2010 AUDIT $3,947.09 Invoice 276479 3/31/2011 Cash Payment E 222 -42260 -301 Auditing and Acct'g Servi 2010 AUDIT $2,040.25 Invoice 276479 3/31/2011 Cash Payment E 281 -45210 -301 Auditing and Acct'g Servi 2010 AUDIT $722.46 Invoice 276479 3/31/2011 Cash Payment E 401 -43160 -301 Auditing and Acct'g Servi 2010 AUDIT $874.69 Invoice 276479 3/31/2011 Cash Payment E 601 -49400 -301 Auditing and Acct'g Servi 2010 AUDIT $1,830.99 Invoice 276479 3/31/2011 Cash Payment E 602 -49450 -301 Auditing and Acct'g Servi 2010 AUDIT $1,830.99 Invoice 276479 3/31/2011 Cash Payment E 609 -49750 -301 Auditing and Acct'g Servi 2010 AUDIT $2,787.29 Invoice 276479 3/31/2011 Cash Payment E 670 -49500 -301 Auditing and Acct'g Servi 2010 AUDIT $443.10 Invoice 276479 3/31/2011 •Cash Payment E 675 -49425 -301 Auditing and Acct'g Servi 2010 AUDIT $523.14 Invoice 276479 3/31/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $15,000.00 Refer 17 ANCOM TECHNICAL CENTER _ Cash Payment E 222 -42260 -325 Pagers -Fire Dept. MINITOR V STANDARD CHARGER, $211.51 BATTERY, BELT CLIP Invoice 21421 3/25/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $211.51 Refer 6 BERRY COFFEE COMPANY _ Cash Payment E 222 -42260 -210 Operating Supplies COFFEE FIRE DEPT $52.00 Invoice 935795 4/20/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $52.00 Refer 9 CARQUEST AUTO PARTS (FIRE) _ Cash Payment E 222 - 42260 -409 Other Equipment Repair PRIMARY WIRE, FUEL STABILIZER, AUX $74.23 POWER SOURCE Invoice 6974 - 150138 3/5/2011 Cash Payment E 222 - 42260 -409 Other Equipment Repair BATTERY ISOLATOR 95 AMP $42.15 Invoice 6974 - 150471 3/10/2011 Cash Payment E 222 - 42260 -409 Other Equipment Repair CAB SW TO START 18, 24, TERMINAL PAK $11.24 Invoice 6974 - 150642 3/12/2011 Cash Payment E 222 - 42260 -409 Other Equipment Repair COPPER PLUS SPARK PLUG $7.98 Invoice 6974 - 150657 3/12/2011 Cash Payment E222-42260-210 Operating Supplies RUBBING COMP, SCRAPER, $40.96 COMPOUND /POLISH PAD 6974 - 151153 3/19/2011 •Invoice Cash Payment E 222 - 42260 -409 Other Equipment Repair 5W -30 MOTOR OIL 50T $57.03 Invoice 6974 - 151161 3/19/2011 Transaction Date 4/20/2011 Wells F.-- 10100 Total $233.59 -786- CITY OF MOUND Payments CITY OF MOUND Current Period: April 2011 Refer 11 DANA HOAGLAND PLUMBING, INC. Cash Payment E 222 - 42260 -401 Building Repairs SERVICE CALL, REPLACED RUBBER WASHER ON COMMERCIAL BASKET STRAINER, REPLACE RUBBER GASKET Invoice 2011 -1144 3/1/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total Refer 75 EMERYS TREE SERVICE, INCORP _ Cash Payment E 101 -45200 -533 Tree Removal 3 -25 -11 REMOVED ELM ON BANK Invoice 16483 4/15/2011 Cash Payment E 101 -45200 -533 Tree Removal 4 -5 -11 REMOVE ASK, CUT OAK ON VILLA LANE Invoice 16483 4115/2011 Cash Payment E 101 -45200 -533 Tree Removal 4 -12 -11 REMOVE BASSWOOD AT 5125 HANOVER ROAD Invoice 16483 4/15/2011 Transaction Date 4/2112011 Wells Fargo 10100 Total Refer 13 EXCELSIOR FIRE DISTRICT Cash Payment E 222 -42260 -219 Safety supplies SINAGE FOR SAFETY TRAILERS Invoice 041411 4/1412011 Transaction Date 4/20/2011 Wells Fargo 10100 Total Refer 38 FIRE ENGINEERING PUBLICATION Cash Payment E222-42260-433 Dues and Subscriptions FIRE ENGINEERING MAGAZINE SUBSCRIPTION Invoice 051511 5/15/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total Refer 19 FIRE SAFETY USA, INCORPORATE _ Cash Payment E 222 -42260 -210 Operating Supplies UNIVERSAL NFPA BRACKET ASSY WITH STRAP Invoice 43797 3/31/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total Refer 39 FIREHOUSE MAGAZINE _ Cash Payment E 222 - 42260 -433 Dues and Subscriptions FIREHOUSE MAGAZINE SUBSCRIPTION 2011 Invoice 031111 3/11/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total Refer 30 FLAIG, KEVIN M. _ Cash Payment E 222 - 42260 -434 Conference & Training MEAL & LODGING REIMB FOR K. FLAIG FIRE SCHOOL IN ROCHESTER MN 4 -1 -11 TO 4 -3- 11 Invoice 040411 414/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total Refer 22 G & K SERVICES Cash Payment E 22242260 -460 Janitorial Services FIRE DEPT MATS 4 -18 -11 Invoice 1006121479 4/18/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Refer 64 G & K SERVICES Cash Payment E 101 -43100 -218 Clothing and Uniforms 04 -11 -11 UNIFORMS & MATS Invoice 1006110566 4/11/2011 -787- Total 04/21/11 9:45 AM Page 2 • $133.00 $133.00 $360.70 $659.96 $384.75 $1,405.41 $84.62 $84.62 $21.00 S $21.00 $370.00 $370.00 $29.95 $29.95 $26.62 $26.62 $79.82 $79.82 $25.12 C11 CITY OF MOUND 04/21/11 9:45 AM Page 3 Payments • CITY OF MOUND Current Period: April 2011 Cash Payment E 601 -49400 -218 Clothing and Uniforms 04 -11 -11 UNIFORMS & MATS $23.82 Invoice 1006110566 4/11/2011 Cash Payment E 602 -49450 -218 Clothing and Uniforms 04 -11 -11 UNIFORMS & MATS $27.79 Invoice 1006110566 4/11/2011 Cash Payment E 602 -49450 -230 Shop Materials 04 -11 -11 UNIFORMS & MATS $159.42 Invoice 1006110566 4/11/2011 Project SA -2 Transaction Date 4/21/2011 Wells Fargo 10100 Total $236.15 Refer 65 G & K SERVICES _ Cash Payment E 101 -45200 -218 Clothing and Uniforms 04 -18 -11 UNIFORMS, MATS & TOWELS $27.68 Invoice 1006121481 4/18/2011 Cash Payment E 101 -45200 -210 Operating Supplies 04 -18 -11 UNIFORMS, MATS & TOWELS $159.15 Invoice 1006121481 4/18/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $186.83 Refer 67 G & K SERVICES _ Cash Payment E 101 -45200 -218 Clothing and Uniforms 04 -11 -11 UNIFORMS & MATS $24.56 Invoice 1006110568 4/11/2011 Cash Payment E 101 -45200 -210 Operating Supplies 04 -11 -11 UNIFORMS & MATS $69.84 Invoice 1006110568 4/11/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $94.40 68 G & K SERVICES _ •Refer Cash Payment E 101 - 41910 -460 Janitorial Services 4 -18 -11 CITY HALL MATS $143.48 Invoice 1006121478 4/18/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $143.48 Refer 69 G & K SERVICES _ Cash Payment E 609 - 49750 -460 Janitorial Services 04 -11 -11 LIQUOR STORE MATS $55.33 Invoice 1006110562 4/11/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $55.33 Refer 70 G & K SERVICES _ Cash Payment E 101 -43100 -218 Clothing and Uniforms 04 -04 -11 PUBLIC WORKS UNIFORMS & MATS $22.02 Invoice 1006899671 4/4/2011 Cash Payment E601-49400-218 Clothing and Uniforms 04 -04 -11 PUBLIC WORKS UNIFORMS & MATS $23.82 Invoice 1006899671 4/4/2011 Cash Payment E 602 -49450 -218 Clothing and Uniforms 04 -04 -11 PUBLIC WORKS UNIFORMS & MATS $27.79 Invoice 1006899671 4/4/2011 Cash Payment E 602 -49450 -230 Shop Materials 04 -04 -11 PUBLIC WORKS UNIFORMS & MATS $243.94 Invoice 1006899671 4/4/2011 Project SA -2 Transaction Date 4/21/2011 Wells Fargo 10100 Total $317.57 Refer 71 G & K SERVICES _ Cash Payment E 101 -45200 -218 Clothing and Uniforms 04 -04 -11 PARKS UNIFORMS & MATS $28.93 Invoice 1006899675 4/4/2011 Cash Payment E 101 -45200 -210 Operating Supplies 04 -04 -11 PARKS UNIFORMS & MATS $74.80 Invoice 1006899675 4/4/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $103.73 •Refer 72 G & K SERVICES _ Cash Payment E 101 - 42110 -460 Janitorial Services 02 -21 -11 POLICE MATS $89.73 Invoice 1006833697 2/21/2011 -788- CITY OF MOUND CITY OF MOUND Payments Current Period: April 2011 04/21/119:45 AM Page 4 Transaction Date 4/21/2011 Wells Fargo 10100 Total $89.73 Refer 73 G & K SERVICES _ Cash Payment E 222 - 42260 -460 Janitorial Services 02 -21 -11 MATS FIRE DEPT $79.82 Invoice 1006833696 2/21/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $79.82 Refer 74 GARYS DIESEL SERVICE _ Cash Payment E 602 -49450 -221 Equipment Parts SPLIT AIR TANK #304 $278.21 Invoice 13247 4/1/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $278.21 Refer 34 GUSTAFSON, BRUCE _ Cash Payment E 222 - 42260 -434 Conference & Training ROCHESTER STATE FIRE SCHOOL REIMS. $120.72 B. GUSTAFSON Invoice 040711 4/7/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $120.72 Refer 21 HENNEPIN COUNTY INFORMATIO _ Cash Payment E 222 - 42260 -418 Other Rentals FIRE RADIO LEASE $800.16 Invoice 110238170 2/28/2011 Cash Payment E 222 - 42260 -418 Other Rentals FIRE RADIO LEASE $800.16 Invoice 110338038 3/31/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $1,600.32 Refer 41 HENNEPIN COUNTY SHERIFF'S AC _ Cash Payment E 101 - 41600 -450 Board of Prisoners MARCH 2011 PER DIEM AND PROCESSING $756.81 FEE Invoice 3559 3/31/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $756.81 Refer 32 HENTGES, MATTHEW _ Cash Payment E 222 - 42260-434 Conference & Training ROCHESTER STATE SCHOOL REIMB. M. $14.62 HENTGES Invoice 040611 4/6/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $14.62 Refer 7 HOME DEPOT CREDIT (FIRE) _ Cash Payment E 222 -42260 -210 Operating Supplies LUMBER, FLOORING $39.94 Invoice 9050823 3/27/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $39.94 Refer 16 IKON FINANCIAL SERVICES _ Cash Payment E 222 -42260 -202 Duplicating and copying 4 -27 -11 TO 7 -26 -11 COPIER RENTAL FIRE $106.61 DEPT Invoice 84517481 411/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total $106.61 Refer 77 INFRA TECH _ Cash Payment E 602 -49450 -220 Repair/Maint Supply LEADER HOSE AND TYGER TAIL ASSEMBLY $230.91 Invoice 100160 4/6/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Total $230.91 Refer 80 LEAGUE MN CITIES INSURANCE T 0 � 01 01 CITY OF MOUND 04/21/11 9:45 AM Page 5 Payments • CITY OF MOUND Current Period: April 2011 Cash Payment E 101 -43100 -361 General Liability Ins Invoice 11075573 4/17/2011 Transaction Date 4/21/2011 Refer 24 MNSPECT NANCY EILOLA CLAIM FENCE HIT BY PLOW 12 -31 -10 Wells Fargo 10100 Total Cash Payment E 222 -42260 -308 Building Inspection Fees FIRE INPECTIONS FEB 2011 Invoice 5217 4/1/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Total Refer 25 MYERS, TONY _ Cash Payment E 222 - 42260 -434 Conference & Training REMAINING DUE TO T. MYERS FOR MN IAAI ANNUAL CONFERENCE IN ST CLOUD 3 -23- 11 TO 3 -25 -11 Invoice 032611 3/26/2011 Transaction Date 4/20/2011 Refer 76 NEWMAN SIGNS Cash Payment E 101 -43100 -226 Sign Repair Materials Invoice TI -0233238 Transaction Date 4121/2011 Refer 3 NORTHERN TOOL AND EQUIPMEN Invoice 042011 4/20/2011 $1,000.00 $1,000.00 $195.00 $195.00 $6.20 Wells Fargo 10100 Total Cash Payment E zzz- 4zz60 -z1s 5atety suppues • Invoice 86403 4/18/2011 LEATHER WORK GLOVES Cash Payment E222-42260-210 Operating Supplies - $53.64 Invoice 5236 3/31/2011 1500# JACK, BALL HITCH BALL MOUNT, Cash Payment E222-42260-210 Operating Supplies Invoice 4551 3/24/2011 PHYSICAL, TESTING FOR ALEX MOORE Transaction Date 4/20/2011 Wells Fargo 10100 Total Refer 15 NORTHWORKS OCCUPATIONAL H _ POUCH, LAMINATING, PAPER, ENVELOPES Cash Payment E 222 -42260 -305 Medical Services $85.95 Invoice 00007308 3/31/2011 $30.75 Transaction Date 4/20/2011 Refer 23 OFFICE DEPOT _ RESOURCES UNIT #41 Cash Payment E 222 - 42260 -200 Office Supplies $214.42 Invoice 557088338001 3/28/2011 Transaction Date 4/20/2011 $171.82 Refer 1 PEDERSON, GREG _ -790- Cash Payment E 222 -42260 -219 Safety supplies Invoice 042011 4/20/2011 Cash Payment E 222 -42260 -210 Operating Supplies Invoice 042011 4/20/2011 Cash Payment E 222 -42260 -210 Operating Supplies • Invoice 042011 4/20/2011 Cash Payment E 222 -42260 -210 Operating Supplies Invoice 042011 4/20/2011 $1,000.00 $1,000.00 $195.00 $195.00 $6.20 Wells Fargo 10100 Total $6.20 ORDER BY DAN EC FILM BLACK 19" X 50 YDS $904.96 Wells Fargo 10100 Total $904.96 LEATHER WORK GLOVES $25.98 RETURN 1500# JACK PURCHASE WHEEL - $53.64 CASTER 1500# JACK, BALL HITCH BALL MOUNT, $282.05 HITCH PINS Wells Fargo 10100 Total $254.39 PHYSICAL, TESTING FOR ALEX MOORE $399.00 Wells Fargo 10100 Total $399.00 POUCH, LAMINATING, PAPER, ENVELOPES $85.95 Wells Fargo 10100 Total $85.95 SUPPLIES AND EQUIPMENT FOR COMMAND $30.75 RESOURCES UNIT #41 SUPPLIES AND EQUIPMENT FOR COMMAND $32.18 RESOURCES UNIT #41 SUPPLIES AND EQUIPMENT FOR COMMAND $214.42 RESOURCES UNIT #41 SUPPLIES AND EQUIPMENT FOR COMMAND $171.82 RESOURCES UNIT #41 -790- --A CITY OF MOUND CITY OF MOUND Payments Current Period: April 2011 Transaction Date 4/20/2011 Wells Fargo 10100 Refer 79 SHI INTERNATIONAL CORPORATI _ Cash Payment E 281 -45210 -205 Computer Hardware /Soft OFFICE PRO PLUS 2010 Invoice 800266458 4/8/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Refer 37 SPRINT WIRELESS (FIRE) _ Cash Payment E 222 -42260 -321 Telephone & Cells 3 -13 -11 TO 4 -12 -11 CELL SERVICE Invoice 617320297 -031 4/16/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Refer 5 SUNBURST CHEMICALS, INC. _ Cash Payment E 222 - 42260 -460 Janitorial Services SOAP, DET FORCE Invoice 0272643 -IN 4/18/2011 Transaction Date 4/20/2011 Wells Fargo 10100 Refer 42 TRUE VALUE, MOUND _ Cash Payment E 222 -42260 -210 Operating Supplies SCREWS NUTS BOLTS WASHERS Invoice 080488 3/2/2011 Cash Payment E 22242260 -210 Operating Supplies U -BOLT, CORNER IRON, SCREWS NUT BOLTS WASHERS Invoice 080749 3/12/2011 Cash Payment E 222-42260 -210 Operating Supplies MP SEL ROLL REFILL, FOAM BRUSHES, PAINT TRAY Invoice 080756 3/13/2011 Cash Payment E 222-42260 -210 Operating Supplies FUEL STABILIZER, GOO OFF REMOVER Invoice 080943 3/19/2011 Cash Payment E 222-42260-409 Other Equipment Repair GOO OFF REMOVER Invoice 081025 3/23/2011 Cash Payment E 222-42260 -210 Operating Supplies SCREWS, BOLTS, NUTS, WASHERS Invoice 081170 3/28/2011 Cash Payment E 222-42260 -210 Operating Supplies WALLPAPER SEAM ROLLER, RUBBING ALCOHOL Invoice 081204 3/29/2011 Transaction Date 4/21/2011 Wells Fargo 10100 Refer 55 XCEL ENERGY _ Cash Payment E 101 -42115 -381 Electric Utilities Invoice 366937786 4/8/2011 Transaction Date 4/21/2011 Refer 56 XCEL ENERGY Cash Payment E 101 -41910 -381 Electric Utilities Invoice 366110793 4/4/2011 Transaction Date 4/21/2011 Refer 57 XCEL ENERGY Cash Payment E 101 -43100 -381 Electric Utilities Invoice 367260039 4/11/2011 Cash Payment E 101 -43100 -381 Electric Utilities Invoice 367260600 4/11/2011 SIREN ELECTRICITY 3-8 -11 TO 4 -7 -11 Wells Fargo 10100 04/21/11 9:45 AM Page 6 Total $449.17 $344.14 Total $344.14 $135.92 Total $135.92 $160.28 Total $160.28 $51.46 S $12.16 $10.62 $53.39 $9.07 $2.33 $7.57 Total $146.60 $26.35 Total $26.35 CITY HALL ELECTRICITY 3 -3 -11 TO 4 -2 -11 Wells Fargo 10100 Total CITY HALL AND 5510 SHORELINE DR UNITY LIGHTS 2 -27 -11 TO 3 -28 -11 CITY HALL AND 5510 SHORELINE DR UNITY LIGHTS 2 -27 -11 TO 3 -28 -11 -791- $5,105.79 $5,105.79 $28.33 $244.35 40 1 01 61 16 CITY OF MOUND Transaction Date 4/21/2011 Refer 59 XCEL ENERGY Cash Payment E 101 -45200 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 101 -45200 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 602 -49450 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 101 -43100 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 601 -49400 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 602 -49450 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 609 -49750 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 285 -46388 -381 Electric Utilities Invoice 367655011 4/13/2011 •Cash Payment E 101 -42110 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 222 -42260 -381 Electric Utilities Invoice 367655011 4/13/2011 Cash Payment E 101 -41910 -381 Electric Utilities Invoice 367655011 4/13/2011 Transaction Date 4/21/2011 • CITY OF MOUND Payments Current Period: April 2011 04/21/11 9:45 AM Page 7 Wells Fargo 10100 Total $272.68 PARKS 2 -28 -11 TO 3 -28 -11 ACCOUNT $148.10 #516002837 -1 DEPOT 2 -28 -11 TO 3 -28 -11 ACCOUNT $61.95 #516002837 -1 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $2,812.70 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $651.74 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $3,465.98 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $452.07 Project SA -2 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837-1 $1,175.61 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $2,134.79 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837-1 $1,413.44 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $1,413.44 2 -28 -11 TO 3 -28 -11 ACCOUNT #516002837 -1 $754.69 Wells Fargo 10100 Total $14,484.51 -792- CITY OF MOUND Payments CITY OF MOUND Current Period: April 2011 Fund Summary Pre - Written Checks $0.00 Checks to be Generated by the Compute $46,073.64 Total $46,073.64 -793- 04/21/11 9:45 AM Page 8 • e • 10100 Wells Fargo 101 GENERAL FUND $17,114.32 222 AREA FIRE SERVICES $8,490.34 281 COMMONS DOCKS FUND $1,066.60 285 MOUND HRA $2,134.79 401 GENERAL CAPITAL PROJECTS $874.69 601 WATER FUND $5,344.61 602 SEWER FUND $6,063.82 609 MUNICIPAL LIQUOR FUND $4,018.23 670 RECYCLING FUND $443.10 675 STORM WATER UTILITY FUND $523.14 $46,073.64 Pre - Written Checks $0.00 Checks to be Generated by the Compute $46,073.64 Total $46,073.64 -793- 04/21/11 9:45 AM Page 8 • e • 5341 Maywood Road Mound, MN 55364 (952) 472 -0604 • EXECUTIVE SUMMARY TO: Planning Commission FROM: Sarah Smith, Community Development Director DATE: April 1, 2011 SUBJECT: Expansion Permit Application — Upper floor house addition (sunroom) within existing footprint OWNER: Shaun Tancheff PLANNING CASE NUMBER: 11 -02 LOCATION: 5174 Tuxedo Boulevard ZONING: R -1A Single Family Residential SUMMARY At its April 5, 2011 meeting, the Planning Commission reviewed an expansion permit application from Shaun Tancheff related to the property at 5174 Tuxedo Boulevard for a • proposed "sunroom enclosure" to be constructed over an existing 2 "d floor flat deck. Dean Umbehocker was present at the April 5, 2011 Planning Commission meeting and served as the applicant's designee. The requested expansion permit application is outlined as follows: Reguired Existing /Requested Expansion Permit Setback Lakeside 50 ft 43(+/-) PROJECT DETAILS. Please refer to Planning Report No. 11 -02 which provides an overview of the project and includes supporting documents related to the request. PLANNING COMMISSION MEETING OVERVIEW. In general, the Planning Commission was favorable to the request as the setback(s) for the enclosed sunroom are within the same footprint. Discussion also took place about gutters, eaves and where the construction materials would be stored. Refer to draft 4/5 Planning Commission meeting minute excerpts. RECOMMENDATION The Planning Commission unanimously voted to recommend approval of the expansion permit request as submitted and as recommended by Staff for an upper floor sunroom to be constructed over the existing structure at 5174 Tuxedo Boulevard subject to • conditions. A draft resolution based on the Planning Commission's recommendation has been included. -794- ADDITIONAL INFORMATION • • City policy requires that abutting property owners are notified by mailed notice. This activity was undertaken on April 22, 2010. • The applicant has confirmed that the eaves from the structure on all sides are within code requirements and do not extend more than two (2) feet into setbacks. He also indicated that the house does not include gutters and that construction materials for the proposed sunroom will be stored in the driveway. • It is important to mention that weight restrictions on local streets went on in the City of Mound on March 15, 2011. Therefore, the applicant is advised to coordinate construction activities in cooperation with the Public Works Superintendent or Supervisor related to same. 0 0 -795- RESOLUTION # 11- RESOLUTION APPROVING EXPANSION PERMIT FOR PROPERTY AT 5174 TUXEDO BOULEVARD P & Z CASE 11 -02 WHEREAS, the applicant, Shaun Tancheff, submitted an application and is requesting expansion permit approval for a proposed upper floor sunroom enclosure to be constructed over an existing 2nd floor flat deck. The requested expansion permit application is outlined as follows: Reguired Existing/Reguested Expansion Permit Setback Lakeside 50 ft 43 ft ( + / -) and; WHEREAS, the subject property, which is zoned R -1 A, fronts Tuxedo Boulevard on the south side and Lake Minnetonka on the north side and includes a 2 -story single - family • dwelling (with tuckunder garage). The existing house setback, on the lakeside, is approximately 43 FT ( + / -) from the 929.4 ordinary high water mark for Lake Minnetonka. The existing second floor flat roof deck is to be replaced with a glass and aluminum addition (sunroom) over the existing structure but will not extend beyond the current house setback. The expansion is to follow the existing roof line and end at the existing exterior walls; and WHEREAS, in City Code Section 129 -2, an expansion permit is defined as follows: Expansion permit means a permit which is granted by the City Council for the expansion or enlargement of a nonconforming structure in accordance with Section 129 -40. ; and WHEREAS, City Code Section 129 -40 (a) outlines the criteria for granting expansion permits and are described as follows: Sec. 129-40. Expansion Permit. (a) Criteria. An expansion permit for a nonconforming structure may be issued, but is not mandated, to provide relief to the landowner where this chapter imposes practical difficulties to the property owner in the reasonable use of • the land. In determining whether practical difficulties exist, the applicant must satisfy the City Council that the following criteria exist: 1W0Zs1 (1) the proposed expansion is a reasonable use of the property considering: a. function and aesthetics of the expansion. b. absence of adverse off -site impacts such as from traffic, noise, odors and dust. c. adequacy of off - street parking. (2) exceptional or extraordinary circumstances justifying the expansion are unique to the property and result from lot size or shape, topography, or other circumstances over which the owners of the property since enactment of this chapter have had no control. (3) the exceptional or extraordinary circumstances do not result from the actions of the applicant. (4) the expansion would not adversely affect or alter the essential character of the neighborhood. (5) the expansion requested is the minimum needed. ; and WHEREAS, details regarding the application are contained in Planning Report No. 11 -02 and the supporting materials that were submitted by the applicant; and WHEREAS, Staff recommended approval of the expansion permit subject to conditions; and WHEREAS, the expansion permit was reviewed by the Planning Commission at its April S 5, 2011 meeting who unanimously voted to recommended Council approval as recommended by Staff. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Mound does hereby approve the expansion permit for the property at 5174 Tuxedo Boulevard to construction of an upper floor addition (sunroom) subject to the following conditions: 1. Applicant shall be responsible for payment of all costs associated with the land use request. 2. No future approval of any development plans and /or building permits is included as part of this action. 3. Applicant shall submit all required information upon submittal of the building . permit application. 4. An expansion permit granted will automatically expire and be of no further force and effect if no building permit has been issued within one year of the date of approval of the expansion permit unless an extension is approved pursuant to the regulations contained in City Code Section 129.40 which shall be the responsibility of the applicant. 5. Applicant shall ensure that runoff from the roof does not drain on to neighbor's • property. -797- 6. Applicant shall be responsible for procurement of any and /or all local or public • agency permits including, but not limited to, the submittal of all required information prior to building permit issuance. 7. The applicant shall be responsible for recording the resolution(s) with Hennepin County. The applicant is advised that the resolution(s) will not be released for recording until all conditions have been met. 8. No building permits will be issued until evidence of recording of the resolution at Hennepin County is provided. 9. No building permits will be issued until any and /or all fees associated with the land use application have been paid unless an escrow deposit of sufficient amount is on file with the City. 10. No grading or alteration is permitted below the 931.5 100 -year floodplain elevation for the MCWD unless a floodplain alteration permit is approved by the City Council. 11. All new construction shall take placed at or above the Regulatory Flood Protection Elevation. The minimum required elevation for Lake Minnetonka is 933.0. 12. No materials shall be stockpiled in the 50 -FT lakeshore setback or 100 -year floodplain area(s). • 13. Mechanical equipment can be located up to two (2) feet into setback areas. As part of its approval of the expansion permit, the City Council hereby makes the following findings of fact based on the record: 1. The setback on the north/lake side is affected by the proposal but is not expanded as the proposed construction /addition is within the existing building footprint and is being constructed on top of the existing structure. 2. The conditions of City Code Section 129-40 (a) are being met. The expansion permit is hereby approved for the following legally described property: - To Be Inserted - Adopted by the City Council this 26TH day of April 2011 • Attest: City Clerk Mark Hanus, Mayor BUM MINUTE EXCERPTS MOUND ADVISORY PLANNING COMMISSION APRIL 5, 2011 BOARD OF APPEALS PLANNING CASE NO. 11 -02 EXPANSION PERMIT - UPPER FLOOR DECK TO SUNROOM CONVERSION /ADDITION AT 5174 TUXEDO BOULEVARD APPLICANT: SHAUN TANCHEFF The subject property fronts Tuxedo Boulevard on the the north side. The existing house setback on the lal The existing second floor flat roof deck is to be e addition but will not extend beyond the current the existing roof line and ends at the existin for approval of the expansion permit subject to ndi sQUth s!00,And Lake Minnesota on :aside is approximately 43 feet. Ped with a glass and aluminum setback. The expansion follows walls. Staff recoi,6ended plann Discussion also ensued regarding stockpiling of aq1WWion materials. Driveway appears adequate. Public Works wili;monitor. Wa -off and gutters were also addressed. Smith noted that the City ErigPeer's com did not include any concerns about runoff. MOTION by Gilli; permit subject to -799- ral of the expansion carried unanimously. n �J is • t Y P h'�.. , F r � J P l P y: " t--j � > . \� t � . : 5341 Maywood Road Mound, MN 55364 (952) 472 -0604 PLANNING REPORT TO: Planning Commission FROM: Sarah Smith, Community Development Director DATE: April 1, 2011 SUBJECT: Expansion Permit Application — Upper floor house addition (sunroom) within existing footprint OWNER: Shaun Tancheff PLANNING CASE NUMBER: 11 -02 LOCATION: 5174 Tuxedo Boulevard ZONING: R -1A Single Family Residential REQUEST The Planning Commission will review an expansion permit application from Shaun Tancheff related to the property at 5174 Tuxedo Boulevard for a proposed "sunroom enclosure" to be constructed over an existing 2nd floor flair deck. Per email dated March 30, 2011 from the applicant, Dean Umbehocker will be present at the April 5, 2011 Planning Commission meeting and will serve as his designee for the request. The requested expansion permit application is outlined as follows: Required Existing /Requested Expansion Permit Setback Lakeside 50 ft 43(+/-) SITE CONDITIONS The subject property fronts Tuxedo Boulevard on the south side and Lake Minnetonka on the north side and includes a 2 -story single - family dwelling (with tuckunder garage). The existing house setback, on the lakeside, is approximately 43 FT ( + / -) from the 929.4 ordinary high water mark for Lake Minnetonka. The existing second floor flat roof deck is to be enclosed with a glass and aluminum addition over the existing structure but will not extend beyond the current house setback. The expansion is to follow the existing roof line and end at the existing exterior walls. REVIEW PROCEDURE City Code Section 129.40 outlines the criteria for granting expansion permits in the City of Mound. As the Planning Commission may recall, these are new provisions which were adopted by the City of Mound in 2010 and have an effective date of October 31, 2010. :1 • Per City Code Section 129.2, an expansion permit is defined as follows: Expansion permit means a permit which is granted by the City Council for the expansion or enlargement of a nonconforming structure in accordance with Section 129 -40. As the expansion permit regulations and review process are fairly new, a copy of Ordinance No. 06 -2011 which includes the zoning amendments adopted in October 2010 related to variances /nonconformities /expansions has been included as an attachment to this report. 60 -DAY PROCESS Pursuant to Minnesota State Statutes Section 15.99, local government agencies are required to approve or deny land use requests within 60 days. The expansion permit application submitted on February 3, 2011 was deemed to be complete on February 24, 2010. The City executed a 60 -day extension as provided in Minnesota Statutes 15.99 on March 16, 2011 for action on the expansion permit application therefore the deadline for City action on the application is June 1, 2011. NOTIFICATION City policy requires that abutting property owners are notified by mailed notice. Planning Commission members are advised that this activity was completed on April 1, 2011. • DEPARTMENT COMMENTS Copies of the application were forwarded to all City departments for review. All written comments which were received are outlined below: Public Works Supt. Public Works Supervisor Police Chief Kurtz No comment needed. No objections. No objections. Bolten & Menk Consulting Eng. No engineering concerns. No increase in hardcover. Consulting Planner None. Building Official Submitted sunroom plans submitted were signed by a professional engineer. Foundation information on file with the City for previous house remodel /foundation project in 2000 and supplemental information supplied by applicant on September 3, 2010 that provided supplemental information about foundation improvements undertaken which included concrete block, rebar and was core filled, is acceptable for • building permit review. Applicant to provide two (2) full -sized copies of original plans with building permit application. -804- PUBLIC AGENCY COMMENTS • A copy of the application was forwarded to the involved agencies for review including the MnDNR, the Minnehaha Creek Watershed District and the Lake Minnetonka Conservation District. As of this writing, no comments have been received. DISCUSSION 1. At its June 2, 2009 meeting, the Planning Commission deemed the existing survey on file with the Building Department acceptable for the purpose of upcoming land use review for a proposed variance associated with the proposed deck to sunroom construction project but the application was incomplete until September 3, 2010 when supplemental information was submitted for the proposed variance application. The application was heard by the Planning Commission and recommended for denial due to the issues associated with the Krummenacher court decision but was subsequently withdrawn prior to Council action. Following formal adoption of nonconforming /variance /expansion permit ordinance amendments that were approved by the City Council in October 2010, an expansion permit was subsequently resubmitted for the proposed project originally submitted as a variance. 2. A lakeside setback variance was previously approved in 2000 for a house remodel /construction project. See attached copy of Resolution No. 00 -63. 3. The current house has a nonconforming lakeside setback as the code requires a • minimum of 50 FT as measured to the 929.4 ordinary high water elevation for Lake Minnetonka. The proposed upper floor deck to sunroom enclosure project will not extend beyond the existing house setbacks. 4. Roof eaves, gutters and the like are allowed to extend no more than two (2) feet into the required setback. Gutters are allowable encroachments in the setback area but cannot extend beyond a property line. 5. Mechanical devices are allowed as long as encroachment does not extend more than (2) feet into required setback area. 6. The applicant's hardcover sheet indicates that hardcover is under the 40 percent allowance by (38.4) SF but has not been field verified. Members are advised that hardcover is not affected by the proposal as the sunroom addition area is over the existing house. 7. Supplemental information provided by the applicant on September 3, 2010 indicates that the preliminary plans submitted by Patio Enclosures does not accurately reflect the actual roof slope and overall height and will be 5 inches below the current roof line. Final verification of the proposed building height of the addition will take place as part of any future building permit, as applicable. • • RECOMMENDATION Staff recommends that the Planning Commission recommend City Council approve an expansion permit for construction of an sunroom over an existing 2nd floor deck for the existing house at 5174 Tuxedo Boulevard subject to the following conditions: 1. Applicant shall be responsible for payment of all costs associated with the land use request. 2. No future approval of any development plans and /or building permits is included as part of this action in the event the expansion permit application is approved. 3. Applicant shall submit all required information upon submittal of the building permit application. 4. An expansion permit granted will automatically expire and be of no further force and effect if no building permit has been issued within one year of the date of approval of the expansion permit unless an extension is approved pursuant to the regulations contained in City Code Section 129.40 which shall be the responsibility of the applicant. 5. Applicant shall ensure that runoff from the roof does not drain on to neighbor's property. • 6. Applicant shall be responsible for procurement of any and /or all local or public agency permits including, but not limited to, the submittal of all required information prior to building permit issuance. • 7. The applicant shall be responsible for recording the resolution(s) with Hennepin County. The applicant is advised that the resolution(s) will not be released for recording until all conditions have been met. 8. No building permits will be issued until evidence of recording of the resolution at Hennepin County is provided. 9. No building permits will be issued until any and /or all fees associated with the land use application have been paid unless an escrow deposit of sufficient amount is on file with the City. 10. No grading or alteration is permitted below the 931.5 100 -year floodplain elevation for the MCWD unless a floodplain alteration permit is approved by the City Council 11. All new construction shall take placed at or above the Regulatory Flood Protection Elevation. The minimum required elevation for Lake Minnetonka is 933.0. 12. No materials shall be stockpiled in the 50 -FT lakeshore setback or 100 -year • floodplain area(s). 13. Mechanical equipment can be located up to two (2) feet into setback areas. 14. It is also important to mention that weight restrictions on local streets went on in the City of Mound on March 15, 2011. Therefore, the applicant is advised to coordinate construction activities in cooperation with the Public Works Superintendent or Supervisor related to same. Tuxedo Boulevard is a 9 -ton road. CITY COUNCIL REVIEW In the event a recommendation is received from the Planning Commission at its April 5, 2011 meeting, it is anticipated that the application will be forwarded to the City Council for review /action at either its April 12, 2011 or April 26, 2011 meeting. • • ff:Zi1d • FEB 3 5341 Maywood Road, Mound, MN 55364 Phone 952472 -0600 FAX 952472 -0620 �l� �� P� 2011 EXPANSION PERMIT APPLICATION to Application Fee and Escrow Deposit required at time of application. Case No._ Please tvue or print leaibiv SUBJECT Address 5714 Tuxedo Blvd, Mound PROPERTY LEGAL Lot 020 Block DESC. Subdivision WHIPPLE SHORES PID # 24- 117 -24 -34 -0004 Zoning: R1 R1A RZ R3 B1 62 B3 (circle one) PROPERTY Name _Shaun Tancheff Email OWNER Address 5174 Tuxedo Blvd, Mound Phone Home_ so jRVN&1W Work_ APPLICANT Name Email (IF OTHER THAN Address OWNER) Phone Home Work Fax Has an application ever been made for zoning, variance, conditional use permit, or other zoning procedure for this property? Yes (X) No ( ). If yes, list date(s) of application, action taken, resolution number(s) and provide copies of resolutions. Application on June 27, 2000 was approved as RESOLUTION # 00 -63 on a of August, 2000. 2. Detailed description of proposed construction or alteration (size, number of stories, type of use, etc.): _Proposed expansion is to enclose the existing second floor flat roof deck with a glass and aluminum _ frame addition. The expansion will follow the existing roof line and end at the existing exterior walls._ • Expansion Permit Information (2/3/2011) Page 4 of 6 !r:1i Case No. 3. Please complete the following information related to the property and building's conformity with the • zoning regulations for the district in which it is located including the expansion permit request. SETBACKS: REQUIRED REQUESTED EXPANSION (or existing) Front Yard: (_;� W) 20 ft. ft. ft. Side Yard: (N S& W) 6 ft. Side Yard: (N S E %) 6 ft. Rear Yard: (N S E W) ft. ft. ft. Lakeside: E W) 50 ft. 19 ft. 19 ft. (NSEW) ft. ft. ft. Street Frontage: ft. ft. ft. Lot Size: _5981 sq ft sq ft sq ft Hardcover: _2392.4_sq ft sq ft sq ft • 4. Does the present use of the property conform to all regulations for the zoning district in which it is located? Yes (X), No ( ). If no, specify each non - conformity: 5. Are there exceptional or extraordinary circumstances justifying the expansion unique to the property such as lot size or shape, topography or other circumstances over which the owners of the property since enactment of this chapter have no control? Please check all that apply: ( ) too narrow ( ) topography ( ) soil ( ) too small ( ) drainage (X) existing situation ( ) too shallow ( ) shape ( ) other: specify Please describe: The original building foundation circa 1924 has not been changed. The re -model / re -build of 2000 attempted to minimize the expansion into the lakeside by halting the second floor at the 50' setback. In retrospect this was not a good design decision as the flat decks have been prone to failure. This remodel is an attempt to remedy that mistake. _ U Expansion Permit Information -809- (2/3/2011) Page 5 of 6 Case No. i kb • 6. Were the exceptional or extraordinary circumstances described above created by the action of anyone having property interests in the land after the zoning ordinance was adopted (1982)? Yes ( ), No (X ). If yes, explain: 7. Were the exceptional or extraordinary circumstances created by any other person -made change, such as the relocation of a road? Yes ( ), No ( X ). If yes, explain: 8. Are the exceptional or extraordinary circumstances for which you request an expansion permit peculiar only to the property described in this petition? Yes ( X ), No ( ). If no, list some other properties which are similarly affected? • 9. Comments: I certify that all of the above statements and the statements contained in any required papers or plans to be submitted herewith are true and accurate. I acknowledge that I have read all of the variance information provided. I consent to the entry in or upon the premises described in this application by any authorized official of the City of Mound for the purpose of inspecting, or of posting, maintaining and removing such notices as may be required by law. Owner's Signatu • Applicant's Signature Expansion Permit Information -810- (2/3/2011) Page 6 of 6 Date F h i -, � Zvi Date Y HARDCOVER CALCULATIONS S .- r+Q (IMPERVIOUS SURFACE COVERAGE) • PROPERTY ADDESS: 51 ' q 7v OWNER'S NAME: ry LOT AREA SQ. FT. X 30% = (for all lots) ........ ............................... LOT AREA 5 l SQ. FT. X 40% = (for Lots of Record) ............................. Z37 y • Existing Lots of Record may have 40 percent coverage provided that techniques are utilized, as outlined in Zoning Ordinance Section 350:1225, Subd. 6.B.1 (see back). A plan must be submitted and approved by the Building Official. LENGTH WIDTH SQ FT HOUSE z X X = TOTAL HOUSE ...................................................... ................... ............................ .... • 1274 DETACHED BUILDINGS X = (GARAGE/SHED) X = TOTAL DETACHED BUILDINGS ..... ........ :...:........... • E J Z X 0 AR AL ETC. 5 `I....:.. :.... X 3.d _ i Z.D X = G` TOT DRIVEWAY, ETC ......... ............................... t Co O DECKS Open decks (1/4" min. X T Opening between boards) with a pervious surface under are not / X = counted as hardcover. � All TOTAL DECK ............... ............................... I ZO ( X 10 = 120 �(' t;a, Qa�i,1 sass) X TOTAL OTHER ..................... ............................... TOTAL HARDCOVER / IMPERVIOUS SURFACE .................... ............................... UNDER / OVER (indicate difference) ..................................... ............................... PREPARED BY u r, �G Revised 08106/03 a", /(N /� -811- DATE Ja.. 2011 • • 5341 MAYWOOD ROAD CITY OF MOUND, MN 55354 -1687 PH: (952) 472 -0600 FAX: (952) 472 -0620 WEB: wwwcityofmound.com March 16, 2011 Shaun Tancheff 5174 Tuxedo Boulevard Mound, MN 55364 RE: Expansion Permit Application —City Execution of 60 -Day. Extension per M.S. 1599 This letter is in regard to the exyansion permit application for a proposed sunroom to be constructed over an existing 2 floor deck at 5174 Tuxedo Boulevard in Mound which was submitted and deemed to be complete on February 3, 2011. As provided by Minnesota Statutes 15.99, please be advised that the City of Mound is hereby executing an extension for an additional (60) days related to the City's timelines for approval or denial of the comprehensive plan amendment request. Therefore, the • City's extended timelines for action on the expansion permit application is on or around June 1, 2011. The purpose for the extension is to allow for additional time for review and action of the on the expansion permit application by the Planning Commission and City Council including, but not limited to, the preparation of any and/or all reports and documents associated with the request. Additionally, the application was originally tentatively scheduled to be held to be included on the March 1, 2011 Planning Commission meeting agenda but was deferred to the April 5, 2011 meeting as City policy requires attendance by the applicant or designated representative and Staff was notified by email on Febraaty 23, 2011 that you were not able to attend due to a scheduling conflict. If you have any questions, please feel free to contact me directly at (952) 472 -0604 or by email at SarahsmithAcitvofinound.com. I will be happy to answer any questions you may have. S, ly �.....- �- . Smith Community Development Director 0P~&?ffiCyCWMff June 27, 2000 RESOLUTION # 00-63 • RESOLUTION TO APPROVE LAKESIDE SETBACK VARIANCE TO REMODEL THE RESIDENCE AT 5174 TUXEDO ROAD, LOT 20, WHIPPLE SHORES, PID #24 -117- 24-34 -0004 P & Z CASE #00-34 WHEREAS, the applicant, has requested a lakeside setback variance to remodel the house at 5174 Tuxedo Road. The associated variances are as follows: Promised ftuired Variance Lakeside 19 ft 50 ft 31 ft ; and, WHEREAS, the property is located within the R -IA Single Family Residential District which requires a lot area of 6,000 square feet, a 20 feet front yard setback and 6 feet side yard setbacks for lots of record; and, WHEREAS, the current home is a one story home with a walkout to Tuxedo • Blvd. with a concrete block single stall garage. Both structures are in poor condition. The new home meets all zoning requirements except the lakeside setback; and, WHEREAS, the proposed residence is a two story design with a tuckunder garage. The existing foundation will be utilized with a new foundation to be added; and, WHEREAS, the lakeside deck extends to 19 feet from the OHW. A stairway system connects the deck to the dock and is in poor condition; and, WHEREAS, the Planning Commission has reviewed the request and recommended that the Council approve the variance; and, NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of Mound, Minnesota, as follows: 1. The City does hereby approve the variance request with the following conditions: a. The deck shall conform to a setback that is consistent with a line of sight between the structure setbacks on adjoining properties. b. Need to submit revised elevations as a part of a revised grading and • drainage plan. -813- i, * ro • June 27.2M c. The existing stairway and landing system be removed and rebuilt to code. 2. This variance is approved for the following legally described property as stated in the Hennepin County Property Information System: LOT 20, WHIPPLE SHORES, HENNEPIN COUNTY, MINNESOTA. 3. The property owner shall have the responsibility of filing this resolution and easements with Hennepin County and paying all costs for such recording. The foregoing resolution was moved by Councilmember Ahrens and seconded by Councilmember Weycker. The following Council-members voted in the affirmative: Ahrens, rown, Hanus, and Weycker. • The following Councilmembers voted in the negative: none. Mayor Meisel were absent and excused. la'mf� C. a2al Attest: City Clerk r • SS/ PAT MFIIEL Mayor IDRE CITY OF MOUND ORDINANCE NO. 06-2010 • AN ORDINANCE AMENDING CHAPTER 129 OF THE MOUND CITY CODE AS IT RELATES TO THE ZONING ORDINANCE The City of Mound does ordain: That Mound City Code Subsection 129 -2 to hereby amended by adding or deleting the following definitions: Sec. 129-2. Definitions. Expansion or enlargement of a nonconforming structure means any increase in a dimension, size, area, volume, or heiaht. Expansion, enlargement or intense cation of a nonconformina use means any increase in the area of a nonconforming use including any placement of such a use in a structure or part thereof where the use or the structure did not exist before any improvement that would allow the land to be more intensely developed for the nonconforming use, any move of a nonconforming use to a new location on the property, or any increase in intensity of the nonconforming use based on a review of the original nature, function or purpose of the nonconforming use, the hours of operation traffic parking noise exterior storage signs exterior lighting types of operations tomes of goods or services offered, odors, area of operation, number of employees and other factors deemed relevant by the city. Expansion permit means a permit which is granted by the City Council for the expansion or enlargement of a nonconforming structure in accordance with Section 129- 40. ■err. ra. T- !AAQA:AZA&XALLAJL: Nonconformina use means an activity using land, buildings and /or structures for a purpose that is not currently allowed as a use in the zoning district in which it is located. The term also includes the use of a property which is eligible for a conditional use permit, for which none has been granted. Nonconforming structure means a nonconformity other than a nonconforming use that does not currently conform to an ordinance standard such as height setback or size: and includes a structure which is permitted as the result of a variance -815- Undue Hardship, as used in connection with the granting of a variance means • the property in question cannot be out to a reasonable use if used under the conditions allowed by the official controls: the plight of the landowner is due to circumstances unique to the property not created by any landowner: and the variance if granted will not alter the essential character of the locality. Economic considerations alone shall not constitute a hardship if a reasonable use for the property exists under this chapter. Repeal City Code Subsection 129 -35 in its entirety and replace with a new City Code Subsection 129-35 as follows: (a) Any stFuMum OF 616S lawNlly the date the exisfiRg upen eftrAive of , shall Rot themafteF Fevek to AS PAW RGRGGRfGFR;iRg U68. �. At Sec. 129 -35. Nonconfonmities. (a ) Nonconforming structures. • (1) Any structure lawfully existing upon the effective date of the ordinance from which this chapter is derived may be continued at the size and location existina upon such date, but may be expanded or intensified only in compliance with the provisions of this section. (2) Nothing in this chapter shall prevent the repair, replacement restoration maintenance or improvement of a structure, unless such activities constitute an expansion or enlargement of the nonconformity. (3) Whenever a nonconforming structure shall have been damaged by fire flood explosion, earthquake, war, riot, or act of God, it may be reconstructed and used as before if it be reconstructed not later than 12 months after such calamity, unless the damage to the buildina or structure is 50 percent or more of its fair market value as shown on the assessor's records at the time of damage in which case it may not be reconstructed unless a building permit has been applied for within 180 days after the date of damage, and construction is completed not more than one year after the date of damage. (4) Nonconforming principal and accessory structures may be expanded enlarged or modified with conformina structures provided: a. the use of the parcel is conforming to district regulations b. the proposed project meets the current zoning reaulations C. no other nonconformities are created. • (5) Nonconforming principal and accessory structures may be expanded or enlarged with nonconformina structures only if a variance or an expansion permit is -granted. a. a variance is required if the expansion or enlamement will further intrude (as measured at the point of areatest intrusion) into the reauired setback beyond the distance of the existing structure or the proposed new height/stories is areater than allowed by City Code. For example: (i) if the building currently the nonconformina structure will not further intrude into any currently required setback but will be expanded to a height -greater than is permitted by City Code a variance will be needed. b. an expansion permit is reauired if the expansion or enlamement will not further intrude (as measured at the point of areatest intrusion) into the reauired setback bevond the distance of the existing structure or the proposed new heiaht/stories is within City Code requirements. For example: (i) if the building currently has a setback of 15 feet when 20 feet is required and the proposed expansion will have a setback of 15 feet an expansion permit will be needed: (2) a second floor area is expanded into the nonconforming setback over an existina nonconformina first floor. 0 -817- • u ESansbn within setback am allowed by code N —Lot line >Sadm& per code ,. sedwk and allow ed percode. Pxpmsion of a mmoefunity 'ae m pemit if it dos not fates iAm am suck am and a vmimm if it don fizds uAmde nAo da se0m& area. Elnstims 9 per code 19 o- -, _Vatical k=me rmgmi u mn expansion w-1 PM& as long= flee bagirt is witirin district sta=dac&. il: lire Leigh eacxe b district stands* a van= a named. (b) Nonconforming uses. (1) Any use lawfully existing upon the effective date of the ordinance from which this chapter is derived may be continued at the size and in a manner of operation existino upon such date, but may be expanded or intensified only in compliance with the provisions of this section. This paragraph shall not be deemed to prevent • the expansion, enlargement or intensification of a nonconforming use if the use is allowed as a conditional use and the landowner obtains a expansion permit allowing such expansion, enlargement or intensification • (2) When any nonconforming use of any structure or land in any district has been changed to a conforming use, and has been so used for more than 12 months, it shall not thereafter revert to its prior nonconforming use. (3) Whenever a nonconforming use of a structure or land is discontinued for a period of more than 12 months, any future use of said structure or land shall be in conformity with the provisions of this chapter. (4) A nonconforming use of a structure or parcel of land may be changed to a similar nonconforming use or to a more restrictive nonconforming use (as determined by the City Council). Some nonconforming uses are permitted by conditional use permits. Once a structure or parcel of land has been placed in similar nonconforming use or in a more restrictive nonconforming use, and has been so used for a period of more than 12 months, it shall not return to the prior nonconforming use. (5) With the approval of the City Council, alterations may be made to a building containing nonconforming residential units when they will improve the livabilitv thereof, provided they will not increase the number of dwelling units or result in the expansion, enlargement or intensification of the use. Amend City Code Subsection 129 -39 as follows: (a) Criteria. A variance to the provisions of this chapter may be issued, but is not mandated, to provide relief to the landowner in those zones where this chapter imposes undue hardship to the property owner in the use of his the owner's land. No use variances may be issued. A variance may be granted only in the event that the following circumstances exist: (1) Exceptional or extraordinary circumstances apply to the property which do not apply generally to other properties in the same zone or vicinity, and result from lot size or shape, topography, or other circumstances over which the owners of property since enactment of this chapter have no control. (2) The literal interpretation of the provisions of this chapter would deprive the applicant of rights commonly enjoyed by other properties in the same district under the terms of this chapter. (3) The special conditions or circumstances do not result from the actions of the applicant. (4) Granting of the variance requested will not confer on the applicant any special privilege that is denied by this chapter to owners of other lands, structures or buildings in the same district. • (5) The variance requested is the minimum variance which would alleviate the hardship. 0 (6) The variance would not be materially detrimental to the purposes of this • chapter or to property in the same zone. (b) Procedure. (1) The person applying for a variance shall fill out and submit to the planning staff a variance request form. A site plan with a certificate of survey must be attached at a scale large enough for clarity showing the following information: a. Location and dimensions of: 1. Lot; 2. Building; 3. Driveways; and 4. Off - street parking spaces. b. Distance between: 1. Building and front, side, and rear lot lines; 2. Principal building and accessory buildings; 3. Principal building and principal buildings on adjacent lots. C. The location of signs, easements, underground utilities, etc. d. Any additional information as may be reasonably required by the planning staff and applicable sections of this zoning chapter. • (2) The planning staff shall refer the application to the Planning Commission for review. (3) The Planning Commission must take action on the application within 90 days after receiving the application. If it recommends for the variance, it may impose conditions it considers necessary to protect the public health, safety and welfare and such conditions may include a time limit for the use to exist or operate (4) Upon receiving the recommendation of the Planning Commission or within 60 days after referral of the application for a variance to the Planning Commission, if no recommendation has been transmitted, the Council may place the request on the agenda. The Council may grant variances from the literal provisions of this chapter in instances where their strict enforcement would cause undue hardship because of circumstances peculiar and unique to the individual premises, or property, under consideration, and may grant such a variance only when the applicant therefore has demonstrated that such action will be in keeping with the spirit and intent of this chapter and the zoning district in which such a variance is requested (5) Whenever a variance has been considered and denied by the City Council, a similar application and proposal for a variance shall not be considered again by the Planning Commission or City Council for at least one (1) year from the date of its denial, unless a decision to reconsider such matter is made by the Citv Council. • (c) The Council may impose any reasonable condition in the granting of such variances in order to insure compliance with this chapter, or to protect adjacent property. Amend City Code Chapter 129 to establish a new Subsection 129.40 as follows: • Sec. 129 -40. Expansion Permit. (a) Criteria. An expansion permit for a nonconforming structure may be issued, but is not mandated, to provide relief to the landowner where this chapter imposes practical difficulties to the property owner in the reasonable use of the land. In determining whether practical difficulties exist, the applicant must satisfy the City Council that the following criteria exist: (1) the proposed expansion is a reasonable use of the property considering: a. function and aesthetics of the expansion. b. absence of adverse off -site impacts such as from traffic, noise, odors and dust. c. adequacy of off - street parking. (2) exceptional or extraordinary circumstances iustifving the expansion are unique to the property and result from lot size or shape, topography, or other circumstances over which the owners of the property since enactment of this chapter have had no control. (3) the exceptional or extraordinary circumstances do not result from the actions of the applicant. (4) the expansion would not adversely affect or alter the essential character of the neighborhood. (5) the expansion requested is the minimum needed. (b) Procedure. (1) The person applying for the expansion permit shall fill out and submit to the planning staff an expansion permit reauest form with fee as required by City Code Section 101. A site plan with a certificate of survey must be attached at a scale large enough for clarity showing the following information: a. Location and dimensions of: 1. Lot: 2. Buildincia 3. Driveways: and 4. Off - street parking spaces. b. Distance between: 1. Building and front, side, and rear lot lines: 2. Principal building and accessory buildings: 3. Principal building and principal buildings on adiacent lots. c. The location of signs, easements. underground utilities, etc. d. Any additional information as may be reasonably reauired by the planning staff and applicable sections of this zoning chapter. (2) The planning staff shall refer the application to the Planning Commission for review. If it recommends approval of the expansion permit, it may include conditions it considers necessary to protect the public health, safetv and welfare and the essential character of the neighborhood. -821- Amend City Code Subsection 129 -195 (b)(2) of the Mound City Code as follows: (2) The application for the conditional use permit shall include a detailed preliminary plan, and shall be submitted in complete conformance with the city subdivision regulations or with all Wises variations detailed and explained. Nfa�eRaes Variations to the requirements of chapter 121, pertaining to subdivisions may be approved by the City Council upon a showing that the public health, safety, and welfare will not be adversely affected and further that the development plan will not have an adverse effect on adjacent properties. All variances must be so noted on the preliminary plan at the • time of application. -822- (3) Upon receiving the recommendation of the Planning Commission the Council • may place the request on the agenda for formal review. If it grants an expansion permit, the Council may impose any reasonable condition in order to insure compliance with this chapter, or to protect adjacent property. If no recommendation has been transmitted by the Planning Commission within 60 days of the date of the application. the Council, at its discretion, may place the request on the agenda for review. Action on a reauest for an expansion permit shall be in accordance with the timeline established in Minnesota Statutes 15.99. (c) Term of Expansion Permit. An expansion permit granted will automatically expire and be of no further force and effect if no buildina permit has been issued within one year of the date of approval of the expansion permit. The applicant may petition for an extension of time in which to have a buildina permit issued. Such extension shall be reguested in writing and filed with the Building Official at least thirty (30) days before the expiration of the oriainal expansion permit. It is the applicant's responsibility to monitor the expiration of the expansion permit. There shall be no charge for the filina of such petition. The request for extension shall state facts demonstratina a good faith attempt to complete the expansion as permitted in the expansion permit. Such petition shall be presented to the Plannina Commission for a recommendation to the City Council for decision. Once the project is completed as approved, the expansion permit becomes perpetual subject to the limitations contained in Section 129 -40 or in the expansion permit itself. The structure authorized by the expansion permit will be treated in all respects as a nonconformina structure. • (d) Whenever an expansion permit has been considered and denied by the City Council, a similar application and proposal for an expansion permit shall not be considered again by the Plannina Commission or City Council for at least one (1) vear from the date of its denial, unless a decision to reconsider such matter is made by the City Council. (e) Specfc project. The expansion permit is only valid for the project for which it was aranted. Construction of any project must be in substantial compliance with the building plans and specifications reviewed and approved by the City Council. (f) Recording. A certified copy of the expansion permit must be filed by the applicant with the Hennepin County recorder or the Hennepin County registrar of titles. The expansion permit must contain a legal description of the property affected. Amend City Code Subsection 129 -195 (b)(2) of the Mound City Code as follows: (2) The application for the conditional use permit shall include a detailed preliminary plan, and shall be submitted in complete conformance with the city subdivision regulations or with all Wises variations detailed and explained. Nfa�eRaes Variations to the requirements of chapter 121, pertaining to subdivisions may be approved by the City Council upon a showing that the public health, safety, and welfare will not be adversely affected and further that the development plan will not have an adverse effect on adjacent properties. All variances must be so noted on the preliminary plan at the • time of application. -822- Amend City Code Subsection 129 -195 (g) as follows: (g) No conveyance of property within the PDA shall take place until the property is platted in • conformance with the city subdivision regulations and Minn. Stats. § 462.358 or unless specifically waived in accordance with section 121 -3 by WiaRrae. All bylaws, homeowners' association articles of incorporation, and protective covenants must be approved by the City Attorney and filed with the record plat. Passed by the City Council this 12th day of October, 2010. Mayor Mark Hanus Attest: Bonnie Ritter, City Clerk Published in The Laker the 23`d day of October, 2010. Effective the 20 day of October, 2010. • s 11:MI • 0 • LAKE EXISTING HOUSE /SAO /Offs f<E!/AT //vl (y��,ef wirN Iwiaity �) F.4AAGg c 939.0 zJ CrfEr r,-r = 999.0 . . V A0.0 of P W,/ = 95-1. 7 CERTIFICATE OF SURVEY FOR SHAUN TANCHEFF OF LOT 20, WHIPPLE SHORES HENNEPIN COUNTY, MINNESOTA _fit\ 00 (034.$) LEGAL DESCRIPTION OF PREMISES Lot 20, WHIPPLE SHORES a denotes iron marker ses.$) : denotes existing spot elevation, meon.sea level datum -- s70 - - -- : denotes 'gxistmaa contour line, mean sea levei datum *jRjF0F1VD /Bearings shown are based uponan assumed datum. This survey intends to show the boundaries of the above described property, the location of an existing house, and the proposed location of a proposed addition thereon. It does not purport to show any other improvements or encroachments. 0 C 1 12 2000 MUUNU-PLANh: ^ "' ppp� 1 hereby certify that Nis survey ma prWW by me & ender my brat sip&— SCALE N QIa01jBW I viral ad W I em a dly reo*W Cid E*W ud Lad birveyar ud& 1" -20' l2 UZ OR= LAD 21M 92 MW the hers of the State of Wwmtm DATE 10 -9-00 462 TNNRAf1( Alll]IE Ig6 lNE_82 - ��. �/�,._� ECD 812- 473 -4141 MA S. Gr eeb& Aiwmta Licum •12755.M wmta Licade •12755 p0"f15 00 -415 °D�c�ro�p yq J1yrW O,a, £ O v� m O r n a i r_no - cl I- _ O �P � N � � E 0 �n•p �C O 0 —Z0 C ^ Kilo � O N T¢¢� HM " Se ZV 2 7 o p C Z S f1 O N Z Zm0_ C7 - '�szcn > O m P O H r Z � g, ;-; g O m Z N N n 9 Z rn x m VI 'n =;a p zm�m� n co C., — w v •P s N m 1 O z N ,z N f O CD y V _ O �P � N � � E W C 1 x D %3, w Cm UA � O J f�uu �1���v p =m�V'UOy r � O 1 D m m D m O "o 1 � m 3 O ,Dyi, lIN yOL -825- X H m O U 0 A g D y 10 X y 3 Q, c%:r_ y ry � 10 via A m— ,ov. =G ro�yvn.w n oy ro m lDDR 03 y V N l� \ m— ,ov. =G ro�yvn.w n oy ro m lDDR 03 C� MEMORANDUM TO: Honorable Mayor Hanus and City Council FROM: Jim Fackler, Public Works DATE: April 18, 2011 RE: Public Lands Permit — Proposal for educational project by Our Lady of the Lake Catholic School to stencil storm drains in Auditor's Road Request for Public Lands Permit. City Code Section 62 -11 regulates use of public lands in the City of Mound and states that construction of any kind on any public way, park or • commons, or the alteration of the natural contour of any public way, park, or commons, is unlawful unless a special construction on public land permit is issued. • Summary of Request. Our Lady of the Lake Catholic School, 2385 Commerce Boulevard, is requesting approval of a Public Lands Permit application so as to undertake an educational project along Auditor's Road which will include stenciling storm drain covers by students. The event is proposed to be held on Thursday, April 28, 2011 from 12:30 PM to 2:30 PM. City Department Review. Copies of the request and all supporting materials were forwarded to all applicable City departments for review and comment. All written comments received to date have been summarized below: Public Works Superintendent Jim Fackler 1. The street will need to be blocked off. The Police and Fire Departments will need to be notified that Auditor's Road will be barricaded and not open for traffic during the duration of the event. 2. Recommend Public Works Supervisor Ray Hanson be asked whether or not Hennepin County Transportation should be notified as a courtesy. Public Works Supervisor Ray Hanson Has reviewed and has no comment. Fire Chief Greg Pederson Has reviewed and has no comment Police Chief Jim Kurtz • 1) The police department has no objection or opposition to the issuance of a permit as long as Our Lady of the Lake closes Auditors Road at Commerce Boulevard and Shoreline Drive using approved city street barricades. is s -827- 04/15/2011 07:09 9524729152 OLL PAGE 02 An PUBLIC LANDS -�.QQ APPLICATION • $941 Maywood Road, Mound. MN 55384 Phone 952,472••0800 Fox 962-472-0820 Date Received Parks and Open Space Commission Date City Council Date DISTRIBUTION Building Official Parks Director DNR MCWD Check One Public Works Other "— ❑ CONSTRUCTION ON PUBLIC LAND PERMIT – new construction. NOTE: NO PERMIT SHALL BE ISSUED FOR CONSTRUCTION OF BOAT HOUSES OR OTHER BUILDINGS ON PUBLIC LAND - City Code Section 62 -11(a) & (b). ❑ PUBLIC LAND MAINTENANCE PERMIT – to allow repairs to an existing structure - City Code Section 62-11(c). ❑ CONTINUATION OF STRUCTURE – to allow an existing encroachment to remain in an "as is" condition - City Code Section 62- 11(g). LAND ALTERATION – change in shoreline, drainage, slope, trees, vegetation, fill, etc. - City Code Section 62- 11(d). The structure or work you are requesting is an activity on publicly owned lands. Structures like boat houses, patios, Afteds, etc. are all NONCONFORMING USES, It is the intent of the City to bring all these uses into conformance, which Weans that those structures will at some time in the future have to be removed from the public lands. All permits are granted for a limited time and are non - transferable. Stairway construction must meet the State Building Code when the permit is for new construction, or a new permit is applied for due to a change in dock site holler. Please type or print legibly APPLICANT Name d Y'kc L41e, - 361wp Email —fj–.� AV F'&&k,; r,.n Address _Zq-j 1 . Phone (H) (W) E� 60k 0 0. i'�x4 . !,51 6��-IvYS tcplc ABUTTING Address oc PROPERTY LEGAL Lot Block DESC. Subdivision PID # Zoning: R1 R1A R2 R3 81 82 83 (Circle one) •Public t..ands Permit Application Page 1 of 2 Rmvi Red 411412022 -828- 04115/2011 07:09 9524729152 OLL PAGE 03 PUBLIC Name Email PROPERTY Dock Site N Shoreline Type CONTRACTOR Name Email Address Phone (H) A FEE OF $200.00 APPLIES IF VALUATION OF PROJECT EXCEEDS $1,000.00 AND NO PUBLIC BENEFIT IS DERIVED. • PROPOSED COST OF PROJECT (INCLUDING LABOR & MATERIALS) $_d,#rt . DESCRIBE REQUEST & PURPOSE t 004d, (i (6, S j SfVrr" p{.,YQ,K � ►'�(�, ka' Al i ' r'ti t�� 1 �Dis Zia 08 `7lw r �a✓�' ! o�,�'�' rT�o� ' ? �'bo r- dr., 11 - I d �.k �13�_SK -i�.l I GrJ «r. r i�'�� �.rc/Q u1D�e ^( 5d.y.,_La s ye t;�('�iM.In�sr. yrrt rCb�1ell AV— k" �1►/trt)"'7tari Applicant's Signature Date 7 Public Lands Permit Application Page 2 of 2 Revised 411412011 r1 U CITY OF MOUND • RESOLUTION NO. 11- RESOLUTION APPROVING A PUBLIC LANDS PERMIT FOR STENCILING PROJECT AUDITOR'S ROAD BY OUR LADY OF THE LAKE CATHOLIC SCHOOL WHEREAS, the applicant, Our Lady of the Lake Catholic School, is seeking a Public Lands Permit to undertake an educational project on Auditor's Road on April 28, 2011 which is to include stenciling of drain hole covers which will be done by students; and WHEREAS, City Code Section 62 -11, requires City Council approval by a majority vote for construction of any kind on any public way, park or commons, or the alteration of the natural contour of any public way, park or commons; and WHEREAS, the application was routed to the involved departments for review; and WHEREAS, details regarding the request are contained in the Public Lands Permit Report dated April 18, 2011; and WHEREAS, based on its review, Staff recommended approval of the Public Lands Permit subject to conditions; and WHEREAS, the City Council considered this request at their meeting of Tuesday, April 26, 2011 2011. • NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Mound, Minnesota, to approve the Public Lands Permit as submitted by Our Lady of the Lake Catholic School to conduct an educational program in Auditor's Road with the following conditions: - TO BE INCLUDED BASED ON STAFF COMMENTS Adopted by the City Council this 26TH day of April 2011. Attest: Bonnie Ritter, City Clerk Mayor Mark Hanus BCC L_TG>N 8 Mr-= N K, 1 r--.j�� Consulting Engineers & Surveyors 2638 Shadow Lane, Suite 200 • Chaska, MN 55318 -1172 • Phone (952) 448 -8838 - Fax (952) 448 -8805 www.bolton- menk.com April 21, 2011 Honorable Mayor and Members of the City Council City of Mound 5341 Maywood Road Mound, MN 55364 RE: 2011 Street, Utility and Retaining Wall Improvements City Project Nos. PW- 11-01, PW- 11 -02, PW -11 -04 Award of Bid Dear Mayor and Members of the Council: Bids were received on April 19, 2011 and there was only one bid received as follows: Contractor Amount Bid GMH Asphalt Corporation $3,634,297.96 While there was only one bid, we feel it is good and competitive bid based on unit price comparisons to some other recently bid street projects as well as our Engineer's estimate of $3,893,100. The bid is $258,802 less (6.6 %) than our estimate which was primarily based on the average unit prices of similar items bid on the 2009 Street and Utility reconstruction project, without adding any inflation. Also, the street construction items included in the bid are less than the street construction costs that were estimated in the Feasibility Reports for both the Highland Area and the Southwest Island Area. Therefore, unless unforeseen street conditions arise, we will be consistent with the estimated assessments included in the Feasibility Report, We have checked with the prime contractors who had purchased plans and specifications for the Mound Street and Utility Project as to why they did not submit a bid for the project. A few of the general themes we heard included: project construction constraints ( our specifications require that sections or areas be substantially completed before a new area is opened up for construction ); these type of reconstruction projects generally have low profit margins and "local" contractors have some cost advantage; concerned about coordinating work with CenterPoint Energy's gas main replacement; current workload and scheduling conflicts. In summary, we feel the City has received a good bid and it is important to move ahead with the project now in order to have it substantially completed by the end of the construction season. The contractor, GMH Asphalt Corporation has successfully completed previous Mound Street Reconstruction projects in 2007 and 2009, as well as several other similar projects throughout the metro area. F:\ MOUN \C12101482 \Correspondence\Bid Award Ur. 4,21,1 Ldoc DESIGNING FOR A BETTER TOMORROW Bolton & Menk is ° - - - -d opportunity employer -831- Mayor and Members of the Council April 21, 2011 • Page 2 It is our recommendation that the Council approve the attached resolution awarding the 2011 Street, Utility and Retaining Wall Improvement Project to GMH Asphalt Corporation in the amount of $3,634,297.96. Sincerely, BOLTON & MENK, INC. Daniel L. Faulkner, P.E. Mound City Engineer • • F:\ MOUMC12101482 \Cortespondence\Bid Award Ur. 4,21,11.doc -832- CITY OF MOUND RESOLUTION NO. 11 RESOLUTION ACCEPTING BID FOR THE 2011 STREET, UTILITY AND RETAINING WALL • IMPROVEMENT PROJECT - SOUTHWEST ISLAND AREA (PW 11 -01), AND THE 2011 STREET, UTILITY AND RETAINING WALL IMPROVEMENT PROJECT — HIGHLAND AREA (PW- 11 -02) WHEREAS, pursuant to an advertisement for bids for the 2011 Street, Utility and Retaining Wall Improvement Project — Southwest Island Area (PW 11 -01), and the 2011 Street, Utility and Retaining Wall Improvement Project — Highland Area (PW- 11 -02), bids were received, opened and tabulated according to law, with the following bid received and complying with the advertisement: GMH Asphalt Corporation $3,634,297.96 AND WHEREAS, it appears that GMH Asphalt, Inc. of Chaska, MN is the lowest responsible bidder, NOW, THEREFORE BE IT RESOLVED by the City Council of Mound, Minnesota, that the Mayor and City Clerk are hereby authorized and directed to enter into the attached contract with GMH Asphalt of Chaska, MN, in the name of the City of Mound for the 2011 Street, Utility And Retaining Wall Improvement Project - Southwest Island Area (Pw 11 -01), and The 2011 Street, Utility And Retaining Wall Improvement Project — Highland Area (Pw- 11 -02) according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 0 Adopted by the City Council this 26"' day of April, 2011. Attest: Bonnie Ritter, City Clerk -833- 1 Mayor Mark Hanus • • 5341 Maywood Road Mound, MN 55364 (952) 472 -0604 MEMORANDUM To: Honorable Mayor and City Council From: Sarah Smith, Community Development Director Date: April 22, 2011 Re: Discussion /action related to violation (s) of Conditional Use Permit for property at 4831 Shoreline Drive which allows for sales and display of (20) vehicles Summary. At its April 26, 2011 meeting, the Mound City Council will discuss and consider revocation of the Conditional Use Permit (CUP) that allows open lot vehicle sales and display for up to (20) vehicles at the property located at 4831 Shoreline Drive. The grounds for the proposed revocation is that additional items in addition to passenger vehicles are being sold or stored on the property, including, but not limited to, semi- trucks (with and without trailers), boats, trailers and automotive body and engine parts. In addition, it appears that automotive repair work is taking place on the property. These activities are not permitted uses in this particular zoning district and are not authorized by the Conditional Use Permit that was issued for the property. • Overview. 1. The business presently operating on the site is MainStreet USA which began operations in 2009. According to Hennepin County tax records, the property owners are Alexander Teplitski and Maxim Teplitski. The operator of the dealership at 4831 Shoreline Drive is Max Teplitski. 2. Based on Staffs on -going monitoring of the site and especially in recent weeks, there have been vehicles, semi - trucks (with and without trailers), boats, trailers and engine and body parts on the property and it is not clear whether the stored items are on display for sale, or if they are on the property for other reasons. Additionally, it is important to note that the City has received several complaints in the last few weeks about the appearance of the site especially due to the presence of the semi- trucks and trailers. Photos of the subject site taken on April 22, 2011 have been included as attachments. 3. Resolution No. 02-68 references open lot vehicle sales and does not mention sale of commercial semi - trucks or "recreational vehicles" nor does it authorize storage or repair activities. The intent of the original CUP was for sales /display of passenger -type vehicles. 4. Based on information submitted as part of the original 2002 CUP application from Matt Lajoy, (former owner of Lake Minnetonka Quality Motors) which included a supplemental applicant memorandum dated April 23, 2002, it was stated by the applicant that he had been conducting a very successful used car dealership on the site since December 1, 2001 and that he consistently maintained a very clean dealership with shiny and rust free vehicles and that cars such as BMW, Mercedes, Acura, Toyota, Saturn and other high quality vehicles had been sold on the property. • It was also stated in the supplemental applicant narrative that no automotive repair would occur or take place and the applicant fully understood that the property is located at the one of the main entrances to the City and that the site is visually prominent. -834- S. The Community Service Officer (CSO) and a Mound Police Officer visited the property on April 11, 2011 and requested that the owner clean up the lot and to cease mechanical work. Additionally, the operator was called on or around April 12, 2011 by Staff with a request for response as soon • as possible. In a letter dated April 14, 2011 from the City of Mound to the operator, a request was made to bring the property into compliance with the CUP within five (5) business days and also contact Staff in advance of April 20, 2011 so as to address the City's concerns about use and appearance of the site, current activities taking place and the incomplete status of a CUP amendment application. This letter was hand delivered to the operator by the Community Service Officer and also forwarded by US Mail. It was mentioned in the letter that failure to comply could result in an administrative citation and /or the matter being referred to the City Attorney or City Council for further action consistent with the City Code. Council members are advised that a similar letter with regard to the CUP and vehicle storage and related activities was sent to the operator in October 2010. Additionally, the operator has been previously advised by Mound Staff that the current CUP limits sales and display to no more than (20) vehicles and does not include commercial -type vehicles, such as a semi- truck, or recreational vehicles. A follow up visit to the property was done on April 18, 2011 by the CSO at which time the operator was advised to contact City Hall as soon as possible. As of this date, the City has not received a response to any of these communications. 6. Staff has asked the Fire Chief to evaluate emergency service conditions on the property and in the subject area, especially with regard to the presence of the semi- trucks. Review by the Public Works Director and Police Chief (or their designee) may also be needed and is being pursued. • 7. The operator previously submitted a CUP amendment application in September 2009 to increase the number of vehicles to be offered for sales /display as well as to offer major /minor vehicle repair and service maintenance work. Additional information was submitted in November 2009 and June 2010, however, as of this date, the application is incomplete. A copy of the September 18, 2009 CUP amendment application and submitted copy of site survey dated 9-8-09 have been included as attachments. B. City Code Section 129 -38 (c) (9) states that in the event an applicant violates any of the conditions set forth in the permit, the City Council shall have the authority to revoke the conditional use permit. Due to non - compliance on behalf of the operator to take appropriate steps to correct the current violations on the site for conformity with the CUP and the failure of the operator to contact Staff related to same, the Council is to consider taking action at the Tuesday, April 26, 2011 City Council meeting. MainStreet USA's representatives have been notified of the Council's consideration of this matter and have been invited to attend the meeting. See attached copy of letter dated April 22, 2011. In the event that MainStreet's representatives attend the meeting, the Council should give them the opportunity to address the Council in order to present evidence and make any comments that they feel are necessary concerning the matter. • • Page 2 -835- Action /Next Steps. The City Council has the following options: 1. Adopt a resolution revoking the conditional use permit • 2. Allow MainStreet USA until the May 10, 2011 City Council meeting (or some other date that is specified by Council) to bring the property into compliance with the conditional use permit which includes the removal of all semi- trucks (with or without trailers), recreational vehicles, engine and body parts and all other equipment or machinery. In the event the property is not brought into compliance by the specified date, adopt a resolution revoking the conditional use permit. • • • Page 3 . April 22, 2011 Mr. Maxim Teplitski Mr. Alexander Teplitski MainStreet USA, Inc. 4831 Shoreline Drive Mound, MN 55364 By Hand Delivery and USMail 5341 MAYWOOD ROAD MOUND, MN 55364 -1687 PH: (952) 472 -0600 FAX: (952) 472 -0620 WEB: www.cityofmound.com Re: Notice of Proposed Revocation of a Conditional Use Permit to Allow Open Lot Vehicle Sales for the Property Located at 4831 Shoreline Drive, City of Mound This letter will serve as notice that the Mound City Council will be considering revocation of the Conditional Use Permit AlloWihg -Oi -peii -Lot Vehicle Sales on your "property located 'at 4831 Shoreline Drive. The grounds for the proposed revocation is that additional items in addition to • passenger vehicles are being sold or stored on the property, including, but not limited to, semi - trucks (with and without trailers), boats, trailers and automotive body and engine parts. In addition, it appears that automotive repair work is taking place on the property. These activities are not permitted uses in this particular zoning district and are not authorized by the Conditional Use Permit that was issued for the property. The City Council will consider revocation of the Conditional Use Permit at its meeting on Tuesday, April 26, 2011, in the Council Chambers at Mound City Hall at 5341 Maywood Road, Mound, Minnesota, at 7:00 pm. You have the right to appear and participate in the meeting, present evidence and make any comments you have regarding the proposed action. Very Development Director -837 - 0PnntWonremWPwr • ,..,,,.,,��.._�__._._ �,...__. e, �" S �' /r r. fl-im • April 14, 2011 Max Teplitski Main Street USA, Inc. 4831 Shoreline Drive Mound, MN 55364 RE: Conditional Use Permit — Main Street Sales By US Mail and Hand Delivery GOV This letter is in regard to the conditional use permit (CUP) which allows the sale and display of up to twenty (20) vehicles on the subject property at 4831 Shoreline Drive. A copy of Resolution No. 02 -68 allowing vehicle sales on the property has been attached. Based on Staffs ongoing evaluation of the property, there have been vehicles, semi - trucks (with and without trailers), boats, and motorcycles parked on the property and it is not • clear whether the stored vehicles are on display for sale, or if they are on the property for other reasons. You are advised that Resolution No. 02 -68 references vehicle sales and does not mention sale of "recreational vehicles" or commercial semi - trucks. In addition, it appears that automotive repair work, in some capacity, is taking place on the property which is not allowed by your current conditional use permit. You are directed to bring the property into compliance with the conditional use permit within five (5) business days and also to contact Staff to schedule a meeting in advance of April 20, 2011 to discuss this matter including but not limited to concerns about use and appearance of the site, current activities taking place and the status of your incomplete conditional use permit amendment application. Be advised your failure to comply may result in an administrative citation and /or the matter being referred to the City Attorney or City Council for further action consistent with the City Code. Sincerely, Sarah Smith Community Development Director C: City Manager Kandis Hanson • Community Service Officer Mike Wocken • CITY OF MOUND RESOLUTION NO. 02-68 RESOLUTION TO APPROVE A CONDITIONAL USE PERMIT TO ALLOW "OPEN LOT VEHICLE SALES" FOR LAKE MINNETONKA QUALITY MOTORS LOCATED IN THE B -2 GENERAL BUSINESS DISTRICT AT 4831 SHORELINE DRIVE, LOTS 1 TO 4,21 AND PART OF 5 AND 20, BLOCK 1, SHIRLEY HILLS UNIT A. PID #13- 117 -24-44 -0014 P & Z CASE #02 -15 • WHEREAS, owner, Ken Custer, and Lessee, Matt LaJoy (Lake Minnetonka Quality Motors) have applied for a Conditional Use Permit to allow principal use of the property at 4831 Shoreline Drive for open lot vehicle sales; and WHEREAS, Mound City Code Section 350.640 allows open lot sale businesses in the B -2 General Business District by Conditional Use Permit; and WHEREAS, Mound City Code Section 350.310, Subd. 95 defines an open sales lot as follows "Any land used or occupied for the purpose of buying and selling goods, materials, or merchandise and for the storing of same under the open sky prior to sale." WHEREAS, there are no active Conditional Use Permits which govern use of the site; and WHEREAS, the applicant proposes to display and sell up to (20) vehicles on the property; and WHEREAS, the Planning Commission has reviewed the request and recommended approval subject to conditions, • Resolutlon No. 02.68 • NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Mound, Minnesota, as follows: 1. The City does hereby grant the Conditional Use Permit for Lake Minnetonka Quality Motors to allow open lot vehicle sales at 4831 Shoreline Drive subject to the following conditions: a. No more than twenty (20) vehicles shall be displayed and offered for sale on the property. b. All signage, including banners, flags, shall meet the regulations of City Code Section 365. 2. This Conditional Use Permit is approved for the following legally described property on the attached Exhibit A. The foregoing resolution was moved by Councilmember Brown, seconded by Councilmember Osmek. The following voted in the affirmative: Brown, Hanus, Meisel, Osmek and Meyer. The following voted in the negative: None. is Adopted by the City Council this 11th day of June, 2002. SS /Bonnie Ritter Attest: Bonnie Ritter, City Clerk SS /Pat Meisel Mayor Pat Meisel -847- C7 EXHIBIT A • Resolution No. 02 -68 • Lots 1 to 4 inclusive and Lots 20 and 21 and that part of the vacated alley lying Northeasterly of a line drawn from the Northwest comer of Lot 4 to the southwest comer of Lot 20, all in Block 1, Shirley Hills Unit A; ALSO the northeasterly 0.75 feet of Lot 5, and that part of the adjoining vacated alley lying northeasterly of the northwesterly extension of the Southwesterly line of said Northeasterly 0.75 feet, and Southwesterly of a line drawn from the Northwest corner of Lot 4 to the Southwest comer of Lot 20, all in said Block; EXCEPT the West 0.75 feet of Lot 20, and that part of the adjoining vacated Southwest comer of said Lot 20, and Southwesterly of a line described as follows: Beginning at the point of intersection of the East line of said West 0.75 feet with the southerly line of said Lot 20; thence South along the Southerly extension of said East line to its point of intersection with the Northwesterly extension of the Southwesterly line of the Northeasterly 0.75 feet of Lot 5; thence Southeasterly along said Northwesterly extension to its intersection with a line drawn from the Northwest comer of said Lot 4 to the Southwest comer of said Lot 20, and there ending. All in Block 1, Shirley Hills Unit A, according to the plat thereof on file and of record in the office of the Registrar of Titles in and for said County of Hennepin and State of Minnesota. MEMORANDUM IN SUPPORT- OF AN AMENDMENT TO CONDITIONAL USE PERMIT 95-97, • TO: City of Mound Staff Planning Commission city Copseff. FROM: Lake Minnetonka 1. . _p eftka Quality Motors, Inc, Matthew LaJoy, President DME: April, 23, 2002 My name 4 Matthew LaJoy. and 1 recsently opened IAm Mimietotilm QUW4, MADrs. my wife and I are, Mound and have lived-on Three Points for the last 4 years. I decided to. Open.111ybusipess i;;; in..Moundas- the. vision Program Abetned - MY welcoming of new a;i4 local business ownars:' Back in November 2001, I discovered that Aber niftfifig ly�ft the site locatod.at.4,83,t. S6rdinc Drive was available forlease Swab. S i I signed a house C"usftteri Ihave been cone 4 mx.=U car ded ership on site sin 2001. 1 have, consistently maintained a very clean dealership. My vehicles are shiny and rust: free Ibave sold cars: such as-Lexus; BMW, Mercedes, Acura, Toyota, Sahib, and other high quality vehicles- I.have.sold approximately 30 % of my vehicles to lodg cusbm=. MY.&SkmlupisMwdmgavayvAkabL- service toloW its iis w& as people from other areas v Ladvertise almost all of my vehicles in the Star Tribune and Auto Trader. As a result of this advertising, people from an over Minnesota i I— This memorandum suppoft my requea to the City of bkmW to aftibad Vb6turrea. Conditional Use Permit governing the property located at 4831 Sh6kili&-Drive. "The' subject property is zoned B-2 General. Business Zoling- District which allows Minor Auto Repair and Open Sales Lots by Conditional Use Permit. Currently, the property is gave med by Conditional Use Permit 95 -97, which allows for display of 10 vehicles for sale, 3 of which may be on the north side of the lot, and 7 of which must be parked within. the fm= =closure. BefixvCW95-97was, *d;*'Cop 93-40 governed the property in similar fashion. A number of changes have. since the issuance of these Curs. NeidwcupreoiiO'U*Ooqptpkpwsi4*dft property. • Em" Originally, this site was u fuel station with 2 gas fps: lammed on the north side of the • site, and a fence enclosure at the south end of the iot Tlie 3- vehiole limitation in the prior CUP's was in place because the gas pumps consumed. a large portion of the north section of the lot. Since the issuance of the prior CUP's, the fence enclosure has been removed, and both gas pumps have been removed. The north side of the site now wide open. space. With approximately 180 feet of space in the north section, there is more tl"an enough room for at least 10 cars. I had. mistakenly read CUP 95-97 to allow me tQ display 10 vehicles orf the front of the lot. In good faith, I limited my inventory to 10 vehicles, not realizing that there was a condition on the areas in. which. the vehicles could be di�spiayed. Imme�iat upon discussing the display limitations with Mound staff personnel, I revised my splay areas to maintain MnOiance. However, the 3 vehicle limitation in the north section drastically reduces my inventory exposes will be detrimental to the viability the business. I understand that my dealership is located. at one of the main des to the City of 7 Mound, and that: my, business is visibly prominent:; For this reason, I have consistdnti maintained a very clean. and. impressive dealership: My� busing is`liinitdd: t+ vehicle sale 1 • • 'a has ust=,Etl . .:� as gas - verrotzs� -Oar shops: Fuoret, at: this oca on, a €ormer,tenant conducting business as a- car repair sh6p oanta inn% the groundwater and soil by not properly &Wsmgof used mom of in I will ik have a repair shop, only sales. Inevitably with, repair shops, there are contamination issues: with used motor oils and: fluids ;. Therefore; I-contend that my Business would b; less burdensome enviroommully and. visually than a: repair shop: 'Moreover, repau *r, shops &equentl.y have can parked outside with 'open hoods, greasy engine p iris on the ground,. dumpsters, towtrucks; trailers, and various other uns ghtly objects. valnch have a High nega _ -, visual impact, I hope to continue my operations in a clean and orderly 66f would also like to impmve the grounds withdeoarafivelaio In conclusion, I respectfully request that CUP 95 -79 be amended to allow Lake Minnetonka Quality Motors to display between. 10 and 20 vehicles for sale, 10 of which may be on the north. side :of the site along Shoreline Drive, the remainder according *6 the attached proposed display plan: Thank you for your consideration. Respectfully. submitted, *re- 5341 Maywood Road, Mound, MN 55364 Phone 952 - 472 -0600 FAX 952 - 472 -0620 CONDITIONAL USE PERMIT APPLICATI RAC SEP r d qn,,-ox Application Fee and Escrow Deposit required at time �ono, � U f ND PLANNING COMM. DATE CASE NO. ` CITY COUNCIL DATE: Please We or print the following information: PROPERTY INFORMATION LEGAL DESCRIPTION Subject Addn3as �E C�/✓1Pr�� Ile Name of Business lI LOS) �� 2 LQ % —Block Subdivision PiEw // ;7-- 2 APPLICANT The applicant is: Owner!Z Other _ Email 7 ! < `, Name Address 41f3 _/ '! LXo 4 e Phone Hom f a f"" 4!�'P" V Work 7 Cell E-Mail Address OWNER Name Email (if other than Address Phone Home Work Cell applicant) ARCHITECT. i/ $EYOR. Name C. 4�- Email 1_-?"16e —S Address 77 C>i %%'/ `�L� —3 ENGINEER Q x/22 [�/ V �/ Phone Office / l % J Icell Fax /�%�C / 3 7 . 7 ZONING Circle: R -1 R -1A R -2 R-3 B-1 (!-2 B-3 DISTRICT Conditional Use Permit Info -851- (1/6/2009) Page 4 of 5 • • Description of Proposed Use: �S � arY VVe h,oi�s EFFECTS OF THE PROPOSED USE: List impacts the proposed use will have on property in the vicinity, including, but not limited to traffic, noise, light, smoke/odor, parking, and describe the steps taken to mitigate or eliminate the iMpacts. Ll�c d 5 �Ciil�'/. /(�e d' L l Vie- r� i ✓I'� CT Q a ; l/ T ��/�' ✓l�5 Ae- A fast ,q.elopl"o c,.-& .f, 7 iiv6eeaSe- rl/o�v ttoe(his If applicable, a develdppment sc ule shall be attached application providing reasonable guarantees for the completion of the proposed development. Estimated Development Cost of the Project: $. Has an application ever been made for zoning, variance, conditional use permit, or other zoning procedure for this property? $I yes, () no. If yes, list date(s) of application, action taken, resolution number(s) and provide copies of resolutions. • Application must be signed by all owners of the sub' fy, or an explanation given why this is not the case. Print Applicant's Name ure Date &,e�aod� ��V'1.4) �1, - gg��f Print Owner's Name Da e Print Owner's Name Owner's Signature Date City Code Section 350:525 relating to Conditional Use Permits must be reviewed by the applicant. If applying for a two family dwelling, City Code Section 350:630, Subd. 4. must be reviewed by the applicant. Conditional Use Permit Info (1/6/2009) Page 5 of 5 -852- SITE PLAN FOR MAINSTREET USA INC. IN BLOCK 1, SHIRLEY HILLS UNIT A HENNEPIN COUNTY, MINNESOTA SHORELINE DRIVE (CO. RD. NO. 15) DESCWM" -853- CRO mcl 3 ASSOCIATES, SRE PLANNERS MS N. YNLLOW DR. LONG LMK, MN. 68946 842. 4"4141 • C, i Na®r cant rw�r rw6 Rwt eva�RrArpN, oa 6ram rM6P11�ARlD 6r NE OR 6N8O1 Nr 686:4RgA6MlgNN16 t "�; nunw�nArueew®mav6aoww6NO �. 61MVlr6111M061 T61AW B OF 71E RA7E Or �pIINOTA City of Mound Cash/lr-ve$tmeots Balances ""'F u0 af'the Erd of January 2411` • FUftD NAME ' ", $`Arnouttt General Fund 2,042,956 Park Dedication Fees 7,675 Area Fire Protection Services 286,566 Dock 274,629 Mound HRA 9,009 G.O. Equip. Certf. 2004 - C G.O. Equip. Certf. 2005 - C G.O. Equip. Certf. 2006 - C 71,354 G.O. Equip. Certf. 2007 - C 18,107 G.O. Equip. Certf. 2008 - D 8,769 G.O. Equip. Certf. 2009 - C 31,575 Mound Transit Center Series 2006 165,965 G.O. Bonds 2001 - C 97,756 G.O. Bonds 2003 - C TIF 1 -2 619,555 G.O. Bonds 2001 -A 31,833 G.O. Bonds 2003 - A 286,164 G.O. Bonds 2004 - A (48,966) G.O. Bonds 2005 - A 423,477 G.O. Bonds 2006 - A 416,011 G.O. Bonds 2007 - A 478,045 G.O. Bonds 2008 - B 359,907 G.O. Bonds 2009 - A 417,286 G.O. Refunding Bonds 2011 -A - Taxable G.O. TIF Bonds 2009 D 185,399 HRA Lease Rev Bonds • 101,763 Capital Improvement 292,350 MSA 243,095 Sealcoat 35,837 Downtown TIF 1 -2 63,910 Downtown TIF 1-3 MHR 117,788 Water 555,782 Sewer 167,252 Liquor Store (353,296) Recycling 2,359 Stone Water (790,931) Totaf Cash, §6612 44,380 Note: The above schedule shows the combined cash and investment balances by fund for the months indicated as recorded in the General Ledger. The balances do not reflect receivable, payables, authorized transfers, encumbered funds, or dedicated /reserved resources, etc. Only some accrued transactions are reflected. Investment income will be distributed to the funds at the end of the year and is not included. A long and complete process is followed to record all transactions, before we close the books, at the end of the year. In addition, the audit from the Independent auditor is performed and an official Comprehensive Report will be presented to the City Council and made available to interested parties. • In no way this schedule is intended to represent balances of funds available for spending. -854- CITY OF MOUND BUDGET REVENUE REPORT JAN 2011 8.33% JAN 2011 YTD PERCENT BUDGET REVENUE REVENUE VARIANCE RECEIVED GENERAL FUND Taxes 3,901,424 - - (3,901,424) 0.00% Business Licenses 17,800 - - (17,800) 0.00% Non - Business Licenses /Permit 126,100 2,599 2,599 (123,501) 2.06% Intergovernmental 134,060 - - (134,060) 0.00% Charges for Services 79,600 62,626 62,626 (16,974) 78.68% Court Fines 55,000 388 388 (54,612) 0.71% Street Lighting Fee 250,178 17,776 17,776 (232,402) 7.11% Franchise Fees 397,000 - - (397,000) 0.00% G.O. Equipment Certificates - - - - #DIV /01 Charges to Other Dpts 12,000 563 563 (11,438) 4.69% Park Dedication Fees - - - - 0.00% Other Revenue 273,950 6,442 6,442 (267,508) 2.35% TOTAL REVENUE 5,247,112 90,393 90,393 (5,156,719) 1.72% FIRE FUND 1,061,672 42,374 42,374 (1,019,299) 3.99% DOCK FUND 176,115 45,634 45,634 (130,482) 25.91% MOUND HRA - - - - #DIV 101 WATER FUND 1,580,256 117,109 117,109 (1,463,147) 7.41% SEWER FUND 1,387,775 112,887 112,887 (1,274,888) 8.13% LIQUOR FUND 2,800,000 167,162 167,162 (2,632,838) 5.97% RECYCLING FUND 225,276 15,561 15,561 (209,715) 6.91% STORM WATER UTILITY 437,500 28,380 28,380 (409,121) 6.49% INVESTMENTS (Net of Expense) 914 914 914 01 -855- 4/12/2011 KI � 0 GENERAL FUND TOTAL 5,247,816 318,265 318,265 4,929,551 6.06% Area Fire Service Fund CITY OF MOUND 49,285 49,285 1,012,387 4.640A BUDGET EXPENDITURES REPORT 200,811 6,557 6,557 194,254 Jan. 2011 HRA Fund (Deck Mtc) 53,300 8.33% 2,100 51,200 Jan. 2011 YTD 1,500 PERCENT - BUDGET EXPENSE EXPENSE VARIANCE EXPENDED - - GENERAL FUND - - - - Council 77,960 2,771 2,771 75,189 3.55% Promotions 73,000 - - 73,000 0.00% City Manager /Clerk 312,053 18,760 18,760 293,293 6.01% Elections 2,650 1,806 1,806 844 68.15% Finance 301,783 17,696 17,696 284,087 5.86% Assessing 95,600 - - 95,600 0.00% Legal 131,500 - - 131,500 0.00% City Hall Building & Srvcs 110,100 3,898 3,898 106,202 3.540A Computer 40,700 6,142 6,142 34,558 15.09% Police 1,932,171 134,140 134,140 1,798,031 6.94% Emergency Prepardeness 8,150 902 902 7,248 11.07% Planning /Inspections 310,619 14,350 14,350 296,269 4.62% Streets 715,439 42,706 42,706 672,733 5.97% Parks 479,199 32,720 32,720 446,479 6.83% Park Dedication Fees - - - - 0.00% Cemetery 11,100 - - 11,100 0.00% Recreation 2,500 - - 2,500 0.00% Transfers 559,000 42,374 42,374 516,626 7.58% Cable TV 47,492 - - 47,492 0.00% Contingencies 36,800 - - 35,800 0.00% GENERAL FUND TOTAL 5,247,816 318,265 318,265 4,929,551 6.06% Area Fire Service Fund 1,061,672 49,285 49,285 1,012,387 4.640A Dock Fund 200,811 6,557 6,557 194,254 3.27% HRA Fund (Deck Mtc) 53,300 2,100 2,100 51,200 3.940A Capital Projects 1,500 - - 1,500 TIF 1 -2 Downtown Mound - - - - TIF 1-3 MHR - - - - Water Fund 1,579,357 23,354 23,354 1,556,003 1.48% Sewer Fund 1,786,799 138,028 138,028 1,648,771 7.72% Liquor Fund 598,624 19,347 19,347 579,277 3.23% Recycling Fund 221,407 285 285 221,122 0.13% Storm Water Utility 354,270 -856:,833 1,833 352,437 0.52% 4/11/2011 City of Mound Cahllnvestroenfs Balances by`Fuad AiNh End' of Fnbruaryidi FUND NAME ; a Amaunt`- General Fund 1,052,478 Park Dedication Fees 7,675 Area Fire Protection Services 333,095 Dock 303,673 Mound HRA 3,689 G.O. Equip. Certf. 2004 - C - G.O. Equip. Certf. 2005 - C G.O. Equip. Certf. 2006 - C 94 G.O. Equip. Certf. 2007 - C (18,399) G.O. Equip. Certf. 2008 - D (23,699) G.O. Equip. Certf. 2009 - C 31,575 Mound Transit Center Series 2006 59,382 G.O. Bonds 2001 - C (359,005) G.O. Bonds 2003 - C TIF 1 -2 323,860 G.O. Bonds 2001 - A (147,882) G.O. Bonds 2003 - A (2,090,719) G.O. Bonds 2004 - A (1,469,998) G.O. Bonds 2005 - A 291,252 G.O. Bonds 2006 - A 298,827 G.O. Bonds 2007 - A 286,797 G.O. Bonds 2008 - B 242,912 G.O. Bonds 2009 - A (51,996) G.O. Refunding Bonds 2011 - A 5,345,387 Taxable G.O. TIF Bonds 2009 D 108,031 HRA Lease Rev Bonds (253,796) Capital Improvement 197,610 MSA 509,394 Sealcoat 70,191 Downtown TIF 1 -2 63,910 Downtown TIF 1 -3 MHR 117,788 Water (1,035,619) Sewer (6,123) Liquor Store (404,720) Recycling 2,230 Storm Water (1,438,775) =Totall Cash 249;121 (196,006) Note: The above schedule shows the combined cash and investment balances by fund for the months indicated as recorded in the General Ledger. The balances do not reflect receivable, payables, authorized transfers, encumbered funds, or dedicatedireserved resources, etc. Only some accrued transactions are reflected. Investment income will be distributed to the funds at the end of the year and is not included. A long and complete process is followed to record all transactions, before we close the books, at the end of the year. In addition, the audit from the independent auditor is performed and an official Comprehensive Report will be presented to the City Council and made available to interested parties. In no way this schedule is intended to represent balances of funds available for spending. -857- • 7 • CITY OF MOUND BUDGET REVENUE REPORT FEB 2011 16.67% FEB 2011 YTD PERCENT BUDGET REVENUE REVENUE VARIANCE RECEIVED GENERALFUND Taxes 3,901,424 - - (3,901,424) 0.00% Business Licenses 17,800 2,500 2,500 (15,300) 14.04% Non - Business Licenses /Permit 126,100 6,961 9,561 (116,539) 7.58% Intergovernmental 134,060 15,000 15,000 (119,060) 11.19% Charges for Services 79,600 302 62,928 (16,672) 79.06% Court Fines 55,000 4,373 4,761 (50,239) 8.66% Street Lighting Fee 250,178 18,484 36,260 (213,918) 14.49% Franchise Fees 397,000 11,534 11,534 (385,466) 2.91% G.O. Equipment Certificates - - - - #DIV /0I Charges to Other Dpts 12,000 849 1,412 (10,588) 11.76% Park Dedication Fees - - - - 0.00% Other Revenue 273,950 34,004 40,446 (233,504) 14.76% TOTAL REVENUE 5,247,112 94,008 184,401 (5,062,711) 3.51% FIRE FUND 1,061,672 42,374 84,747 (976,925) 7.98% DOCK FUND 176,115 154,758 200,392 24,277 113.78% MOUND HRA - - - - #DIV 101 WATER FUND 1,580,256 109,680 226,789 (1,353,467) 14.35% SEWER FUND 1,387,775 112,734 225,620 (1,162,155) 16.26% LIQUOR FUND 2,800,000 171,384 338,546 (2,461,454) 12.09% RECYCLING FUND 225,276 16,630 32,190 (193,086) 14.29% STORM WATER UTILITY 437,500 29,611 57,990 (379,510) 13.25% INVESTMENTS (Net of Expense) 181 1,095 1,095 : 4/12/2011 CITY OF MOUND BUDGET EXPENDITURES REPORT Feb. 2011 16.67% Feb. 2011 YTD PERCENT BUDGET EXPENSE EXPENSE VARIANCE EXPENDED • GENERAL FUND 112,240 161,525 900,147 200,811 67,515 Council 77,960 9,717 12,488 65,472 16.02% Promotions 73,000 - - 73,000 0.00% City Manager /Clerk 312,053 22,754 41,514 270,539 13.30% Elections 2,650 86 1,892 758 71.40% Finance 301,783 20,618 38,314 263,469 12.70% Assessing 95,600 4 4 95,596 0.00% Legal 131,500 8,386 8,386 123,114 6.38% City Hall Building & Srvcs 110,100 6,403 10,301 99,799 9.36% Computer 40,700 2,278 8,420 32,280 20.69% Police 1,932,171 134,654 268,794 1,663,377 13.91% Emergency Prepardeness 8,150 20 922 7,228 11.31% Planning /Inspections 310,619 16,435 30,785 279,834 9.91% Streets 715,439 43,247 85,953 629,486 12.01% Parks 479,199 77,006 109,726 369,473 22.90% Park Dedication Fees - - - - 9DIV 101 Cemetery 11,100 954 954 10,146 8.59% Recreation 2,500 - - 2,500 0.00% Transfers 559,000 42,373 84,747 474,253 15.16% Cable TV 47,492 - - 47,492 0.00% • Contingencies 36,800 - - 36,800 0.00% GENERAL FUND TOTAL 5,247,816 384,935 703,200 4,544,616 13.40% Area Fire Service Fund Dock Fund HRA Fund Capital Projects TIF 1 -2 Downtown Mound TIF 1 -3 MHR Water Fund Sewer Fund Liquor Fund Recycling Fund Storm Water Utility 1,061,672 112,240 161,525 900,147 200,811 67,515 74,072 126,739 53,300 2,624 4,724 48,576 1,500 27,208 27,208 (25,708) 1,579,357 253,261 1,786,799 153,632 598,624 54,903 221,407 14,558 354,270 -859:.7,128 276,615 1,302,742 291,660 1,495,139 74,250 524,374 14,843 206,564 58,961 295,309 15.21% 36.89% 8.86% 17.51% 16.32% 12.40% 6.70% 16.64% • City of Mound oil shllrivestmets Balances by Fund At ihe. Erid.o M3irch 2Q1' 1 FUNDNAME $_A' ibunt' General Fund 720,649 Park Dedication Fees 13,075 Area Fire Protection Services 374,502 Dock 334,128 Mound HRA (971) G.O. Equip. Certf. 2004 - C G.O. Equip. Card. 2005 - C G.O. Equip. Certf. 2006 - C 94 G.O. Equip. Certf. 2007 - C (18,399) G.O. Equip. Certf. 2008 - D (23,699) G.O. Equip. Certf. 2009 - C 31,575 Mound Transit Center Series 2006 59,382 G.O. Bonds 2001 - C (359,436) G.O. Bonds 2003 - C TIF 1 -2 323,240 G.O. Bonds 2001 - A (147,951) G.O. Bonds 2003 - A (2,091,150) G.O. Bonds 2004 - A (1,469,998) G.O. Bonds 2005 - A 292,183 G.O. Bonds 2006 - A 298,827 G.O. Bonds 2007 - A 289,372 G.O. Bonds 2008 - B 242,912 G.O. Bonds 2009 - A (47,702) G.O. Refunding Bonds 2011 - A 5,345,387 Taxable G.O. TIF Bonds 2009 D 108,031 • HRA Lease Rev Bonds (211,991) Capital Improvement 131,235 MSA 509,394 Sealcoat 68,345 Downtown TIF 1 -2 63,910 Downtown TIF 1-3 MHR 117,410 Water (965,021) Sewer (2,914) Liquor Store (349,928) Recycling 3,574 Storm Water (1,412,917) 79,450 Note: The above schedule shows the combined cash and investment balances by fund for the months indicated as recorded in the General Ledger. The balances do not reflect receivable, payables, authorized transfers, encumbered funds, or dedicatedireserved resources, etc. Only some accrued transactions are reflected. Investment income will be distributed to the funds at the end of the year and is not included. A long and complete process is followed to record all transactions, before we close the books, at the end of the year. In addition, the audit from the independent auditor is performed and an official Comprehensive Report Will be presented to the City Council and made available to interested parties. In no way this schedule is intended to represent balances of funds • available for spending. :.1 CITY OF MOUND BUDGET REVENUE REPORT MAR 2011 25.00% MAR 2011 YTD PERCENT BUDGET REVENUE REVENUE VARIANCE RECEIVED GENERAL FUND Taxes 3,901,424 - - (3,901,424) 0.00% Business Licenses 17,800 3,000 5,500 (12,300) 30.90% Non - Business Licenses /Permit 126,100 10,862 20,423 (105,677) 16.20% Intergovernmental 134,060 - 15,000 (119,060) 11.19% Charges for Services 79,600 840 63,768 (15,832) 80.11% Court Fines 55,000 3,405 8,167 (46,833) 14.85% Street Lighting Fee 250,178 18,383 54,642 (195,536) 21.84% Franchise Fees 397,000 10,735 22,270 (374,730) 5.61% G.O. Equipment Certificates - - - - #DIV 101 Charges to Other Dpts 12,000 2,377 3,789 (8,211) 31.57% Park Dedication Fees - 5,400 5,400 5,400 0.00% Other Revenue 273,950 5,525 45,971 (227,979) 16.78% TOTAL REVENUE 5,247,112 60,528 244,929 (5,002,183) 4.67% FIRE FUND 1,061,672 42,374 127,121 (934,552) 11.97% DOCK FUND 176,115 112,422 312,814 136,699 177.62% MOUND HRA - - - - #DIV 101 WATER FUND 1,580,256 114,785 341,574 (1,238,682) 21.62% SEWER FUND 1,387,775 112,965 338,586 (1,049,189) 24.40% LIQUOR FUND 2,800,000 185,925 524,471 (2,275,529) 18.73% RECYCLING FUND 225,276 16,247 48,438 (176,838) 21.50% STORM WATER UTILITY 437,500 29,509 87,499 (350,001) 20.00% INVESTMENTS (Net of Expense) (239) 856 856 • 4/12/2011 CITY OF MOUND BUDGET EXPENDITURES REPORT • Mar. 2011 26.00% Mar. 2011 YTD PERCENT BUDGET EXPENSE EXPENSE VARIANCE EXPENDED GENERALFUND Council 77,960 3,655 16,143 61,817 20.71% Promotions 73,000 - - 73,000 0.00% City Manager /Clerk 312,053 23,290 64,804 247,249 20.77% Elections 2,650 - 1,892 758 71.40% Finance 301,783 20,703 59,017 242,766 19.56% Assessing 95,600 9 13 95,587 0.01% Legal 131,500 9,690 18,076 113,424 13.75% City Hall Building & Srvcs 110,100 5,298 15,599 94,501 0 14.17/0 Computer 40,700 2,941 11,361 29,339 27.91% Police 1,932,171 163,849 432,643 1,499,528 22.39% Emergency Prepardeness 8,150 26 948 7,202 11.63% Planning /Inspections 310,619 19,370 50,155 260,464 16.15% Streets 715,439 55,001 140,954 574,485 19.70% Parks 479,199 33,697 143,323 335,876 29.91% Park Dedication Fees - - - - #DIV 101 Cemetery 11,100 - 954 10,146 8.59% Recreation 2,500 - - 2,500 0.00% Transfers 559,000 42,374 127,121 431,879 22.74% • Cable TV 47,492 - - 47,492 0.00% Contingencies 36,800 125 125 36,675 0.34% GENERAL FUND TOTAL 5,247,816 379,928 1,083,128 4,164,688 20.64% Area Fire Service Fund 1,061,672 70,962 232,487 829,185 21.90% Dock Fund 200,811 7,026 81,098 119,713 40.39% HRA Fund 53,300 4,661 9,385 43,915 17.61% Capital Projects 1,500 65,922 93,130 (91,630) TIF 1 -2 Downtown Mound - - - - TIF 1 -3 MHR - 378 378 (378) Water Fund 1,579,357 44,118 320,733 1,258,624 20.31% Sewer Fund 1,786,799 107,341 399,001 1,387,798 22.33% • Liquor Fund 598,624 32,118 106,368 492,256 17.77% Recycling Fund 221,407 14,556 29,399 192,008 13.28% Storm Water Utility 354,270 -862,:06 62,667 291,603 17.69% DOCKS AND COMMONS COMMISSION MEETING Thursday, March 17, 2011 Present: Chair Jim Funk, Vice Chair Mark Drahos, Commissioners Susan Gardner, Rodney Beystrom, Cliff Schmidt Excused: Council Member David Osmek Other Present: Public Works Superintendent Jim Fackler, Dock Administrator Katie Hoff Public Present: John and Linda Verkennes Chair Funk called meeting to order at 7:00 p.m. 1. Approval of Agenda: MOTION by Funk to approve;agenda as carried unanimously. 2. Approval of January 20, 2011 MOTION by QjWorn 1 Drahos. fAMN carri 3. Comments anallighmill 4. Discuss: Public Lands nimou by Drahos. MOTION 11 minutes as written. SECOND by present: None for 4771 Island View Drive Fackler, summarizedvthe public lands permit packet memo for the proposed stairway in the sa pe footprint of the existing deteriorating stairway. Staff recommends app�rdval of this permit with conditions noted in the packet.memo including, but not limited to comments from Staff and construction of the proposed stairway /landing to meet the requirements of the building code and zoning ordinance. Rodney Beystrom referred to building code as it relates to rise /run, width between railings and handrail height. John Verkennes agreed to make the changes required to meet the building code for the stairway. MOTION by Funk to approve the staff recommendation with the changes noted. SECOND by Drahos. MOTION carries unanimously. • C7 • 5. Discuss: Dock /Slip Lottery for 2011 • 1) Jerry Wahl 17) Dan Monahan 2) Alexander Foss 18) Travis Mills 3) Chris Sehnert 19) Kyle Schumacher 4) Shannon Fischer 20) Chris Sankey 5) Kara Peterson 21) Nicholas or Laura Cox 6) Tracy Hvezda- Lehtola 22) Matt McNeil 7) Brian Lieder 23) Chris Cox 8) Robin Baumgartner 24) Scott Beckman 9) Rod Pettit 25 ichael Nelson 10) Jeff Harrison Dan Boll 11) Sherry Weise Stacy Anderson 12) Ann Winters 28 ike Klimasczewski 13) Art Witschorik 29) n or Dale Portz 14) Don Staerkel 30) K ine Turpin 15) Mark Dummer 31) Kelly ring 16) Larry Anderson 6. Review: Calendar Funk noted that the April cal r ap, financial reports and fee discussions. Hoff asked the co sion ve any fee suggestions that • they'd like to see.,staff run the re ects. plans to bring back prior years idea of sip'fees barsd on sli . Slips that are larger simply cost more to purchase grid maintain thi smaller s. Discussion followed on situations where peopl.rrant a largrsl�p now i pe they may get a larger boat at some futur time; which makes i #`artily r t,.p ce people with larger boats from the our multiples. OTION by Fu accept the calendar as written. SECOND by Beystrom. TION carries imousIV. 7. Repo City Counci esentative: n /a; Osmek not present. Staff: Fackler noted that Dreamwood riprap Phase 2 quotes were very favorable and work will begin in Fall 2011. Concept Landscaping's work on Phase 1 was of larger stone than the specifications called for and looks good. Dock and Lift also uses larger rock so it should blend well. Hoff stated that the Dreamwood Settlement Agreement is set to be fully implemented next season and staff has been meeting with the non - abutter • group representatives regarding seniority issues. Shortly, staff will be meeting with both abutter and non - abutter group reps to begin dealing with implementation issues and a few issues that the Agreement may not necessarily address. • Fackler stated the Parks staff is building 47 new dock sections that will be installed on Three Points area complexes. Parks staff is re- staining 37 dock sections. Commissioner Comments: Schmidt asked about renewals for the dock program. Hoff stated there were less than normal openings in the dock program and more than the normal number of openings in the Villa complex. :. • • • • • PARKS AND OPEN SPACE COMMISSION MEETING MINUTES Present: Not Present: Others Present: Thursday, April 14, 2011 Acting Chair Josh Dunwoody; Commissioners Sharon Holden, Derek Goddard, Todd Peterson; Council Rep Heidi Gesch. Mike Wilkus, Robert Brose Public Works Superintendent Jim Fackler, Temporary Chair Dunwoody called the meeting to order at 7:00 p.m. 1. Approval of Agenda: MOTION by Gesch, seconded by MOTION carried unanimously. 2. Approval of March 3, 2011 Meeting MOTION by Gesch, seconded by Holden, to MOTION carried unanimously. approve the agenda as written. 3. Comments 0ns from citizens present on None minutes as written. 4. Discuss: 201 et /Ezp 50ftures /Capital Outlay item not on the agenda: Fackler reminded the co NONo-ncludes n that Capital Outlay requests are due early; most likely June. Capital any fixed item over $1,000. He will submit anything that the Commission requests. 5. Discuss: 2011 Park Tour Planning Park tours need to be accomplished and results submitted to the City before May 5 th 6. Review: 2011 Calendar Add to May 12th: Park Tour information and Spring Clean -Up Discussion MOTION by Holden, seconded by Peterson, to approve Park Tour and Spring Clean -Up calendar additions. MOTION carried unanimously. 7. Reports: • Gesch • Step To It Challenge • Farmers' Market and More starting on May 14th • Allied Waste is doing a spring clean -up on April 23rd • Street lighting project done in 2010 ended at Kirby's Bait; will now be extended to The Depot • Electricity is being extended into Mound Bay Park Fackler • Backstop at Swenson Park will be replaced • Park dedication Fund information is in your Oak • Bathrooms were to be open by the 15th,' e's an issue with the locks • Skate Park will be open when mainte 'h en done • Depot building is being reroofed this week by Sel Commissioners � • Holden discussed the Community Garden at Bethel Ch (handout) MOTION to adjourn b Gesch sew ded b Holden; MOTION a 1 Y y pproved R Meeting adjourned at 7:53. • • Medi-i-com, Theresa Sunde Community Relations Coordinator Via USPS April 14, 2011 Dear Community Official: On or around April 21St, we will be adding the following to our digital tier: 0 WUCW Count ry TV Channel 108 Mediacom is pleased to be your cable television provider. If you have any questions, please feel free to contact me at tsunde@mediacomcc.com. . Sincerely, Theresa Sunde • Mediacom Communications Corporation 1504 2nd Street SE • Waseca, MN 56093 • 507- 835 -2356 • Fax 507- 835 -4567 • RECD APR 2 0 2011 Sarah Smith From: —dadak.A.{ on Sent: Wednesday, April 20, 2011 12:07 PM To: Sarah Smith Subject: Re: Ex. Summary Addendum and Attachments - Porta del Sol To Sarah Smith and Mound City Council, Please withdraw Porta Del Sol Inc application for CUP Restaurant classifacation change. Thank You Michael C. Regan • IDT-31 Plan for the site cleanup: 1. Semi Trucks and Trailers will be removed from the property by April 301h (end of the week) We have just recently expanded our operations into Delivery service and the new site for the trucking side of the operations has not been acquired yet. We understand the concern of the city that the site looks "crowded" by the big trucks and arrangement has been made with Metro Storage to move the Semi - Trucks there and store them there on the monthly basis. 2. Boats, trailers and other recreational vehicles are moved off site and are not for sale on the property. The only trailers that are located on the property are used in conjunction with the business to move the vehicles to and from the auction as well as delivery of the vehicles to our customers. Trailers and car dolly are located behind the shop by the storage area. There is still one sail boat on the property (located behind the building, not visible from the surrounding areas) and it will be moved off the property also by the end of this week. 3. Mechanical Parts and Vehicle Body Parts removed off the property or stored in the enclosed area. The engine in one of the pictures was delivered in the "off hours" and was designated to go to my mechanical shop in Minnetonka located on the corner of Excelsior and Baker Rd. We had moved it for storage inside the shop right now. The Cab in the picture was purchased by one of my customers for his truck and he never came through to pick it up, so we will be disposing of it through a metal recycler.