Loading...
2005-09-07 SpecialPLEASE TURN OFF AT CELL PHONES & PAGERS IN COUNCIL CllAMBEllS. .~ .... f~ .' . AGENDA *Consent Agenda: Items listed under the Consent Agenda are considered routine in nature and will be enacted by a single roll call vote. There will be no separate discussion of these items unless a Council Member or Citizen so requests. In thctt .o'eent the item will be removed from the Consent Agenda and considered in normal sequence, Open meeting Discussion 'of the Docks Program fees A. Raise fees to maintain $100,000 fund balance B. DCACapprove fee raise Discussion of fees for Villas on Lost Lake Developer' s Cost Benefit. Analysis (CBA) Staff s response m the CBA Dredge Escrow Balance Sheet Dock Replacement Balance Sheet Adjourn Pag~ 3 4 5 6 COST BENEFIT ANALYSIS FOR THE 37 NEW CITY OF MOUND SLIPS AT VILLAS ON LOST LAKE Cost Element & Cost per Slip Developer/HOA City of Mou md Associated $ Cost per Slip ,Cost, per, Slip Non- Recurring Build 37 new slips $11,486 $11,486 $0 @ $425,000 (1) . .. Dredge area for $5,270 $5,270 $0 slips @ $195,000 Mitigation for $4,054 $4,054 $0 dredge permit @ $150,000 .... Total N/R $20,810 $20,810 . $0 Recurring ..... Annual in-out $0 $0 $0 Annual routine $175 $175 $0 maintenance @ $175/slip(2) Weed Control @ $54 $54 $0 $2,000 (3,) Annual inspection $25 $0 $25 @ ½ hour per slip Annual fee per slip$300 $300 ($300) @ $300 Annual reserve for $135 $135' $0 channel dredge @ $25,000 .(4) . Annual reserve for $41 $41 $0 slip repair @ $1,5q0 ,, Annual reserve for $477 $477 '$0 slip replacement @ $353,000 (5) Total Recurring $1,,207 $1,182 15275) (1) Includes power, water, iow level lighting, small storage box. (2) Includes water and electric bills. (3) Assumes two applications per season. (4) Assumes $200,000 channel dredge over 10 years with 25% to HOA. (5) Assumes 20 year slip life with routine maintenance. Notes: a. Non- Recurring cost elements do not include the cost of the land acquisition to make the project financially viable; if these costs were included then the cost per slip would increase by $16,216/slip to $37,026. b. Annual in-out costs are zero as the docks will remain in ali year round; other docks may have costs from $250- $1,000 for their in-out component. -3- Date: September 6,2005 TO: Mayor & City Council FROM: Jim Fackler, Park Superintendent RE: Villas on Lost Lake Cost Analysis This memo is in response to the Cost Benefit Analysis spread sheet that provided by the developer for Villas on Lost Lake. In reviewing the Recurring cost listed for the Home Owner Association I have the following comments; 1) Annual Routine Maintenance of $175.00 per Slip. With all the amenities that are to be provided with the Villa dock complex this cost is to be expected. In relationship to the existing City Multiple Slip Docks these costs are not applicable due to the City not having water, electric, storage boxes and canopies. This expense should be reduced to minor repair such as decking. 2) Weed Control of $54.00 per Slip. Weed control is not performed around any of the current City Multiple Slip Docks. This cost should not be included at all in setting the cities slip fee. 3) Annual Inspection. I feel the $25.00 Cost per Slip for the City of Mound is underestimated in that the city is going to be doing Annual Reviews along with regulating a complex slip system. 4) Annual Slip Fee of $300.00 per Slip. This fee has not been determined. Annual Reserve for Channel Dredge of $135.00 per Slip. Staffhas estimated that amount needed from the Villas for a dredge in 15 years is $75,629.00. Please see the attached spreadsheet for Projected Escrow for Dredging. 6) Annual Reserve of $41.1}0 per Slip. This cost is based on the amenities not being provided on the City Multiple Slips. Annual Reserve for Slip Replacement of $477.00 per Slip. This figure is based on the replacement of a docking system that far exceeds the current type of construction on City Multiple Slip.Docks. The spreadsheet "Dock Replacement" is based on the developers dock system estimating the replacement in 20 years at $618,988.00. This figure is a lot higher then the $353,000 projected on the developer. Again, this high of an expense is based on a dock system with improvements well beyond the standard City Multiple Slip Dock. 0