Loading...
2018-04-17 CC Agenda PacketPLEASE TURN OFF ALL CELL PHONES & PAGERS IN COUNCIL CHAMBERS, CITY OF MOUND MISSION STATEMENT: The City of Mound, Trento teamwork and cooperation, provides at a reasonable coat, quality services Off respend to Ue needs of all cihzeng fostering a site, attrachve and tlounslung community. IM43 111 MOUND CITY COUNCIL TUES, APRH, 17,2018 —6:30 PM ANNUAL REPORTS WORKSHOP MOUND CM COUNCIL CHAMBERS Page 1. Call Meeting to Order 2. Approve the Agenda 3. Supervisors' Annual Reports to the City Council A Orono Police Department — Police NefCorreyFamiok 1-S B. Liquor Store— Manager John Colotti 6.14 C. Fire& RescuelEnergemyResponse—FireNefGregPederson 1537 D. Finance &AdministmtionDocksAdministration—Finance 38.40 DirectorlQerk/Treasurer Catherine Pausche E CommunityDevelopmen0lamung/Zoning/BrnldingInspections — 4143 CommurtityDevelopment Director Sarah Seth F. Public Works (Parks) Operations & City Projects .. Public Works 44- 56 Superintendent Ray Hanson & City ManagerM Eric Hoversten G. City ManagerlAdminishation 57.70 4. Long Term Financial Plan 71.88 S. Adjourn Orono Police Department 0 2017 Annual Report Response Time Analysis Priority 1 Calls 4.71 21395 Total Calls 6.82 81691 -2- on 70 60 50 40 30 20 10 0 a� sz � Part 1 Crimes �aQ� e� h�aJ kA ANP, Arm cyo� P -3- ■ Mound ■ Orono ■ Spring Park ■ Mtka Beach Part I Crime Summary Comparative statistical analysis, yrs 2016 and 2017 Homicide I 1 0% Rape 1 5 400% Robbery 0 1 100% Aggravated Assault 2 5 150% Burglary 15 18 20% Theft 159 136 -14% Auto Theft 8 11 38% Arson 2 0 -100% Total 188 177 -6 West Metro Drug Task Force Search Warrants Executed 77 Arrests 80 Firearms 19 Marijuana Seized 27,272 grams Cocaine/Crack Cocaine 877 grams Methamphetamine 22,716 grams Prescription meds/designer drugs 1,446 tabs/hits Narcotics Seized Cash Value $2,900,000.00 -5- Introduction to 2017 2017 was a benchmark year for Harbor Wine & Spirits! Following up the record year of 2016, Harbor Wine & Spirits hit a record high of $3.3 million in sales, with a gross profit percentage of %26! This translates into a bottom line profit of $248,297.00, which was an increase of roughly $40,000 from 2016. Non -labor operating costs were reduced to $234,645, a decrease from $260,769 in 2016. This was largely due to the one - time costs in 2016 of the new point-of-sale system and new web site. Total labor costs were $326,713. This was an increase of $9760.00 from 2016. This was forecasted due to the addition of the increased work week attributed to Sunday sales. Year-end inventory levels ended up (12.5%) between the Minnesota Municipal Beverage Association's recommended 15% outstate and 10% metro guideline. Gross profit % increased .75%, reflecting fiscal responsibility in purchasing and proper inventory management. M Harbor Wine & Spirits Annual Report for the year 2017 Report Prepared By: John Colotti, Manager Overview Harbor Wine & Spirits, Mound, is a municipally owned wine and spirits retail store located on the shores of Lake Minnetonka. Harbor Wine & Spirits was created to control the sale of wine and spirits within the City, and to generate revenue for the City of Mound. There is intense competition in the wine and spirits trade with two competitors that we would consider "local" equivalents in addition to two major regional competitors and one large national competitor located mostly in the metro region. Our success is based on several crucial factors including: selection, pricing, knowledgeable staff, store design, in-store displays, frequent tastings, in-store promotions, community leadership and multimedia marketing. Spring Customer Appreciation Wine Sale Annual sale held in February -March Held for the past 14 years, the Customer Appreciation Wine Sale has helped drive sales at the time of year that is post -holiday and pre - summer peak sales periods. The sale is primarily promoted through the -7- Laker/Pioneer and Lakeshore Weekly News, social media, as well as in- store bag-stuffers that go out the weeks leading up to the sale. Setting Harbor Wine & Spirits Customer Appreciation Wine Sale apart from our metro competition is our universal 15% bottle discount and 20% case discount (including mix & match cases) wine pricing. Most retailers present a limited listing of wines for their sales; subsequently new customers are routinely impressed when they discover all their choice wines are on sale during the sale. During the three week sale we have in-store wine samplings hosted by our wholesaler's wine representatives. We conduct the tastings on Thursdays, Fridays and Saturdays during peak customer traffic periods. The 2017 sale was held February 23'd through March 11th, and sales increased $9200.00 compared to the 2016 sale! Fall Wine Sale Annual sale in September/October This is the largest wine sale of the year, featuring 15% off by the bottle and 20% off by the case (including mix & match cases). Our key customers have informed us over the years that they mark their calendars for this sale and we make it easy for them to remember it by advertising in the local newspaper, social media and with bag stuffers. The 2017 sale was held October 12th through 29th and sales were up by $3326.00 compared to 2016! Repeal of Prohibition Sale December December 5th marks the anniversary of the repeal of prohibition and as we have for the last several years we jumped on board with a retro - sales event that was very popular with our customers. Our Anheuser- Busch distributor, Thorpe Distributing, worked with us to sell single bottles of Budweiser for 10 cents a bottle to commemorate the price back in 1933. This was also a great time for our customers to try something new as we had beer and spirits vendors offering samples from noon to 8 p.m. during the sale. For those attending we had vendor giveaways such as bottle openers, t -shirts, caps, bicycles and various other trade- related memorabilia. While the wine sales are a great time to buy wine, this one -day sale presents a great opportunity to get 15% off beer and spirits as well as wine. We are looking forward to the 2018 sale which will mark the 85th milestone anniversary of the repeal of prohibition. Arrangements are currently underway to secure vendor commitments. The 2017 sale generated overall sales of $17,000.00! Wine & Beer of the Month Each month we feature a wine and a beer of the month promotion. We negotiate special pricing through our vendors (which allows us to still M make a decent profit even during the spring and fall wine sale months when customers receive a 15 — 20% discount). Vendors produce both point of sale promotional material and a large window banner to heighten customer awareness. They commit to hosting no less than two in-store tastings during their monthly feature. We have found that this promotion results in profitable add-on sales. Senior Citizen Discount Program Working in coordination with our neighbor Jubilee Foods, we offer a 10% senior citizen discount every Tuesday and Friday which corresponds with their senior discount program. This promotion creates a "one stop shop" effect. Spirit of the Lakes Festival Beer Garden The Spirit of the Lakes Festival takes place in July each year and Harbor Wine & Spirits hosts and manages the beer garden. We work with the festival planning committee throughout the year to prepare for this major community event. This is an opportunity for us to reinforce name recognition and to support our community. -10- Wine and Beer Tastings Wine and food pairings are presented as a special event during the Spirit of the Lakes Festival. There are several tasting seminars offered featuring high-end wine. Event goers pay $30 per person to participate and received gifts such as wine glasses, t -shirts and similar promotional items. Attendees can place orders for the wine they've tasted for exceptionally discounted prices through Harbor Wine & Spirits for in- store pick-up. New to the 2015 festival was the Meet Your Maker Minnesota Craft Beverage Tasting, where we invited sixteen Minnesota breweries to participate. Since then, then the tasting has grown to feature 24 local breweries, distilleries and wineries. Each business is enabled to set up a table to pour and discuss their products, as well as hand out free promotional items. This provided an excellent chance for customers to actually meet the brewers and owners from their favorite local breweries! Oktoberfest Beer Promotion October 2017 In the month of October, Harbor Wine & Spirits celebrated their P annual Oktoberfest promotion. The celebration was amped up with traditional Oktoberfest music throughout the store played by professional accordion player Dale Grove, as well as in-store German beer samplings. The Westonka Rotary once again sold brats with sauerkraut in the shopping center parking lot. Customers in attendance - 11 - received a one -day -only 15% discount on not only our top German beers, but all beer within our vast inventory. Westonka Community and Commerce Organization - Membership Harbor Wine & Spirits is in a unique position, representing both the City of Mound and itself as a member of the Westonka Community and Commerce Organization (WCC). Through our membership, we are able to network with other local businesses and community leaders to promote our store and the City of Mound as a premier place to conduct business. Sunday Sales July 2017 July 2nd, 2017 ushered in a new chapter in our industry. The Minnesota State Legislature voted in favor of allowing the sale of wine, spirits and strong beer on Sundays. For the first time, on Sunday July 2nd 11:00a.m., we opened our doors for business. State law mandated Sunday business hours to be limited from 11a.m. to 6 p.m. We decided to have our doors open the entire Sunday allocation. During the warmer months of July, August and September, we witnessed a significant amount of customer traffic and interest. At the end of this "warmer' period, we saw a downturn in customer traffic on -12- Sunday. Along with the realization of greater customer convenience, we also realized that the new law did not create new customers, with the end result being the spreading of business out over seven days instead of the usual six. We have noticed slightly more customers shopping on Sundays, but not resulting in an overall increase in sales. Labor costs associated with Sunday sales was entirely part-time, regardless of the salaried contribution. This is based upon the fact that two to three, eight to nine hour shifts were added to the previous six day work week. Future Keys to Sustained Success 1. Management of controlled labor cost throughout the newly extended work week. 2. Fiscal responsiveness while managing inventory levels to maintain or surpass the 26% gross profit goal. 3. The continuation of providing value, customer service, proper inventory and the pursuit of innovative promotional events. -13- City of Mound 2017 Liquor Store Results Total $ 440,230.29 $ 442,463.18 $ 442,463.18 $ 455,007.54 $ 467,446.66 $ 502,952.51 $ 454,230.15 $ 460,161.79 $ 446,022.01 $ 431,882.23 $ 434,486.15 $ 392,059.20 Inventory Change from PY 5.84% 6.37% 6.37% 3.24% 2.85% 4.39% -2.16% 0.61% -4.42% -2.57% -1.70% 0.44% -March inventory amounts were not adjusted due an issue with the inventory software Monthly Inventory Levels -2017 Description January Description January February March* April May June August July August September October November December Liquor $ 169,670.36 $ 167,094.74 $ 167,094.74 $ 172,312.97 $ 179,894.93 $ 192,867.11 $ 100,490.00 $ $ 172,676.50 $ 175,410.50 $ 169,083.89 $ 162,757.28 $ 163,781.19 $ 151,372.66 72,327.00 Beer 84,236.16 84,684.03 84,684.03 88,469.11 96,042.12 144,119.00 107,201.34 105,649.00 87,721.59 103,659.93 101,154.57 98,649.21 98,901.32 80,753.52 65,221.00 Wine 177,535.25 181,104.48 181,104.48 185,301.19 182,427.13 71,658.00 191,787.70 76,498.00 178,417.94 165,090.26 166,617.42 168,144.58 162,918.07 151,768.70 3,803.00 Soft Drinks & Mix 6,454.93 7,010.17 7,010.17 6,781.35 7,091.69 585.00 8,873.96 3,376.00 7,447.32 7,909.25 7,018.75 6,128.25 6,801.53 6,340.63 3,206.00 Miscellaneous 2,333.59 2,569.76 2,569.76 2,142.92 1,990.79 1,392.00 2,222.40 691.00 7,966.80 8,091.85 2,147.38 (3,797.09) 2,084.04 1,823.69 301,499.00 Total $ 440,230.29 $ 442,463.18 $ 442,463.18 $ 455,007.54 $ 467,446.66 $ 502,952.51 $ 454,230.15 $ 460,161.79 $ 446,022.01 $ 431,882.23 $ 434,486.15 $ 392,059.20 Inventory Change from PY 5.84% 6.37% 6.37% 3.24% 2.85% 4.39% -2.16% 0.61% -4.42% -2.57% -1.70% 0.44% -March inventory amounts were not adjusted due an issue with the inventory software -14- S:\FINANCE DEPT\LIQUOR STORE\Reporting - NII\Liquor Store Inventory Comparison -2016 Monthly Sales -2017 Description January February March April May June July August September October November December Liquor $ 68,894.00 $ 67,178.00 $ 76,940.00 $ 77,573.00 $ 94,894.00 $ 103,638.00 $ 118,320.00 $ 100,490.00 $ 95,154.00 $ 86,016.00 $ 83,715.00 $ 105,154.00 Beer 68,488.00 72,327.00 80,178.00 89,794.00 106,406.00 123,139.00 144,119.00 108,588.00 105,649.00 93,700.00 88,583.00 99,164.00 Wine 56,634.00 59,565.00 65,221.00 63,634.00 66,540.00 65,305.00 77,493.00 71,658.00 66,224.00 76,498.00 68,615.00 85,464.00 Soft Drinks & Mix 2,972.00 3,277.00 3,154.00 3,803.00 4,662.00 5,303.00 6,565.00 4,666.00 585.00 3,637.00 3,376.00 4,994.00 Miscellaneous 479.00 1,007.00 1,079.00 1,294.00 3,206.00 4,114.00 11,498.00 3,071.00 2,165.00 1,392.00 943.00 691.00 Total $ 197,467.00 $ 203,354.00 $ 226,572.00 $ 236,098.00 $ 275,708.00 $ 301,499.00 $ 357,995.00 $ 288,473.00 $ 269,777.00 $ 261,243.00 $ 245,232.00 $ 295,467.00 Sales Change from PY 5.45% 5.63% 5.14% 1.98% 5.52% 8.91% 8.14% 7.00% 3.60% -0.09% -0.18% -5.72% Income Before Transfers 2017 2016 2015 2014 2013 2012 State Average HW&S HW&S HW&S OPERATING REVENUES Key Ratios 2016•• 2017 2016 2015 Sales $ 3,158,885 $ 3,046,511 $ 2,964,968 $ 2,919,732 $ 2,887,226 $ 2,835,506 YTD Cost of Sales% 73.92% 73.73% 74.52% 73.66% Cost of Goods Sold 2,329,113 2,270,289 2,184,124 2,158,289 2,148,246 2,136,309 YTD Gross Profit % 26.08% 26.27% 25.48% 26.34% Gross Profit $ 829,772 $ 776,222 $ 780,844 $ 761,443 $ 738,980 $ 699,197 YTD Operating Income % 8.82% 7.60% 6.52% 7.85% Gross Profit % 26.27% 25.48% 26.34% 26.08% 25.59% 24.66% YTD Inventory Tumovet 5.21 5.15 5.35 Operating Expenses $ 589,668 $ 577,723 $ 548,225 $ 540,987 $ 535,791 $ 519,965 YTD Days Sales in Inventory 70.12 70.86 68.18 Operating Income $ 240,104 $ 198,499 $ 232,619 $ 220,456 $ 203,189 $ 179,232 YTD Inventory as a % of Projected Sales 14.16% 14.47% 13.76% Nonoperating Revenues(Expenses) 2,495 7,843 365 22 89 INCOME BEFORE TRANSFERS $ 242,599 $ 206,342 $ 232,984 $ 220,478 $ 203,278 $ 179,232 **Most recent data available TRANSFER $ 130,266 $ 57,405 $ 59,493 $ 61,529 $ 63,515 $ 65,452 -14- S:\FINANCE DEPT\LIQUOR STORE\Reporting - NII\Liquor Store Inventory Comparison -2016 2017 Annual Repot 2415 Wilshire Boulevard Mound, MN 55364 Main: 952.472.3555 Fax: 952.472.3775 www.moundfire.com Vision Statement: It's our vision to be known as an innovative and progressive fire department. We are dedicated to the delivery of effective fire suppression, rescue services and quality fire safety education to the public. We strive to offer the best available education and training to our members. We are committed to providing an environment which fosters teamwork among members. We desire to have an atmosphere of open communication which promotes the health and welfare of individual members. This Annual Report is prepared for the Mayor and Councilors for the City of Mound, and also the Mayors and Councilors of the four other cities we serve. This report is also presented to and reviewed with our Mound Fire Commission members. -15- Mound Fire Department 2017 Annual Report This overview provides a summary of the Mound Fire Department activities, accomplishments, and goals met for the year 2017. General Note: the 2017 Annual Report is compiled for the Mayor and Councilors for the City of Mound, and shared with Mayors and Councilors of the other cities that we serve. Please contact Fire Chief Greg Pederson if you have any questions or comments about the information, or would like to discuss any of the topics. Section I. Introduction and Overview The year 2017 was an eventful year for the Mound Fire Department. In 2017, our staff was involved in the process of implementing our strategic plan designed to meet department goals. Our strategic plan focused on hiring, training, and maintaining our firefighter staff, placing new apparatus and equipment in service, all while working within our budget and long term financial plan. All department priorities are based upon a practical long term financial management plan. Our well trained and active paid -on-call firefighter staff remains our most important asset. The ever-present dedication and commitment of the Mound firefighters uphold the service quality provided by the department. The commitment of time, effort and job performance by firefighters continues to be substantial as shown in the detailed department activity reports included. In 2017 our staffing level increased from 37 to 39 firefighters, plus the fire chief. In 2017, five new probationary firefighters were hired, one veteran firefighter returned to active service, and four firefighters resigned or were dismissed. A significant statistic: over the past 5 years 24 firefighters with 360 years of cumulative service and experience have retired or resigned, while 20 firefighters have been hired and 4 veteran (retired) firefighters have returned to service. Our firefighting staff has made a significant transition to newer firefighters and a less experienced staff. -This is a major accomplishment in light of the recruiting and retention problem which is trending nationwide. Our Fire and Rescue call activity increased from 2016 levels. The emergency call outs in 2017 were 596 vs. 588 in 2016. The call activity level in 2017 was slightly above our five year average of 563. Weather extremes and other factors often determine emergency call volumes. Firefighter emergency response hours for the year were similar to 2016 levels. Our total firefighter emergency response hours in 2017 were 10,461 vs. 10,409 hours in 2017. A. Organization, Staff information, and Performance Measurement The Mound Fire Department consists of a very active volunteer paid -on-call firefighter staff. We currently have a staff of 39 volunteer firefighters, one full-time administrative assistant and a full-time fire chief for a total staff of 41. -16- The following points regarding organizational resources are supported by the documentation and charts included in the pages that follow. • In 2017, (4) firefighter resigned due to not being able to meet the department job performance standards. The primary reasons were work and outside time commitments. • Five new firefighters were hired in 2017. Two were hired in March, two in November and one more in December. As per the department policy, the new hires are on a intense training rookie program and serving a 1 year probationary period. ■ Fire and Rescue calls for service were steady, busy and at a consistent level in 2017. The department continues to be very active wits a total of 10,461 personnel hours spent working at fires and other emergency calls (activity report included). • MFD responded to 17 Mutual Aid requests in 2017 vs. 19 in 2016. We provided 434 staff hours for mutual aid assistance to other fire departments and cities. I expect mutual aid requests to increase in the future due to the continuation of statewide and national trend of staffing shortages at local area fire departments, especially during daytime hours. • Our department personnel response in 2017 generated an average of 19/20 firefighters per emergency call, which is a very high number of responders compared to many other volunteer or paid -on-call fire departments. ■ In 2017 our staff training hours was substantial at 3,059 hours of in-house training, and additional 1,012 hours of outside schools and training. The fire department staff is well trained and based upon a wide variety of call types, must be more diversified than ever. • MFD firefighters worked a significant number of hours doing maintenance and repair on apparatus, equipment, and fire station upkeep in 2017 for a total of 1,383 hours. • Public Relations and Fire Prevention events are important and a high priority. Our staff led or attended 52 events in 2017, and clocked a total of 685 staff hours. • The fire department staff, including fire officers and firefighters is a diverse and energetic group. Our staff has transitioned to a combination of both experienced personnel, plus new younger individuals, with approximately 421 years of accumulated job experience. • IMPORTANT NOTE: as of 12/31/2017, 42.5% of our firefighters have been on the department less than 5 years; therefore increased focus on staff training is a top priority and is critical to our long term success. Our firefighters, through hard work and dedication, continue to provide many volunteer hours, with a conservative estimate of all work by firefigiters in 2017 at 17,868 hours. S. Apparatus and Equipment In 2017, improved financial status allowed us to refocus our attention on implementation of our Apparatus Replacement and Efficiently Plan. Our expenditures on our Capital Improvement Plan, including apparatus and equipment had been very low for the past ten years due to budget and financial constraints. We were able to add new apparatus to our fleet in 2016 and 2017, and major progress was made by our Fire Administration and Apparatus Replacement Committee with regard to apparatus purchases and long term planning. Pa -17- ■ As our fleet ages, the annual cost of repairs of repairs has been steadily increasing and 2017 was a high cost/high maintenance year. Our apparatus and equipment budget of $20,000 was insufficient and our repair costs were $26,452.42. Our 1990 E -One Heavy Rescue Vehicle is now 27 years old and had several unexpected repairs including a generator rebuild, ignition module repairs and new tires totaling $12,429.17. • In 2015, a committee of experienced fire officers reviewed, evaluated, updated, and then made recommendations to reconfigure our Long Term (10 year) Apparatus Replacement Plan. The apparatus replacement committee evaluated all aspects and needs of our fire apparatus, while considering numerous factors. The Apparatus Replacement Plan is now well into the implementation phase and going ahead as planned. • In 2015, MFD received city council approval of $731,000 to purchase a new aerial ladder truck to replace the old ladder truck. The new E -One HP78 Aerial Ladder was placed in service in March 2017 and is very efficient and user friendly. The new E -One HP78 ladder truck responded to 87 callouts over a period of 10 months in 2017, vs. an average of only 12-13 times per year over a 30 year period for the old ladder truck. • The city council approved purchase of a new 2016 Chevrolet Suburban EMS Rescue truck at a cost of $42,451. The EMS Rescue truck was received and placed in service in May 2016. Again, utilization is high as the Rescue Truck rolled to 255 callouts in 2017. Ongoing Strategy: to continue to analyze and consider new concepts to meet our ever changing needs for fire apparatus and equipment. Our fire apparatus replacement program must consider all of the practical and available options for prudent and cost effective apparatus purchases. One strategy we have implemented is downsizing our fleet and/or purchasing more diverse apparatus. We have developed an "all inclusive" Long Term Budget and Financial Plan.... and we are now implementing and successfully working the plan. The Fire Commission is very active and involved in discussions pertaining to apparatus needs, replacement plan, financial feasibility, and future purchases. At our upcoming Fire Commission meeting (April 2018) the group will be discussion the existing Fire Contract and Formula, Long Term Financial Plan, Fire Reserve Fund Balance, and future CIP purchases. C. Facility — Fire Station The Mound Public Safety Facility remains ideal for our daily administration, staff activities, apparatus housing, equipment storage, training, and emergency response operations. The facility is now 15 years old. Some very good news is that the facility bonded debt payments of $282,940 will end in year 2023. This will help our fire department budget significantly. There are expensive facility repair and maintenance items that need to be addressed now, or in the near future. The repair items that need attention are listed on the CIP for Public Safety Facility. One major expense for 2018 will be the removal and replacement of badly worn concrete aprons at a cost of $40-$50K. Section II. Major Accomplishments and 2017 Priority Projects A. Finances and Budget The Mound Fire Department operating expenses for 2017 were under budget. Overall, all expenses were slightly above budget. The decision to spend over budget was planned and prudent, as described in highlights below. The bottom line account balance in the Fire Reserve Fund increased by $47,743 in 2017, which is a much higher $$ amount than was budgeted or forecasted. A summary of 2017 finances is included in this report. Refer to "2017 Budget vs. Expenditures Summary". Highlights of 2017 finances are: ■ The fire reserve account fund balance at the beginning of year 2017 was $457,205. The fire reserve fund balance increased by $47,743 in 2017 to a year-end balance of $506,248 • The fire reserve account actual balance of $506,248 (un -audited) is positive variance by $127,804 vs. Long Term Financial Plan forecasted fund balance of $378,731. ■ In 2017, the fire commission agreed to do an early payoff of existing G.O. Bonds on two fire trucks. The early payoff amount was $91,510, which reduced our fire reserve account balance but eliminates 3 years of bond and interest payments. • Donations and Grants have become a critical supplement to our yearly budget. In 2017, donations and grants added approximately $56,852 to our revenue. • Since 2003, MFD has received $272,804 in grants, which adds significantly to the reserve fund balance. A $14,220 grant from Firehouse Subs allowed us to purchase an AutoPulse automatic CPR Machine. • The 2016 General Obligation Bond Sale for the new Aerial Ladder Truck resulted in very good news. The budgeted principle and interest cost over the 10 year term was forecasted at a cost of $860,406, however the low net interest cost of 1.5365% resulted in a 10 year actual cost of $813,016. An unexpected positive variance on the bonds of $47,390. • There were no new apparatus or vehicle purchases in 2017 B. Organization, Administration, and Staffing In 2017, we continued to hire solid individuals as firefighter recruits. We hired and started to train five new probationary firefighters in 2017. In 2017 we also employed a new comprehensive psychological evaluation step to our hiring process. Our goal is to hire solid people that meet our department mission, customer service goals, and long term service tenure. Fire Officer and Firefighter Succession Planning: recruiting, training and retaining a staff of 40 firefighters are a major challenge and ongoing focus. Our firefighting crew remains the most important department asset. We have continually added necessary training programs and learning options (I.e., Blue Card Incident Command Class, and Leadership Academy) to continue to develop new leaders and ultimately fire officers. -19- Duty Officer Program Continues: in April of 2014 I implemented a Duty Officer Program which has been a huge success. During specific overnight and weekend hours for a total of 88 hours during the week a Duty Officer is on a scheduled shift. Since inception approximately 6-7% of our calls have been Duty Officer Only calls, meaning only one person responds to the incident. The Duty Officer Response hours for 2017, amounted to 42 staff hours vs. an estimated 798 staff hours if they would have been "All Call Page Outs" per the OLD system. Staff time and efficiency savings of an estimated 756 staff hour is the result. It is estimated that the duty officer program cost to operate for the 12 months of 2017 was a net increase of about $6K -$8K. Fire District Concept Plan: in 2016 the West Lake Minnetonka area Fire Chiefs initiated a study of fire protection services in in our west metro area. The study was completed and the area fire chiefs met several times in 2016-2017 about the possibility of forming a West Hennepin Area Fire District. The discussions focused on feasibility of a fire district, solving staffing concerns, improving training programs, possibly hiring a full time training coordinator. We did not proceed to hire a full time training coordinator in 2017. We did begin a joint "Leadership Academy" Training program in 2017 which includes the four fire departments in the grant study. This fire district concept may be the key to long-term success and cost effective fire protection services for the West Hennepin Lake Minnetonka area. C. Capital Improvement Plan, w/focus on Health and Safety and Apparatus Replacement Long Term Financial Plan (including all CIP and apparatus plan): one of our most significant accomplishments in 2017 was the continued implementation of the new Capital Improvement Plan (CIP) based upon our detailed Long Term Budget Forecast and Financial Plan that extends through 2024. The long term budget forecast projects all financial impacts: including revenue, operational expenses, capital improvement plan projects, pension plan funding, and revenue and expenses. This financial plan is a critical tool needed to supporting future operations and success. Apparatus Replacement Program: major progress was made towards updating our fire apparatus and support vehicles. We performed a needs analysis, created a plan, justified our needs, and finally began implementation of the plan with 2 major purchases (aerial ladder and rescue truck). Section III. Challenges for the Future The nationwide trends and struggles that many paid -on-call fire departments face today are related to the lack of recruits /volunteers and the retention of the same. There are a number of staffing and emergency response challenges that we anticipated in the very near future. The current Volunteer Firefighter Business Model brings an incredible value to the customers and residents. It is clear what a cost effective service the existing business model is, and it should be cultivated and maintained as long as possible. While the challenges are many, the primary concerns and my focus are on: • Recruiting, Training, and Retaining Volunteer Firefighters • Developing new department Officers and Leaders, to replace retiring fire officers -20- • Creatively and effectively managing volunteer staff time, and reducing personnel hours by utilizing new staffing models such as our Duty Officer Program. • Increasing the department budget, or reallocating funds and to achieve our goal of more capital spending which is needed to fund apparatus, equipment purchases, and firefighter safety initiatives. • Sharing services (mutual aid or other) among communities to insure cost effective, efficient, and high quality service. Section IV. Strategic Plan, Initiatives, and Accomplishments Back in 2004, I began a Strategic Plan Initiative with a focus on four key areas: 1). Personnel and Staffing 2). Budget and Financial Management 3). Apparatus and Equipment 4). Fire Station Facilities There are new plan priorities that will increase focus on personnel and staffing that will include: succession planning and staff development, expanding our training plan goals, and a substantial increase of attention on Firefighter Health, Wellness, and Firefighter Safety. Example: In the years 2011 thru 2017, we have appropriated $119,316 to upgrading our personal protective equipment for firefighters. This includes safety gear like: turn -out -gear, helmets, boots, gloves, and other important safety equipment. I am in the process of updating the fire department strategic plan for 2018 and beyond. This updated plan will correlate with our Long Term Budget and Financial Plan. The updated Strategic Plan will be based upon the Financial Plan, Capital Improvement Plan, Staffing Plan, Apparatus Replacement Plan, Facility needs, and possibly a Fire District. The newly updated 2018 Strategic Plan is a priority project that will be submitted and reviewed with the Fire Commission and City Council for approval. Section V. Summary The year 2017 was successful and a continuation of a transitional time for the Mound Fire Department. I feel our department accomplishments in 2017 were very significant. Although about 42% of our staff has less than 5 years of service, we have continued to achieve our goal of serving our residents and customers well by providing an essential public service at a low cost. The paid -on-call volunteer fire department business model is a very high value. ■ Our staff of firefighters and administrative personnel continues to be our most important asset and is being sustained as a key strong element. In 2017, numerous retirements of experienced firefighters have created staffing challenges, but we have managed to recruit and hire a group of new young enthusiastic talent. -21 - In 2017, our improved financial position has allowed us to focus on updating and improving our apparatus and equipment. We have made significant progress on apparatus and equipment replacement or upgrades over the past couple years and expect to continue with city official's support. We have a very functional fire station facility that needs some repairs that are known, anticipated, and borderline affordable. Our annual facility payment of $282,940 and bonded debt ends in 2023. This bonded de)t respite will improve our financial positon and relieve budget shortages. 2018 Priorities and Focus: Top 5 Priorities • Update the 2018 MFD Strategic Business Plan so it correlates with and supports the newly created a 2015-2024 Long -Term Budget Forecast and Financial Plan. • Focus on developing our entire staff, all of our Officers and Firefighters: through Training, Recruiting, Hiring, and Retaining Volunteers. • Evaluate our Long Term Capital Improvement Plan $$, consider and discuss options for advancing CIP purchases to improve our fire department operations and safety. • Greatly increase our focus on and attention_ to Firefighter Health, Wellness and Safety • Shared Services, Fire District, Expanding Services, and Continuous Improvement. Looking to the future, we anticipate improving ou--- department operations further by considering all options for partnering with Minnetrista, and other fire departments. A fire district concept would create an expanded fire service protection plan. A larger fire district partnership will lead to more efficient use of our fire staff, apparatus, and equipment. A fire partnership will likely be a financial benefit to the residents of Mound, Minnetrista, Minnetonka Beach, Spring Park, St. Bonifacius, Orono, and other West Lake Minnetonka area communities. In closing, a special thank you to our city officials, fire commission members, and citizens for their continued cooperation and support of the Mound Fire Department. Respectfully submitted, Gregory S. Pederson Mound Fire Chief 12 April 2018 -22- 14, %0 41 M LO z lf) SIMU C co N N w O O� CO O4 00 O� O� 00 00 O� OO 00 00 00 LL -aO 0 0 0 0 0 0 0 0 0 0 0 0 0 Q N N N N N N N N N N N N N N E 0 1 NN 1 I N 1 N 1 N I N 1 N 1 N 1 NN 1 1 N I N I N I N Z V F-1 N -fl Y Y N L O L U �U WEWOW L V _ y 4. C LL Ol Ol A O LL CL N %` } O O N 0) L L O Y o L xn U OOHhCO O C3 N -CLO- L c N cm cmtiVZCL o S Q ¢ O h 4- N N N C �ssssv, s V V V Vi N N V) V)i N � LO %0 - r4 1-4 T--1 V --i LL Q Q Q i- .--� N Lo ,o 4- 4- 4- N 4- N 4- N 4-+�- N a w Q Q QrL N N N N N 4- V V V V io V V V V V _) -3 _) -I_ 3 Ui - 23 - N r -I O N O O O N O Lr) O Lr) O Lr) O Lr) O Lr) Lo RZI, RC* m m N N r -I r -I -24- r -I O N l0 r -I O N LO r -I O N d' O N m r -i O N O N r -I O N O r -I O N O1 O O N 00 O O N O O I N MOUND FIRE DEPARTMENT Seniorty List *Years of service is as of: 12/31/2017 1/8/2018 J:\admin\Administration, Staffing, Organization\Active lof2Vation\Seniority List - Current NAME START DATE EQUIP. # Yrs Svc * Chief 1 1 GREG PEDERSON 2/3/1975 18 Over 20 years 42.91 Asst. Chief 4 2 JASON MAAS 5/2/1994 32 I 23.67 Captain 16 3 MATT JAKUBIK 11/17/1997 37 y 20.12 Asst. Chief 3 4 TONY MYERS 5/4/1998 33 15 - 20 years 19.66 5 DARREN POIKONEN 12/19/1998 30 19.03 Captain 12 6 BRIAN BERENT 4/24/2000 1 17.69 7 STEVEN HENKELS 9/10/2001 2 16.31 Captain 14 8 MIKE MCCARVILLE 1/6/2003 35 10 - 15 years 14.98 9 MIKE FOLEY 5/10/2004 16 13.64 10 PAUL JOLICOEUR 5/10/2004 39 13.64 Lieut. 14 11 JASON RICE 7/26/2004 42 13.43 Captain 15 12 ANDY DRILLING 5/20/2006 25 11.62 Dep. Fire Marshal 13 BEN FOSTER 5/20/2006 29 11.62 Lieut. 11 14 BEN GOTTSCHALK 5/20/2006 26 11.62 Lieut. 12 15 BRYAN GORMAN 11/5/2007 21 10.15 16 MATT MORRIS 11/5/2007 44 10.15 17 AARON CRANDALL 10/5/2009 8 5 -10 years 8.24 18 SHAWN HAYES 10/5/2009 38 8.24 19 JEFFREY BRYCE 3/21/2011 46 6.78 Lieut. 16 20 NICK FARLEY 3/4/2013 52 Under 5 years 4.83 21 DANNY GRADY 3/4/2013 47 4.83 Lieut. 15 22 CHRIS HEITZ 3/4/2013 48 4.83 23 DANIEL PATTERSON 3/4/2013 51 4.83 Asst. Chief 2 24 GREG PALM 4/1/2013 15 (Retur i to Svc) 33.67 25 JEFF OTTENBREIT 7/21/2014 53 3.45 26 TANNER PALM 7/21/2014 54 3.45 Captain 11 27 TIM PALM 10/3/2015 17 (Retur to Svc) 28.24 28 DAN BERENT 10/3/2015 55 2.24 29 MICHAEL CATTON 10/3/2015 57 2.24 30 CARTER PALM 10/3/2015 58 2.24 31 MATT LINDER 4/4/2016 60 1.74 32 RYAN DE VEREAUX 9/12/2016 61 1.30 33 DOUG GAWTRY 9/12/2016 62 1.30 34 EDDIE VANECEK 3/6/2017 34 (Recur i to Svc) 25.98 35 ALEX ERICKSON 3/25/2017 63 0.77 36 BRENT KNUTSON 3/25/2017 64 0.77 37 BOB CRAWFORD 11/6/2017 6 (Retur i to Svc) 0.15 38 BRAD CHINANDER 11/6/2017 65 0.15 39 J.C. MORALES 11/6/2017 66 0.15 40 JOEY BLACKSTONE 12/4/2017 67 0.07 *Years of service is as of: 12/31/2017 1/8/2018 J:\admin\Administration, Staffing, Organization\Active lof2Vation\Seniority List - Current Mound Fire Department 2017 Activity Report EMERGENCY CALLS DUTY TOTAL ALL OFFICER CALLS CALLS CALLS FIRE/RESCUE CALLS 2017 IN OUR PRIMARY SERVICE AREA 579 542 37 MUTUAL AID CALLS 2017 OUT OF OUR SERVICE AREA 17 17 TOTAL OF ALL FIRE/RESCUE CALLS IN 2017 596 559 37 INCLUDING MUTUAL AID FIREFIGHTER EMERGENCY HOURS DUTY TOTAL ALL CALL OFFICER HOURS HOURS HOURS FIRE/RESCUE PERSONNEL HOURS 2017 IN OUR PRIMARY 10,027 9,985 42 SERVICE AREA MUTUAL AID FIRE/RESCUE PERSONNEL HOURS 2017 434 434 0 FIRE/RESCUE PERSONNEL HOURS 2017 10,461 10,419 42 INCLUDING MUTUAL AID FIREFIGHTER HOURS BREAKDOWN FIRE/RESCUE PERSONNEL HOURS IN 2017 10,461 10,419 42 INCLUDING MUTUAL AID MAINTENANCE HOURS IN 2017 1,383 TRAINING (IN HOUSE) HOURS IN 2017 3,059 TRAINING (OUTSIDE) HOURS IN 2017 1,012 MEETING HOURS IN 2017 1,268 PUBLIC RELATIONS / FIRE PREVENTION 685 TOTAL VOLUNTEER HOURS FOR 2017 1 17,868 Q /**"1y @ 2 h10 o J g \ ¢ a $ � O(D/oen� e 0 ƒ—U)2%E=CN 2 � v CD "t, 0 $ q 2 q Cl) o ® q R — I k k$ CN g 04 / 0 / R q 0 04 ■ � N C" � � $ � \ 0 C4 N IT04 � \�/7� t- / o n — — 0 0 � E2\ko7i\q cu °° M. 2 � U C Z 4)U Im V 3 0k7RP-nc � R � � ■ 2 2 g/fn--tNo � o k J ■ I k k$ CN g 04 / 0 / R q 0 04 ■ � N C" � � $ � \ 0 C4 N IT04 E £ E k E �® E E t t 2 2 7 / f M M E E E° E E E E 3 3/§ a @ c c m a) a- E a) LL 0m 5 5 (D (D¥ 5 LL 3 = o r_c c a) a @ k 2 2// LL L E ■ f$ j -J2 2 f c 2 0 0 — 0 0 m o c c CL CL__ CL ƒ/w-j-j2/22m � / 2 2 2$%$ g 2 J I k L ■ V 2 � m k 0 k a m � V Q � § o � a) U $ % ± @ i a 2 U m 2 2 2 E// f Ak oe§ @00 < \a00\� k -27- k $ co C4 k Lo k 0 � 0 z \ \�/7� t- 0 � cu °° M. 2 � U / f 0 cmc= 3 E £ E k E �® E E t t 2 2 7 / f M M E E E° E E E E 3 3/§ a @ c c m a) a- E a) LL 0m 5 5 (D (D¥ 5 LL 3 = o r_c c a) a @ k 2 2// LL L E ■ f$ j -J2 2 f c 2 0 0 — 0 0 m o c c CL CL__ CL ƒ/w-j-j2/22m � / 2 2 2$%$ g 2 J I k L ■ V 2 � m k 0 k a m � V Q � § o � a) U $ % ± @ i a 2 U m 2 2 2 E// f Ak oe§ @00 < \a00\� k -27- k $ co C4 k Lo k 0 � 0 z : _ U c � @ � E 0 (D a) D a) � �_ cn � 0 c � � o -r- (D LL �| � C| C4 /|� ■ / &w �\ m o c o 2 o LL 0 0 L C k CN LO \ Lfl (0 o (C� Oo « O @c/c (0k � Q J g m$ 2 w# 0 7 2 — \ ■ w q LL? o¥ o¥ o L c LL 0 «� � - , � L \ * \ * \ * @ \ 2 / , \ \ / LO 2 = co w �LO v , � lc m R � CD � ■ 2LU $ or) 1.4, m c 2 o LL 0 < (),I00 . LO It � q coTMI $ � 0 \ + / * $ * @ o c o / 0 k 0 L C k \|2 2 k On� CN W C # I § 2 § / m k- 0 k m 0 ƒ 2 2 2 -L:-- 0 ok f k 2 \$ o c r 7 2 « w 3 c c C � / 3 3$ U)� -28- 2 2 F- W W = 02 W o V f' Q L U +r as Z d W a m W C DC W Q. w d L,L Z V :D C C0 d C � d E aW O N to NO p 'n o V) M, tt 'T 000 O't 0 f t 000 O(0 r M I� (f�0 O O _O N Lo O m CD O M N = N N N N r In LO r N M V) O Co co fA N M Cr) O M I� N O O N N h- r O U r rLO W Q to Z W 0- 0 O E2 o — � N 0 N � o U U) U U Y U mr EQU) W ❑U)wg W w QQ�awa N N N O( O co� r 0 0 0 (0 O 00 O O H N 7+W CO O 0 — � = C 2U)M:W -i d 2 O 0w0(nJLL W H W r Q LL W r O M O N I r 0 0 0 M O O r a O t O N N N O 0) M U 000 M N O to V L Lo (-O O O r O M N O O M( ti O r LO 0 co Cl) r O O = M M N 0 O (O (V O O Cl) LO O �- MOOO) (Da—)NN�MMMONOrNCDO�M O U r N M O ti r 0 N Cl) O �f O O O M N 0 0 LO O N 0 0 0 O 000 O t�0 m= r M r r N ql I. LL N w CO 0 Cl) O O O N N O O r C) '-t I-- O O O O r N M O M g U ` N Q. 0) N N N N U N S W V M J F- �_ () O �_ y O () o � O N N Q �_ N . �_ V o 'C H N LL LL u- 0) LL_ LL U) fl) c M U) C Q ❑ ❑ ❑ ❑ ❑ v C] .r Q m � O � ❑ � U ❑ m O Q a Q m Q D W O Q ❑ �+ t] O Z w w z Q > z Z O H Q U) U)i Z C0 to NO M CA N O O O M N M r N N U W Q Z W 0- 0 O E2 Y go � N 0 o U U) U U Y U EQU) W ❑U)wg W w QQ�awa W OU�LL U H 7+W W — — W C 2U)M:W -i d 2 O 0w0(nJLL W H W w Q 0 O O CO tD r N °a L $ O r O r g � v O Cl) O � d r a 0 N LD w O O N g E Q g g M N w U z Q z w U) H z W D Q w>° 0 U 0 w Z_ of U Z p J Q Z 0Q U W C3 m U ❑ Z z U ❑ Q Q Q Q J J < (� Q Q H Z g Q Z� W i LU LLI Q � � LU m n wLU z w a U) w Z w O D (D 0 r) C co 00 h r O N 0 O O O O O O O O O m d x x W C0 0) N r � O O r Cb N ,It r Ch O O r O O 00 N O O r O O O O r O O O O O O O O r r 0 T 69 O O O O O O O O O O O O O O O O O O OO O O O O 6) M h O 't 6) N 00 CD M N 01 O O O M N w CD O T O O O O O O Q (9 00 0 � Cp O I- O M C9 O O O d' = r O O N r M T r M T O O I CCf 'i d) CD O M M T M M h h CO 1, W N r 69 H-} Cf) 69 61k 69 N} 6R} N} 69 LL T 06 d +J (n �+ v (B Co (1) O Cf3 60. 69 (A fA 6q 6o!)- 60- Vj> 6R 6g T 69 O O O O O O O O O O 0 0 O O O O O O O O O O v N O LO 6) M h O 't 6) N 00 CD M N 01 O O O M N w CD O T O O O O O O Q (9 00 N O O O h T M M h T CO r 00 N CO r h O N r O N LO T T T r N ca co 0 0 LL T 60 r to (a m N O N h CO 1, W N r 69 H-} Cf) 69 61k 69 N} 6R} N} 69 T 69 o J 0 a o : N 7 m Q 0 0 0 0 0 o O o 0 o O r O d r CD O o h O rn -30- N O CO Lo Cn N r LO 0) h Cn d OO CA h N T C.0 � o N 0 O r O D o m v ti = W T N N ca co 0 0 LL 60 Vy to (a m N O N h CO 1, W N r � 10A N LL T 06 d +J (n �+ v (B Co (1) O 0 Co a� U d c O N O O O LL C U 0 U ca N O Q Q 43 O O Na — C:CL c Y = O U m 0- w in 0- T 69 J C J O a o : N 7 a Q z z Z N (n O p m U F ) c c O O ` N � 0 z N N O a- 0- -30- J J a a z z Z E E 7 0 � 0 z z LL C: m CLx a x LLQ oo �a l� > o N _ � o 0 r � D o m v ti = W O co N ca co 0 0 LL CC m N O N h CO 1, W r � 10A M T d v m _ 0 C m O N O O LL C N O O c i My Y = �_ a a O co h c v T c CL CV N U co d d co N V N O Q d 7 _ d1 x W h N � O O cli V - h Z E E 7 64 � C: m CLx x LLQ oo 00 l� > o N _ O N r � D o m v ti O N Q LL J F- LU 0 LU W w ti r O N F - Z mw G F- Q a LU 0 w w LL 0 Z D E co I* M O It -Irl 6F? z LL w w Cl) z w , w�/� V/ w 0 0 o rn� o am O O O O O 00 O ti r- a) 6 6 6 M It N N O CF) N M CY) O CO 00 N 00 0Y) O it T r T M r N 1 W J h J 2 m EF? w E9 E LL z Q O) O) O) O) E a) C C C a) O C o Q U a m o U Q Q Q I— N O O W W a) J m Lu W W W W 0 'C 'C � C� z �Z N o aaa 4- 4- D -o 4- a) to a G C C C L LL EL N I— co z '� z W W W W E O Q U C) U U c U c - a Q c M o z a) a) m m CI .2 O 2 2 m m U W0� o 0 0 0 O O O r T O T— Q H O r W a z M m m co cu W _r_ W LL = U o Zf0 L O V / A m N °) O c w LL � 0000 > o c o am O O O O O 00 O O O O O N N T T T O ui a) N N r O r O ' tG 0 > i U- F V/ LL N co > o c m w O 0 O O O 4 LU O O N O O M w CD Cfl f� U a) N N r O O ' 0) 0 > i U- F V/ LL a) W J W J 2 m w E LL z Q LLO N O o Q U a m o m Q Q Q O N O O (nT C r T m Lu T T T 0 'C 'C � U z �Z 06 aaa D -o to a c I— LL LL LL LL N I— co > o c m o 0 O 0 O O O 4 N O O N O O M w Esti z. U O > o c U (n Q O O O N O � oO O LU 00 O LL Q a) W CD Cfl f� U a) N N r ' LU 0 > i U- F V/ o E W J J_ :E 2 m -31 - 0 0 O O 46 ti O O 00 O T � I -- c: o O U a) U a c in C- a) C m C U o a) m CO U- Cf} (/> 69 U a)0) L L- a) a) O_ o w c E > Z3 -- E cn E O /� U V J a) c c O 0 = aa)) .o L a) J � U M O N O 00 C6 O > o c O O M O O O N oO O fl- 00 O O z T Cfl f� i� T r -31 - 0 0 O O 46 ti O O 00 O T � I -- c: o O U a) U a c in C- a) C m C U o a) m CO U- Cf} (/> 69 U a)0) L L- a) a) O_ o w c E > Z3 -- E cn E O /� U V J a) c c O 0 = aa)) .o L a) J � U M O N O 00 C6 O > o c Fn E o O a L L X -0=3 E O) O) m c c C C z -31 - 0 0 O O 46 ti O O 00 O T � I -- c: o O U a) U a c in C- a) C m C U o a) m CO U- Cf} (/> 69 U a)0) L L- a) a) O_ o w c E > Z3 -- E cn E O /� U V J a) c c O 0 = aa)) .o L a) J � U M O N O 00 C6 O C E t m CL. GJ GJ L LL a C 0 O E E E o Eu u o u v E u V w w m w c u >, t' 00 0 F 00 a1 V T ° v E E v E Y a`) C W W V W c c 3 O W C c Q C c v c O C m Vl n c '0 L 105, w u u w w u QLLC c C LL t LL C N Um m m z m m i 11 L°L u a z= _ o u a x x M x d' In O O O O 00 O O c-1 O O ul N O O ul m Ln 0 0 O M m o o C? o v m 0 O n . N O O O W vl m O O Lr,O O 01 m O O V C 00 n O N Ql .--I H ct w .-1 00 O N 00 w O 0) al w Ln N N Ln In Ln O m w Ln I- O r` l0" .--I V r -I V} '-1' N ID .1 "IT). .-i m '-I V N ID H Vl 14 rl VT ta VT Vl VT V} ut VT Vl VT VT Q V} VY (J ? U V a,) CK H `a C, E d w E0 a ° w EE Y c C N c tOJ 'C a) p " f0 U\ V La J 1 L N v (O m ~ vCOL E 9 N j V K N 2 N� O E E c t O` ` O V c .3 o v c u m v w ic0 O p V O VI �_ p C c � V C CO C0 m 0 w ° al (V 00 w w N O '2 Q N c C 00 C C O E W U V Vl K a) 0 O l7 'c 'c -6 Q vi w e 'c 'c �_ v a u o •� •� X m 1`O N 01 a] •m 'f` c O N H In U H v w c I- F- V V a u o v u F e v v c w v m y c v `w w v E E v a v `w j L V m m p f`o p Y L t L L L al U' ❑ L h0 0a m n- 4 V H Lpp 00 m 00 m m w LL ` 0O •1`Vi1 W V L L UI `/ 'N N al N -O a] MOal > J O N 00 00 U v N `/ `1 J J W 2 > E N CO U` N 0 Il Il J Q d Ql J J V U w LL LL Il (/) M LL n n r, n n h w w w w w w w w 0 Ln V1 IplO 000 O 00 O O O O O O O O O O N N N N N N N N N N N U— N N N N N M LM N M oq a IA N 0 W C: Q J Q O Pli U N Na c v o Z v o m a _ ? E C o a NvOJi c ° o U Z 2� u E w C c O O V v C vOi al o V m m U T m ut N v v C7 COO E O c c E c c v w o v m O 0 w O W al `D c V v. u C L O w u Q al = al E N c _ a '^ Q a v w Y o w m o w o VI W W W W `1 O` 2 ❑ U C LL ❑ Q N Y LL c t W Y c O" UCcJ \_ \ f0 W Q 1` Q Vl E \ V1 J x cmc cmc cmc G L G U mm x cm C S U x G `1 �:J Z) S d Q LL 3 x ccU1 < 0 0 0 0 o m mo 0 0 0 0 0 0 0 0 C o 0 0 0 o o O o 0 O o 0 0 0 0 O 0 0 0 O O O o O m 0 O O o O m N o 0 0 O Ln Ln 00 0 In 0 O w 't Ln V O L m O a N O n N' .--I m m Q VT 00 I 00 '- VT V? VT N VT 10 ID V} Vl N VY m H VT In Ln m V .1 .� N N V1 V? V) VT 0) m V? O m V? G0 T+' C a) a0+ C w NE ai t m E io c w V o - c aj C J E C N Q C o �a w r V = .�. o E a a) r1 C C U ha Ul Y Q _p 7 IO Q E N H E O W N E C C p C C E ? w > > a! m C C QJ Q p al a) wO' LL C f0 O u c Q v QU a o O Q~ o a o M N E v Q v m u 06 _ p aci N c off N N S m3: Y E w yam. L m L0D 2 c `O N N j LL 1 O E •L c O c 'c e°a v c m ea c E 0 o 00 Q w w c v ^n •o �' m v cc l7 v 3 0 o O 3 c •M v a w. ai v c r0 C7 12 � m c o m c v 0 u a� c w o '� o uv �--� F- 11 0 HO c V V G o C N C CO 1`6 C c ~ "..� E L L N N p u ti L 10 L Q O y o0 w al U' C— w N K 'u ? C2 O b0 C0 h0 O Q C C O by a+ C7 O Q _ L f0 CL 0 w M LL w a C O =2c G cc al G > m C N C N a 0 N w u > G N OQ W J LL c° G cc° Il = G m (D w G°O N m C wr V1 LL Q Il U J a O 00 v a m r+•m N N 0 m w v v m m i0 0 0 0 0 00 o O O o O O o 0 ryl N N N N N N N N N N N N N N N i E E E o Eu u o u v E u V w w m w c u >, t' 00 0 F 00 a1 V T ° v E E v E Y a`) C W W V W c c 3 O W C c Q C c v c O C m Vl n c '0 L 105, w u u w w u QLLC c C LL t LL C N Um m m z m m i 11 L°L u a z= _ o u a x x M x d' In O O O O 00 O O c-1 O O ul N O O ul m Ln 0 0 O M m o o C? o v m 0 O n . N O O O W vl m O O Lr,O O 01 m O O V C 00 n O N Ql .--I H ct w .-1 00 O N 00 w O 0) al w Ln N N Ln In Ln O m w Ln I- O r` l0" .--I V r -I V} '-1' N ID .1 "IT). .-i m '-I V N ID H Vl 14 rl VT ta VT Vl VT V} ut VT Vl VT VT Q V} VY (J ? U V a,) CK H `a C, E d w E0 a ° w EE Y c C N c tOJ 'C a) p " f0 U\ V La J 1 L N v (O m ~ vCOL E 9 N j V K N 2 N� O E E c t O` ` O V c .3 o v c u m v w ic0 O p V O VI �_ p C c � V C CO C0 m 0 w ° al (V 00 w w N O '2 Q N c C 00 C C O E W U V Vl K a) 0 O l7 'c 'c -6 Q vi w e 'c 'c �_ v a u o •� •� X m 1`O N 01 a] •m 'f` c O N H In U H v w c I- F- V V a u o v u F e v v c w v m y c v `w w v E E v a v `w j L V m m p f`o p Y L t L L L al U' ❑ L h0 0a m n- 4 V H Lpp 00 m 00 m m w LL ` 0O •1`Vi1 W V L L UI `/ 'N N al N -O a] MOal > J O N 00 00 U v N `/ `1 J J W 2 > E N CO U` N 0 Il Il J Q d Ql J J V U w LL LL Il (/) M LL n n r, n n h w w w w w w w w 0 Ln V1 IplO 000 O 00 O O O O O O O O O O N N N N N N N N N N N U— N N N N N M LM N M oq a IA N 0 W C: Q J Q O Pli N O O N N M Lf1 O O N N 0 0 0 0 0 0 0 0 C C C C 0 C 0 0 0 0 0 0 o Ln o Ln o Ln m cv cv r -i v} v} qj)- qj)- i yr -33- 34- Lake Minnetonka Fire District Concept: Form a fire district in the West Metro Area around Lake Minnetonka that would include 5-8 of the existing fire departments. Advantages: • Improved service through efficient resources utilization. ■ Financial consolidation and more consistency. • Standardization of documentation for all fire departments. • Much improved fire operations strategic planning. ■ Much improved fire apparatus financial planning. • Better, more consistent firefighter training. • Structuring administration effectively and efficiently. • Overall strategic planning for future. Disadvantages / Challenges: • Allocation of financial resources appropriately. ■ Current wage and pension incons-stencies. • Proper allocation and placement of fire apparatus and equipment. ■ Maintaining fire department identity. • Establishment of appropriate / acceptable organizational structure. Other Issues: • Future fire station study and placement. • Recruitment and allocation of firefighter personnel for stations. • Long term budget forecasting ana cost control. gsp 5-17-02 -35- Advantages: • Better overall strategic planning for future with longer term contracts. ■ Restructuring administration for effectiveness and efficiency • Financial consolidation efficiency and more consistency. • Improved service through efficient resources utilization. • Much improved fire operations, through strategic planning, and staffing. • Improved Capital Equipment and Fire Apparatus Capital planning. ■ Better, more consistent firefighter training. • Standardization of documentation for all fire departments ■ Utilization of existing facilities, apparatus, equipment, staff Challenges: ■ Allocation of financial revenue appropriately. • Current wage and Pension Plan inconsistencies. • Proper allocation and placement of fire apparatus and equipment. ■ Maintaining fire department identity and ownership. • Establishment of appropriate / acceptable organizational structure. Other Issues: Future fire station study and placement. Recruitment and allocation of firefighter personnel for stations. Long term budget forecasting and cost control Other assumptions or considerations as part of the Fire District solution: ■ The implementation time frame or start up date will be January xx, 20xx. ■ Full implementation will be a work in progress and will be an ongoing continuous improvement project. • One, all inclusive Fire Department District Budget will be submitted which will contain all aspects of the budget: Administration, Operations, Pension Plan funding, Facilities, Capital Equipment and Apparatus Plan, a combined Staffing Plan. ■ The overall Fire Protection costs will likely not be reduced, however core services will continue to improve, and certainly be more efficient and effective long term. • A 10 year contract agreement will be in place. • Fire Station Facilities: utilize the existing fire station facilities ■ Expansion and additional fire stations will be necessary in the future; stations will be built and operated by the Fire District. 2 -36- • Minimal Capital Apparatus or Equipment purchases required (short term) as we use existing apparatus and deploy or locate as necessary. • Full time staff needs will be evaluated, and more full staff will be budgeted. + The staffing models and fire department response protocols will change, utilizing more time conscious efficient methods (not a cost savings) such as Duty Officer, Duty Crews, and All Call paging concepts. Firefighter numbers will remain similar to current staffing levels, may fluctuate + or — 10 % depending on staffing models. ■ Computer Aided Dispatch "CAD Zones" will be evaluated, redrawn, and reconfigured as necessary to improve response times and efficiency. • Primary Protection and Geographical Fire Areas (which fire department "Primarily" serves the geographic area) will be redrawn and department response by CAD Event Types will be evaluated and reconfigured. a. Automatic Mutual Aid will be more prevalent and expanded. ■ All OSHA Laws and relevant NFPA Standards will be adhered to meet firefighter safety, response times, and service quality objectives 3 -37- MEMORANDUM Dale_ April 12, 2018 To: Honorable Mayor and City Council From: Catherine Pausche, Director of Finance and Administrative Services Subject: Finance/ClerWDocks Annual Report to the Council My first responsibility is the supervision of staff. The current personnel that comprise the Finance and Administrative Services Department include: NAME TITLE START DATE Collette Roberts Accounting Clerk/Payroll/Accounts Payable 03-12-99 Bocce Kress Public Works Admin Asst/Accounting Clerk 01-22-18 Noah Iverson Accountant 03-19-14 Kevin Kelly Administrative Services Coordinator 03-30-15 Mike Miller Pad -Time Docks Inspector Catherine Pausche Finance Director/Clerk/rreasurer 09-01-06 Some of the larger contracts I am in charge of include (listed by excitation date Frontier- Phone & Internet - Expires - Expires 11/3 0 2 0 21 Gillespie Center - 5 year +5 year extension expiring 2021 Abdo, Eick & Myers CPA Firm - Annual Audit - 2020 Hennepin County—Assessment Services- Expires07KHn020 Allied Waste — Curbside single -sort residential recycling — Expires 12/312021 SET — leaf and brush drop-off for residents — Expires 1 2/312 0 21 OPUS 21 — Utility Billing Services — Expires 0 3/312 01 8 Five Technology — IT/Network Support Services — Expires 12/31/2020 Kenneth Potts — Prosecuting Attorney— Expires 12/312020 City of Orono — Police Services — Expires 1 2/312 0 2 2 LMCIT— General Liability, Property, Auto and Workers Comp Coverage—Annual NFP/Healthpadners — Employee Health Insurance — Annual Attached is a list of accomplishments, efforts under way and goals/needs of each function I am responsible for. 38- n Finance Department Accomplishments —Annual Levy and Budget: Submitted budget with +2.5%general fund levy and a 2.00% overall levy increase. — Bonds: Since 2011, we have refunded bonds on an annual basis to achieve over $8.04M in interest savings without lengthening the term. The City did not issue bonds in 2017 and will be evaluating cash flow needs as part of the Long Term Financial Plan. —Technology: Upgraded the network and switches in 2015. Changed from Kaspersky to Sophos and added OpenDNS to improve security. Moved to VoIP phone system in 2016/17 which should produce significant savings in telecom costs. —Human Resources/Benefits: moved from large group to small employer health insurance market in 2017 and settled the 2017/2018 Collective Bargaining Agreement in March, 2018. —Implement credit cards at City Hall -fees paid by users. —Created a Housing TIF District for the Harrison Bay Senior Living Development Efforts underway, but not yet completed: — Developed and issued a Request for Qualification and Interest in a Townhome Development in the Mound Harbor District and are currently working on a purchase and development agreement with Homestead Partners, LLC. — Long Term Financial Plan -develop format for the next 10+ years that will incorporate planning for the next generation of streets and infrastructure, facilities maintenance and renewal, equipment, staffing and community amenities. Goals/needs of the department: — Policy Development —Continue to collaborate with Council and Management Team to come up with creative solutions to financial challenges. Ensure leaders are making informed decisions. — Audit --Implement the audit requirement to document specific internal accounting controls and internal controls in general. Create/update employee manual to ensure adequate communication of key policies and procedures. —TIF -- Coordinate the assembly of TIF documentation and ensure compliance with State statutes and optimization of the use of funds. Work with Planning Department and City Attorney to ensure proper execution of any developer agreements —Training/Staff Development —Update job descriptions and performance evaluations, continue cross -training and procedure documentation. Develop training plan and identify employee recognition opportunities. —Technology: Develop along -term technology plan and establish priorities. Conduct individual PC audits/maintenance. Get employee website up and running. Expand use of Laserfiche throughout the organization, identify critical systems and IT infrastructure needs to further automate processes and provide for disaster recovery. -39- — Procurement — Take advantage of cooperative purchasing ventures, review contracts with vendors, consultants and service providers to ensure we are optimizing our resources. CitV Clerk Accomplishments - Automated agenda packet production effective January 2018 - Managed the record retention schedule and conducted a shred day Efforts underway, but not yet completed - Continue with scanning documents to laserfiche and records retention management - 2018 Election, including early voting and a -poll books Goals/needs of the department — Formalize procedures, automate license application process where possible, develop task lists to ensure proper accountability. — Determine next generation of website, including on-line forms and access to property information — Compile City Policy Manual that will incorporate all individual department policies into one manual — Determine what to do in the next phase of the cemetery to provide for long-term sustainability Dock Administration Accomplishments - Trained New Dock Inspector Mike Miller - Implemented code changes including requiring non -abutters to moor a boat Efforts underway, but not yet completed — Continued rip rap construction projects in Devon Commons — Inventory stairways in rights of way, update multiple slip maintenance/replacement schedule, right of way maintenance, inventory dock sites/commons and evaluate whether license holder adequately maintaining — Dock map changes - explore where additional multiple slips may make sense — Execute new Slip Use Agreement between the City and Villas on Lost Lake Homeowners Association — Code changes under review Dock use area requirements - evaluate in order to relieve congestion and manage our number of licensed BSUs (boat storage units) into the future - need for setbacks, need to limit the number of watercraft per dock (abutters vs non - abutters), use of accessories and canopies, differentiate between motorized and non -motorized, dock material standards/upkeep Use of boat lifts at multiple slips Limit one dock license per residential property (excluding multi -family) Rental property rights (renter vs owner) Goals/needs of the department — Explore alternatives to the application process — multi-year renewals m n Mound Community Development Department Annual Report to City Council for 2017 The Mound Community Development Department is pleased to present the 2017 Annual Report to the Oty Council for review and consideration. BUILDING PERMDS. 2013-2037 permit Information Year Buildinapermit Valuadon 1017 224 28,030,913 1016 439 22,119,767 2015 380 $17,860,182 2014 350 $8,818,474 2833 199 $10,410,249 *ind�oem i kr arerbrmmn eovSenbr am reeuwy alaka (25)MM&were lssueJkr nn /re0k�nen[Lngkkmllybmes CODE ENFORCEMENT. The Community Development Department works with other City departments with regard to code violations and nuisance related issues. For example, the Public Works and Parks Departments assist with grading/erosion control and tall grass/weed matters and the Building Official assists with property maintenance and building code issues. PLANNING CASES. A summary of the planning cases from 2013-2017 is provided below: 2017 (33) 2016 (44) 2015 (26) 2014 (28) 2013 (35) 1 DEPARTMENT PROJECTS. Provided below is a list of projects which were undertaken and/or completed by the Community Development Department. It is important to note that several of these projects were done in cooperation and with assistance from other Departments/Consultants. • Annual City Council and Planning Commission concurrent meeting; also Planning Commissioner refresher and emergency management training • 2040 Mound Comprehensive Plan update process/activities Social Pinpoint (Community Engagement Phase I) Chapter by chapter review/discussion Land Use Plan and Parks Plan Open House (Community Engagement Phase ll) Planning Commission public hearing and City Council action authorizing distribution forsix month review • 2017 seasonal permit and approvals for Mound Farmers' Market and More • Evaluation and processing of special event/public gathering and musical concert permit requests for community events (i.e., Music in the Park, Moonlight Trail Night, Fish Fry, Spirit of the Lakes, Dog Days, Taste of Tonka, Running of the Bays, Tree Lighting, etc.); also permit review and issuance for special events sponsored by groups/organizations or private individuals • Staff and Planning Commission review and recommendation related to modifications to the Mound Harbor Project Area and TIF Plan • Amendments to City land use approvals for Indian Knoll Manor apartment remodel/addition and new townhome construction project related to modified storm water management system • Approval of amendments to City Code Chapter 129 (Zoning), City Code Chapter 42 (Nuisances), City Code Chapter 46 (Public Safety) and City Code Chapter 14 (Animals) • Dutch Lake Preserve assisted living project approvals including major subdivision -final plat; also development agreement and building permit issuance • Serenity Hill on Halsted Bay active senior condo project including major subdivision - preliminary plat, land use permitting and major subdivision -final plat; also development agreement (in progress) • Approval of amendments to City Code Chapter 129 (Zoning) related to swimming pool enclosure requirements • Approval of Eva and Abbie Addition including land use and major subdivision -preliminary plat and major subdivision -final plat project approvals • Preparation of park land /fee study and presentation to City Council • City of Minnetrista 2040 Comprehensive Plan update review and recommendation • Review of short term home rental and need for regulations (in progress/underway) 2018 PROJECT LIST AND WORKPLAN • Completion of 2040 Comprehensive Plan and preliminary review of implementation activities to include City Code Chapter 129 (Zoning), City Code Chapter 121 (Subdivision) and City Code Chapter 119 (Signage) • Development of inventory of publicly -owned land and development of policy for release/sale of City -owned parcels • Review of exterior storage and nuisance regulations (on-going) • Amendments to City Code Chapter 113 related to building code and property maintenance regulations • Review/study regarding pawn shop and massage therapy regulations 2018-2019 FORECAST. Staff continues to see increased development interest in and around Mound which includes infill areas, possible redevelopment sites, as well as the City's remaining downtown development districts, which Staff anticipates could bring several substantive projects to our community. For example, construction on the Trident senior living and assisted living facility that received project approvals in 2016 and 2017 is currently underway. Additionally, the proposed townhouse project in the Harbor District is also in the preliminary development stages following completion of the RFQ process and the City Council and HRA recent approval of Homestead Partners as the developer for the proposed project. SUMMARY. On behalf of the Community Development Department, our team would like to express our thanks to the City Council and Planning Commission for their dedication and commitment to our department and to the City of Mound. Additionally, we would like to thank the other City departments and consulting staff that have provided assistance and staff support throughout the year. As always, we welcome any suggestions or comments that the City Council may have. TABLE OF CONTENTS L Public Works Department 2017 Annual Report .......................... 1 - 7 IL Public Works Department 2017 Capital Improvements..................8 -10 III. Public Works Department Work Plan/Initiatives ......................... 11-12 IIS 1 CITYCITY O Public Works Department 2017 Annual Report 2017 At A Glance • The third and final phase of Tuxedo Blvd was completed in 2017 wrapping up a 3 -year effort. The delayed portions of Phase I (southend) and Phase II (North end) had wear course placed in early summer and Phase III wear course was completed in the fall of 2017. Minor restoration work and final punch list items remain for Spring 2018 • Bartlett Blvd and Cypress/Maywood projects included new curb & gutter, watermain, sanitary sewer forcemain. This work was substantially completed with wear course placement in summer 2017. Minor re -configuration of drive aprons and storm drain features remains in the Bartlett section of the project to be complete in spring of 2018. • Wilshire, Maywood, Hiddenvale, and Lynwood Street reconstruction was substantially completed in 2017 with asphalt wear course to be placed on these roadways in the summer of 2018. • The Lynwood Road (D-2) Lift Station was scheduled for complete rebuild in 2016. However due to the location of the lift station in the Hasbro/Tonka Toy remediation site this project had to be put on hold to work out construction agreements between Hasbro, the MPCA, and the City of Mound. This project was completed in 2017. • The 10 -inch water main loop from Avon Park to Tyrone Park was completed and put online in 2017. The Wilshire Blvd trunk watermain (16 -inch service to Island Park) was installed as part of the Met Council Island Park intercept and L-39 replacement project. The utility was put into service with the Avon Park under -lake loop in late summer 2017 and in combination allowed for removing the Island park stand pipe and Wychwood pumping stations from service. • Work commenced on relocating the C-5 (Commerce Blvd) lift station in cooperation with the Harrison Bay Senior Living construction project. All underground services and structures were placed with final grinding, pumping, controls and backup power equipment to be installed in spring 2018. The station will be cut over prior to completion of the development project and the existing station in the C.R. 110 ROW will be removed. • Staff continues an ongoing joint effort with MCES in continuing to resolve coordination and condition issues with MCES sanitary sewer interceptor system. MCES completed construction and commissioning of lift station L-38 on Westedge Blvd in 2017. • MCES continued progress on replacement of all interceptor facilities on Island Park. Work began on the second phase with the start of construction a new lift station at the intersection of Wilshire Blvd and Bradford Lane in fall of 2016 that continued through 2017 and will complete summer 2018. The project also included replacement of the Force main from the station to its discharge on Wilshire Blvd in front of the Fire Station and re- routing around/decommission of L-40 on the Brighton Commons on the end of 45- Manchester and removal of the old L-39 station in the north ROW of Wilshire Blvd. This construction is expected to be complete sometime mid -year in 2018. • MCES initiated work to replace the intercept under the Dakota Trail in fall of 2016 and completed all pipe placement work by fall of 2017. The temporary pumping station (T- 25) located just south of the trail adjacent Dakota Junction was removed from service. This project resolved many of the flow coordination conflicts that resulted in backup events during high-flow periods in the summer of 2014. Trail and construction area restoration including restoration of ROW and Parking areas behind Commerce blvd commercial buildings will complete in summer of 2018. Odor control investigation and work will address neighborhood complaints in spring 2018. Personnel There are 12 full time employees in the Public Works and Parks Divisions. The Superintendent's responsibilities include evaluation of employees, scheduling of work, delegation of projects and tasks, budget preparation, reports, determination of emergency call -outs, construction meetings, project inspections, purchasing of materials and equipment, answering questions, resolving complaints, etc. The past year has seen 3 departures from public works, two new hires, one carry over vacancy, two current position openings are pending, and two public works staff members have been given position re -assignments. The Public Works Director is in charge of the Public Works Department as a whole. There is one full-time Administrative Assistant for both Public Works and Parks Divisions. The MPCA requires that the City have at least one full-time employee with Class C certification in Water Supply Operations and one full-time employee with Class SD certification in Wastewater treatment. Certificates are renewed every three years. All employees receive continuous training and education at various schools, seminars and conferences. All operators maintain a minimum Class -B MN Driver/Operator license for their motor -vehicle work on behalf of the City. The city contracts with Safe -Assure to keep us in compliance with OSHA standards and regulations. This training is done bi-monthly. Along with this training, the city has a Risk Management inspection conducted by the LMCIT every year. There were no non-conformance issues identified by external agencies in 2017. Street/Fleet Division The primary function of the Street Department is to maintain and repair the city streets and storm sewer collection structures. This includes snow and ice control, salting, sweeping, clearing street right-of-ways of brush and tree limbs, bituminous patching, street preparation for seal coating, repair and maintenance of storm sewer catch basins, street sign repair and installation, curb and sidewalk repair, street lighting, equipment maintenance, installation and repair of banners and Christmas decorations, 12 parking lots, 28 cul-de-sacs, and 11 miles of sidewalks. During the winter months, it is the responsibility of the public works superintendent to determine when to plow and chemically treat the streets. The Public Works Superintendent depends on the National Weather Service, local weather reports for information concerning weather systems moving in our direction and the Police Department to keep staff updated on road conditions. The Public Works Superintendent will also periodically check the streets to determine if and when plowing and sanding may be needed or should begin. Waiting until it stops snowing before plowing is preferred, but in icy conditions trucks will be sent out as soon as possible. Personnel from the Streets Division, Utility Division and Parks Division are all called out to help with plowing. 2 -46- The city has 4 single axle trucks equipped with front plows, side wings, and sanders. In addition the city also has 5 four-wheel drive pickup trucks with plows, 4 1 -ton dumps with plows and sanders, 1 skid -steer and 2 snow machines for the 11 miles of sidewalks. The City of Mound contracted snow removal in the Central Business District with Beniek property Services for 2017. Right-of-way repair and maintenance begins in early spring. This includes repair of watermain break patches, storm sewer cleaning, and street sweeping. Street sweeping is a major time consuming task. The City has 2 street sweepers, 2 sidewalk brooms, 2 trucks for hauling, and 1 water tanker trailer. Following the normal winter season, street and sidewalk sweeping can take up to 3 to 4 weeks to complete. Once the sweeping is completed, preparation for seal coating projects and other street repairs begins. In 2017 the Street Division completed the task of realigning the current no parking map with a common sense approach to no parking sign location. As an example there are several areas in Mound where no parking signs and mailboxes are opposite from each other. This can cause issue with mail delivery if vehicles park in front of the mailboxes. City staff identified those areas and relocated no parking signs to the same side of the road as the mail boxes. The one caveat to this approach was the all the mail boxes had to be on the same side of the road for this to work. Over the past several years the addition of new fleet vehicles and equipment the public works has found that along with the efficiencies of the new equipment we saw the ability to downsize the amount of vehicles and equipment needed to certain jobs. In addition the servicing, maintenance, and major repairs of the new equipment was significantly reduced. Currently Public Works contracts servicing, maintenance, repairs and annual DOT's with Midwest Services which perform the work on-site up to 40 hours per month as needed. Significant enhancements to the department work spaces were made in 2017 including re - pavement of the shop apron, re -configuration of the bulk material bins at the Shop, reconfiguration of the storage yard spaces and construction of a tension -fabric structure for salt storage. These enhancement improved work efficiency, reduced material losses, improved environmental stewardship, and cleaned up the appearance of the yard spaces. These investments are greatly appreciated by the Staff! Utilities Division The City of Mound Utilities Division consists of 3 areas water distribution, sanitary sewer collection, and storm sewer conveyance. The Utilities Division operates much like a business. Revenues are generated from the sale of water to over 3500 customers, from meter sales, and service charges. Salaries, benefits, and operating expenses are paid from the revenues received. There are three budgets prepared for the Utilities Division; one for the Water Division, one for the Sanitary Sewer Division, and one for Storm Sewer Division. Line item expenses for each division do not vary much from year to year. The biggest percentage of the budget each year is for salaries, capital outlay, workers compensation, liability insurance, and the Met Council sewer charges. Water The City of Mound currently has 2 active wells and 1 inactive well with a combined storage of 750,000 gallons in 2 towers. Mound has approximately 45 miles of watermain. The city has inactive interconnections with the City of Spring Park at the Seton Bridge, and there are 2 with the City of Minnetrista. The Water Division is responsible for, among other things, meter -47- readings, tower inspections, and hydrant flushing. In 2017 the City of Mound pumped 213,779,000 million gallons of water. Every 3-5 years, the City's water towers are inspected for the condition of the coating and anodes inside the towers. The City contracts annually with KLM Engineering to inspect, remove sludge build-up, and make minor repairs to the city's two existing water towers. Activation of the two additional supply lines to Island Park and resulting improvements in flow volume to this service area have improved water freshness to the Island and across the network. As part of water quality best management practices (BMP) the city relocated the aeration water mixers from the de -commissioned Island Park stand pipe to the Evergreen tower; equipping it similarly to the Chateau tower. Other BMPs include implementing uni-directional techniques for seasonal flushing to more effectively remove oxidized sediments from mains and reduce rust problems for our customers. Staff continues to work with Village by the Bay Condominiums Association, Mound Market Place, and Lost lake Villas to flush the hydrants associated their private systems interconnected with City mains. In 2017 the city experienced 8 watermain breaks; up slightly from 2016 but no specific, new patterns identified. The 10 -inch main under Commerce Bvld from Grandview north continues to be a problem area. In 2017 the City of Mound again exceeded water quality standards according to the States Consumer Confidence Report. As a result of the wellhead protection plan implementation audit conducted by the Minnesota Department of Health the City of Mound once again satisfactorily passed the audit. Rewriting of the Wellhead Protection Plan was initiated in 2017 in accordance with MN Dept of Health requirements. As a component of well and source -water protection, as well as to ensure longevity of our existing well and groundwater supplies; Well 8 (Evergreen) borehole and pumps were pulled and completely inspected, redeveloped, and overhauled in late fall 2017. This timely work addressed wear and tear on the mechanical equipment as well as sand deposit issues that were being encountered with that supply. As infrastructure renewal shifts focus away from street reconstruction to include their underlying utilities, the Staff has re-evaluated capital investment requirements in future years to help reduce pressure on rate -funded enterprise accounts. Additional risk has been accepted by delaying certain identified system improvements from a 5 -year investment plan out to 10+ years in effort to control debt service growth against water funds. Sewer The Sewer Division is responsible for maintaining 30 sewer lift stations, which are checked twice a week, and sewer line inspection and cleaning. They also perform pump repair, electrical repairs, pump removal, and seal replacement. Major repairs are contracted out. The City's insurance company (LMCIT) has suggested a timetable to complete the cleaning of 60+ miles of sewer main in the City every 4-5 years equating to about 80,000 feet per year. The current sewer system was installed in 1964 and is largely composed of vitrified clay tiles; and therefore in need of constant attention, maintenance and repairs. In 2002, the city began televising the sanitary sewer system with a camera that enables us to detect problem areas. These efforts continued in 2017. Staff contracted with a vendor to complete cleaning and inspection of all of the Three Points sewershed. A manhole rehabilitation project was developed 4 -48- to address the significant findings of this inspection as well as address known points of clear water entry to reduce inflow and infiltration. In 2017, the City continued to make progress on the Inflow and Infiltration work plan assigned by the Met Council as a result of the 2014 flow exceedance events. This work included qualifying portions of the D-2 (2016) and C-5 (2017) lift station replacements, cleaning and inspection of the Three Points sewershed, and the Manhole rehab work that followed. As infrastructure renewal shifts focus away from street reconstruction to include their underlying utilities, the Staff has re-evaluated capital investment requirements in future years to help reduce pressure on rate -funded enterprise accounts. Additional risk has been accepted by extending the previous 5 -year plan for completing lift station reconstruction out to 10+ years in effort to control debt service growth against sewer funds. Sewer mains will continue to be inspected on a 5 -year rolling schedule to determine reactive spot repair and rehabilitation needs as they emerge. One area of note; with the increased popularity of wet wipes and Swiffer dusting cloths and like products the city's sewer system is seeing an ever increasing number of these types of products ending up in our lift station pumps. This type of pump clogging has the potential for sewer back-ups. However again the diligence of our sewer division in cleaning and maintenance of the city's 30 lift stations has to date prevented a serious back-up from occurring. This however is no guarantee of a back-up never occurring. This is an opportunity for the city to better educate its resident's about the potential hazards that could occur from the things that get flushed down the toilet. Storm Sewer There are 545 storm catch basins, and approximately 93 outlets. The storm sewer system is being upgraded through the annual Street Reconstruction Project. The city started a program for the cleaning of the storm outlets in 2008. Scheduled maintenance for cleaning the lines begins in the spring of each year. The City storm sewer system is very large with 584 catch basins, which are cleaned as time allows through various methods, and 84 sump catch basins, which are cleaned twice a year as time allows. While we still contract out the larger repairs, the storm water fees we now receive allow us to make yearly repairs and upgrades to the system. • In 2017 the City participated in a cost share project with the Minnehaha Creek Watershed District to istall passive treatment basins in Carlson park and restore shoreline buffering to improve solids and nutrient removal before stormwater is discharged into Seton Lake on Lake Minnetonka. • There were only repair and in-kind replacement works included in the 2017 Street Reconstruction Project. • The regenerative (vacuum) sweeper was rebuilt in 2017 to include re -configuration of the dust control system to allow for dry -sweeping which improves pick-up and collection of fine automotive dust, nutrient, and soil particles from the street. • Street sweeping is an important part of keeping the storm system and area lakes clean from street debris. The city has begun taking a more aggressive approach to street sweeping by sweeping more often than twice a year as was the practice of years past. "Enhanced" sweeping through the summer months with the newly -equipped regenerative sweeper removes substantial nutrient and fines from the storm system and prevents introduction to the lake. Im • The city has all -but eliminated the use of sand during the winter and is no longer part of winter road treatment except in very rare weather conditions. In the past more than 70% of the sand put down would end up in the storm system. • Significant effort to employ road salt BMPs have been undertaken as well. In 2017, all "big truck" material applicator systems were re -calibrated and extensive operator training was employed to significantly reduce the quantity of material used each storm event. Improved material handling and storage in the Shop yard also reduces the quantity of chloride that makes its way into the watershed. As infrastructure renewal shifts focus away from street reconstruction to include their underlying utilities, the Staff has re-evaluated capital investment requirements in future years to help reduce pressure on rate -funded enterprise accounts. Storm sewer investment has been temporarily refocused on low-Ocost BMPs and maintenance of existing facilities primarily using our Operations and Maintenance Staff. Only minor, cost share qualifying, or development -related improvements are being considered for the near-term future. As a component of renewing our Stormwater Pollution Prevention Plans and Municipal Separate Storm Sewer System (MS$) Permits, a more detailed analysis of the load -reducing impact of treatment devices installed during the past 15 -years of improvements that were embedded in street reconstruction work is needed. This analysis of impact will reveal when improvement or enhancement work needs to resume in order to remain on track with increasing solid and nutrient removal standards levied on storm sewer system operators. Parks Division The Parks Division is responsible for managing the 31 public parks in the city, various lakeshore commons and shore areas, the maintenance and management of the Municipal Cemetery, aspects of the Municipal Docks Program, Municipal Buildings, Transit Center Parking Deck, Surfside Park Depot Building, and the Veterans Memorial Plaza. The downtown Streetscape and Greenway provides one of the main entrances into the downtown business area of Mound. The Parks Division is responsible for maintaining this area, which is completed as a high priority item. In addition, the division is responsible for the inspection of weeds on un -kept grounds and hazardous tree removal from city property. The division is also responsible for the preventive maintenance of its small -engine and specialized equipment. Assisting in this effort are three full-time parks maintenance employees along with seasonal maintenance employees. The team also made frequent use of the Hennepin County Sentenced to Service labor party for completion of unskilled, labor -intense tasks. The Parks and Open Space Commission (POSC) functions as an advisory board for bringing recommendations to the City Council regarding relevant issues. The general level -of -service for our parks includes regular mowing, leaf removal, litter pick up, tree care, and periodic repairs of park furnishings and amenities. In addition, there are six beaches that staff maintains throughout the summer including weed removal, buoy maintenance and repair, sand leveling and replacement, and trash and debris collection. These maintenance activities provide a visual confirmation that the City of Mound has a commitment to the community's quality of life. Parks maintenance staff has been at the Island Park Garage since 1989. Following a 1987 engineering improvement recommendation report, a new roof was installed in 1990, and electrical updates, new garage doors and exterior painting were completed in 1991. Major foundation repairs and driveway reconstruction were completed in 2012. Continued use of this 6 -50- facility is envisioned transition from present use as active shop space to less intense seasonal storage in the future. The Staff undertook several initiatives to restore shoreline buffer environments and natural or native plant environments. Two spotlight initiatives include establishing a waterside meadow environmental feature at Crescent park on the Three Points Peninsula, and allowing re- establishment of a shoreline buffer at the bottom of the Highland End Park bluff. These demonstration projects have been well-received by their adjoining neighborhoods and exemplify how clean water shoreline BMPs can attractively add to the viewshed and natural habitats while doing their clean water work. A more robust approach to engagement from the parks Commission was employed in late fall 2106 with a full -Commission tour of all City Parks. This resulted in a more robust involvement in the Staff budgeting process to include shedding light on forthcoming necessary capital improvements. Budget and planning to replace the play structure at Sorbo Park was initiated in 2017 and the new structure will be installed as early in summer 2018 as weather will permit. The Parks Commission participated in a grant -funded tree sale in the fall of 2017. 78 trees were distributed to community residents for planting on private lands. 22 trees were planted by the City, primarily at Highland End park to create softscape separation between the sledding hill and snowmobile trail along the east boundary of the park. Hazardous Tree Removal As of December 31, 2017, the yearly total of hazardous tree removals from City property was 27 trees removed, 12 stumps chipped, 9 trees trimmed that posed a hazard, and 5 sites had brush removed. From private property, 4 trees were marked for owner removal due to hazardous conditions. Of the 4 trees 1 was contracted for removal by the City as forced removal. Diseased and hazardous trees are removed on a complaint basis. When a complaint is received, an inspection of the tree is done to determine the need for removal and the ownership. City owned trees are removed by a contractor as soon as possible, while private trees are removed in accordance with City Ordinances. Private trees not removed in the grace period allowed are force removed. The cost of a force removed tree is billed to the property owner. If this bill is not paid, it is then assessed to their property taxes for the following year. Citv Hall Maintenance/Janitorial The Parks Division is responsible for the seasonal lawn care and snow removal at City Hall. It is also responsible year-round for the heating and air conditioning inside City Hall and the Centennial Building. Parks staff is also responsible, within their capabilities, for the repairs to plumbing, heating and related equipment. Major repairs for the heating and air conditioning systems and cleaning services are contracted out through the direction of the Parks Division. Janitorial duties are contracted to an outside vendor. 7 -51 - IIS 1 CITYCITY O Public Works Department 2018 Capital Improvement Projects & Initiatives Street Reconstruction Projects • Cooperative Construction Project with MCES and Hennepin County to reconstruct Westedge Blvd, CSAH 44, force main, and water mains in the Westedge, CSAH 44 corridor from the MCES Pumping Station to the Priest's Bay Bridge. Retaining Wall Replacement Project The annual retaining wall replacement program provides for the reconstruction of retaining walls in various locations throughout the city determined to be in poor condition. This is the eleventh year of the retaining wall replacement program. The retaining wall replacement project includes the removal of the existing walls and construction of decorative modular concrete block walls and site restoration. This program has primarily involved the necessary replacement of walls within the annual Street reconstruction project. In 2018 there are no retaining walls included in the street reconstruction work. Two large retaining walls that are in an advanced condition of decay will need to be considered for replacement; located at Piper Road at Warner and Sulgrove Lane at Tuxedo Blvd on the south tip of Island Park. Seal Coat Program The seal coat program is proposed again this year to include the reconstructed streets in the North and Northwest Island Park Area (2013 Street Recon Project). Storm Sewer The City Engineer is reviewing locations that are in need of storm sewer improvements for 2018 and the future. This will begin with updating our MS4 permit and the Storm Water Pollution Prevention Plan. These administrative efforts will include detailed analysis of the load -reducing impact of treatment devices installed during the past 15 -years of improvements that were embedded in street reconstruction work. This analysis will account for the combined effect of those improvements and reveal when improvement or enhancement work needs to resume in order to remain on track with increasing solid and nutrient removal standards levied by various regulators. Staff does anticipate improvement work completed by others along the Bradford/Wilshire system. Discussion is currently under way with MCES staff about the possibility of combining these city storm drainage improvements with the MCES L39 lift station improvement project scheduled for this summer. Additionally, a street -end demonstration project is being discussed with MCES for incorporation into the restoration work at the end of Manchester where their L-40 lift station is being removed. This will be MCES-funded in -lieu of restoration to previous conditions, and provide a low-cost, low -maintenance and attractive benchmark solution for other street -end configurations across the 52- community where stormwater is presently discharged directly from street to lake without any form of treatment. City Staff is in discussion with MCWD staff on shoreline improvements and enhancements in conjunction with storm sewer improvement construction of the Carlson Park. Staff anticipates discussion with MCWD and respective developers to coordinate potential downtown development activities at the Harbor District Townhome and Commerce Place development sites. These improvements create opportunity for the City to collaborate with property owners and regulators to ensure appropriate balance between recreational, economic, social, and ecologic initiatives in project areas. Sanitary Lift Stations Construction on the C-5 lift station which commenced in 2017 will complete in summer 2018. The C-6 station on Shoreline Drive on the Three Points peninsula will be replaced beginning in 2018. Water Distribution Svstem Watermain replacements are included in the Street, Utility Improvement Project in the Westedge, CSAH 44 corridor. Watermain will be replaced along most of the corridor with MCES paying a portion of the costs where relocation of the main is required to fit their force main into the ROW between the Bartlett Blvd and Evergreen intersections on Westedge. Well 3 (Chateau) borehole and mechanical equipment will be fully inspected, overhauled and redeveloped as necessary in 2018. This follows the important work done at well 8 (Evergreen) in 2017 to ensure longevity of our water supply resources. Complementary to this the Wellhead Protection Plan updates will be completed in 2018 and further solidify the planning and execution of critical activities to assure drinking water supply for the City. Inflow/Infiltration Studv The City Engineer completed a study in 2007 of the sanitary sewer lift stations and Inflow / Infiltration into the sewer lines. This study has served as a guide to determine where the city needs to perform pipe lining in future years to come in compliance with the Metropolitan Council Environmental Services directive to reduce the amount of I /I or pay surcharge penalties. Since 2015, the City has worked through an assigned work plan in lieu of surcharges by the Met Council for exceedances experienced in 2014. 2018 is the last year of that work plan and the anticipate work includes: • In 2018 the Island Park districts not directly serviced by MCES interceptors and not refurbished under the MCES intercept replacement project will be cleaned and inspected. • A manhole rehabilitation project similar to that completed in 2017 in the Three Points Peninsula sewer shed is contemplated for the Island park districts after completion of the inspection process. Low-lying manholes with inverts at approximate lake or water table level present a significant inflow and infiltration risk that can be mitigated through rehabilitation of the structures. • Qualifying costs included in the 2018 lift station replacement at C-6 (Shoreline Drive) Staff has paused high level discussions around the issue of private sanitary sewer service I/I to evaluate continued mitigation on the municipal side as well as enhance monitoring tools to better 9 -53- characterize and pinpoint problem areas. Improved metering has been specified with recent lift station replacements as well as in several key confluence points in the City system. MCES Improvement Projects MCES will complete work on the Dakota Trail Intercept project in 2018. Remaining work includes trail surface reconstruction, trailside restoration, and restoration of pavement areas behind Commerce Blvd business -fronts south of the trail crossing disturbed by project staging. MCES will complete the Island Park area intercept, L-39 and force main project in 2018. Remaining work includes re-establishment of wetland and watershed features around the Bradford station, restoration of project areas along the full length of the project, restoration of Swenson Park after use as a staging area, and removal of the old stations at L-40 and L-39. MCES will start work on the Westedge and C.R. 44 forcemain replacement project. This will be a two-year project and affect traffic circulation in the immediate region for the full duration. Work within Mound will be completed in 2018 with areas south of Priest's Bay Bridge being completed in winter 2019 and 2019. Other Hiehliehts • Public Works staff is always researching the availability of grants for a variety of possible projects. • Staff annually updates the vehicle replacement program to better manage and forecast future vehicle replacement needs and costs. • Staff annually reviews the long range infrastructure repair and replacement needs of the City's storm sewer, sanitary sewer, and watermain. The results are incorporated into the City's capital improvement program. • Staff in response to the rains and flooding in the spring of 2014 began working collaboratively with the MCES on several projects to address significantly long overdue sanitary sewer system upgrades. Completion of these system upgrades over the next two years will result in the overall sanitary sewer system having improved coordination and a greater capacity to move any excess sewage flow through the system more efficiently. 10 -54- IIS 1 CITYOF MOUND Public Works Department Work Plan / Initiatives Capital Improvement Projects • Annual City Street Reconstruction • Annual Retaining Wall Replacement • Coordinating with MCES on Joint Projects • Sanitary Lift Station Reconstruction Surface Water Manaeement • Annual Review of Surface Water Management Plan to insure compliance with administrative and maintenance requirements • Annual Review of NPDES II permit and insure compliance • Annual Review of Storm Water Pollution Prevention Plan (SWPPP) and insure compliance • Review State and Federal laws and permit changes to insure City Policy and Ordinances are current • Review development plans to insure compliance with permit requirements • Annual Review of MCWD Rule Changes Parks • Annual update inventory of park structure maintenance needs • Evaluate equipment for replacement • Research funding sources for park improvements Streets • Sweep City a mirdmum of two times per year • Installation of new street signs throughout City and in Street Reconstruction Project Area. • Decrease use of sand with new snowplowing and sanding equipment • Repair sidewalks and trails as needed • Include utility upgrades and repairs on annual street reconstruction project • Continue Annual Crack Seal and Seal Coat Program Storm Sewer • Continue annual lake outfall cleaning and dredging • Continue annual catch basin cleaning • Maintain stormwater storage / ponding areas • Work with MCWD on storm water quality improvements 11 55- • Construct storm sewer improvements / repairs as needed • Include upgrades and repairs on annual street reconstruction project Sanitary Sewer • Continue televising and performing annual repairs as needed • In -pipe lining at locations with high inflow / infiltration problems • Reduce I / I in municipal lines to avoid MCES surcharge • Implement SCADA monitoring and control system • Include upgrades and repairs on annual street reconstruction project • Coordinate with MCES to eliminate metering discrepancies • Upgrade/reconstruct lift stations • Coordinate as needed with proposed development Water • Implement SCADA system on new facilities • Annually update water system model with Bolton & Menk • Coordinate as needed with proposed development • Include reconstruction and repairs on annual street reconstruction project • Comply with Wellhead Protection Plan in accordance with State and Federal Regulations Administration • Annually update capital improvement program • Review Safety and Training needs of staff • Annually review and update Vehicle Replacement Program • Coordinate Public Works & Parks Maintenance Facility space needs • Coordinate Public Works review of grading and utility plans for development • Upgrade office filing system and record retention • Annually update inventory of City's infrastructure and mapping • Implement GIS street and utility mapping capabilities when completed by consultant 12 -56- 2017 Key Result Areas, Goals, Objectives, and Value Statements 2017 Year End Progress/Status Support to Council —Timely, accurate, and thorough packets, reports, and responses to data requests 1. Quickly bring new Council member up to speed - Welcomed Council Member Jeff Bergquist to the Council in 2017 2. Posted NLT close of business Thursday preceding... minimize substantive agenda amendments/adds 2. Improve staff process to assemble packets... electronically produced in PDF - File Structure in place, training and implementation remain... launched with 9 Jan packet 3. Continue discussion on City options for inflow/infiltration repairs to sewer - Rehabilitation work continued in 2017 with a shift to assessing and rehabbing manhole structures. Staff continued to evaluate measurement, analysis tools and examine future best value repairs to City assets. Staff also initiated analysis of exceedance measurement and triggers in light of significant Met Council pumping upgrades and system coordination changes 4. Continue to refine Code resources to clarify language/intent and meet emerging needs - Registered Offender Restrictions - complete -Animals -complete - Vacation Home Rental - Previewed, presented background, guidance options. Exhibits in draft - Parking - in draft Manage the Staff— Empower to strengths, develop; lean but highly effective 1. Simplify/strengthen performance evaluation 2. Retain current high quality administrative team members - PW/Accounting Admin Assistant resigned mid December, re -staffing process completed 20 Dec 3. Improve effectiveness of temp/part time staffing - Improved hire effectiveness for summer crews, Sentenced to Service implementation, stabilized Dock Inspector 4. Continue to stabilize work climate -- fully implement Lead Workers - Lead Worker probationary periods completed, Shop -level work plans under development - 1 PW trade -worker retirement, 1non-prob resignation, 1 prob resignation - Onboarded 1 new PW Trades employees, 2 hires pending w/ 2018 start dates 5. Equip the team: skill development; tools, facilities and equipment; workflow and processes 6. Complete successful contract negotiation with PW Collective Bargaining Unit (retroactive) - 3rd Business Agent... full membership rejected negotiated T.A. Will mediate 7 Mar, 2018 Finance and Administration - expertly -controlled, consistent, and repeatable processes to ensure best practice and transparent operation of City administrative processes and functions 1. Mitel phone switch and new handset install and implementation - Complete and fully integrated 2. Data Security and information assurance review with LMC - Complete 3. Continue archive actions, clean-up, e -records, e -record management - Ongoing micro -fiche scanning of archives - Retention schedule review, corporate shred days for secure destruction - On-going electronic file plan organization, and redundancy cleanup - Reviewed data assurance, firewalls, virus protection, and backup architecture 4. Utility billing changes for non -homestead properties - Complete, non -homestead property owners notified in Q1, no remarkable issues through 4 quarter billings. -57- 5. Lost Lake Villas HOA agreement update - Final version drafted for submission to HOA - Re -assignment of excess dockage to "overnight' submitted to LMCD, hearing forthcoming 6. Complete Frontier video franchise request processing - Completed application processing actions 7. Improve usability and layout of City website - Ongoing improvement to content variety and freshness - focused increase in resident resource links, Community Services Links, and review of information "freshness". Site architecture improvements are limited by the provider level -of -service Customer Service —we serve the public in everything we do, a personal level of service is essential 1. Available, courteous, and consistent... level -of -service definition 2. Prompt callbacks with minimal pass -offs 3. Honest answers or explanation of the problem and what the Staff or City can do to resolve 4. Accurately filter issues for root cause and appropriate City engagement 5. Enliven existing out facing communication tools: Gov Deliv, Website, Etc. - Transition to CodeRed to increase passive subscription capture in increase media vectors to include text message and recorded voice. Smooth transition of legacy subscribers, substantial increase from passive capture. Geospacial polygon notifications also enabled and in routine use for utility outage notifications. 6. Explore options to measure/public feedback - Examined Survey -Monkey options for general customer service feedback, have not landed on implementable options. Budget - assure appropriate Council oversight and approval reflect priorities, fiscal constraint, and transparency for planning and executing public finding - Staff's 2018 budget proposal limited the total levy increase to 2% with an overall 2.5% increase in General expenses largely due to staff paycenter re -alignments and year -specific changes to capital - equipment purchase needs. Utility budget projections were substantially modified to bring small, immediate relief in base rates without max -levy impact using available reserves. Substantial progress was made in developing long term financial projections and financial structures to help normalize levy - impacts of future improvement and investment needs. 1. Seek highest value/quality in day to day operational choices 2. Keen eye for emerging problems/breakdowns, solve problems earliest before issues/costs grow 3. Preserve value in existing assets and resources to minimize lifecycle cost of ownership - Initiated a long-range financial strategy study to incorporate lifecycle cost profiles for facilities, vehicles, equipment, infrastructure to better understand financial profiles of "cost of ownership", level or normalize budget requirements, and demonstrate "should -cost" profiles to maximize asset lifespan. 4. Review past practice for improved methods and practices to reduce costs or improve efficiency of current activities across all City Operations - Gov DEALs for asset re -sale... we've had great success shedding out-of-date, mis-match equipment, attachments, and vehicles not suitable for trade - Grant research for OSHA funding, MDH funding, MCWD funding, Hennepin County Cost Shares - Rebuild on Tymco sweeper saved$ 45 - 60K over new -vehicle replacement - Disposed of unused, high maintenance, Sterling 2WD dump-chasis snowplow, $40K sale revenue Im 5. Manage outstanding debt commitments to minimize the long-term debt service cost component in future budget years, understand impacts of current debt structure on future fiscal planning - No bonding in 2017, called Fire Apparatus Certificates saving $5,000 - Established Infrastructure Replacement Reserve Fund to set stage for funding necessary future work with minimum levy, debt, and assessments including; interfund loan and pay -cash options 6. Process controls that assure daily compliance with legislative requirements for fiscal practices that are validated through annual external audit results No identified weaknesses in 2016 Audit report Planning and Development - foster community development, redevelopment and infill; building our community and its tax value consistent with comprehensive plans and visions as market recovery and prevailing conditions will allow 1. Proactively engage ongoing projects to ensure compliance with plans and codes, vary as appropriate - 33 Planning Cases submitted for consideration and action by Staff in 2017 2. Balance opportunity and vision to ensure best and highest use of remaining "District" opportunities - Focused effort on translating expressed City values/equities into reachable outcome statement - Released RFI/Q to simultaneously validate restatement of objectives, measure market interest, and begin developer selection process for harbor District Residential uses. - Similar process poised to execute in 2018 for Restaurant parcel 3. 2040 Comprehensive Plan Updates completed to finalized draft ready for external coordination - Draft circulated for community public engagement; Planning Commission, Council, open house, Survey Monkey... Planning Commission and Council will see final draft in Feb 2018 4. Redefine objectives for Harbor District Development Area through Comp Plan and public engagement - Complete, Synchronized with Langdon, "Linear" and completed Lost Lake. RFI/Q released 5. Bring Trident Proposal to Development Agreement and build phase - TIF, Closing, Developer Agreement, CUP, Building permits complete... broke ground 6. Bring Serenity Proposal to Development Agreement and build phase - Preliminary Plat and CUP complete... closing and Developer Agreement delayed by developer 7 Complete necessary follow up on Indian Knoll Project - Ribbon Cut 4 Dec 2017! 8. Meet market demand for further development proposals and land use/planning coordinationk - Eva and Abbie Subdivision 4873 Shoreline - 6251 Westedge minor 3 -lot sub division 9. Meet market demand for increased residential infill/redevelopment land use/planning coordination - $28M valuation adds: Harrison Bay Sr Living ($10M), 25 new home builds ($11M), 18 Additions ($3.6M), 70 Alteration/Remodels ($1.5M), other maintenance/improvement ($2M) 10. Implement electronic Building Permit applications, feedback, and management - Encountered software vendor development delays, bi-monthly updates for 2018 - poised for Q1 e -inspect, e -permit (elect) and e -permit (multicraft) launch 11. Alternate enforcement/ticketing for nuisance issues under Int'I Property Maintenance Code (IPMC) - Lack sufficient State jurisdiction... requires policing powers 12. Limited Building Official capacity on Staff for IPMCmatters - Courseware and certification opportunities withdrawn, continue to look for training sources 13. Ticket -writer on staff (Parking, Nuisance, IPMC) - Lack sufficient State jurisdiction... requires policing powers 14. Outside Storage Zoning Code and Nuisance Code improvements - Community inputs (complaints) regarding storage and nuisance monitored against present language to assess need for future revisions or additions... pending workshop Staff reporting -59- Municipal Liquor Operations - Remain the outlet of choice by providing deeply personalized service not obtainable at grocery or warehouse outlets and a wide selection to meet customer needs 1. No liquor control violations - Failed spot check in 1st Quarter 2017, all employees re-trained. 2. Improve part time labor budget accuracy and scheduling to better predict and control cost - Re-evaluated budget line item to reflect need... to include Sunday "wedge' 3. Posture store for potential change in Sunday sales legislation... tell our story... market our value - Sunday Sales up and running... revenue impact appears positive - however, profit -negative 4. Control inventory to < 10% gross sales... clean up stale SKUs in inventory/POS system - Struggled to keep below 15%... evaluating if 10% is correct target to sustain variety... MMBA indicates a 10% for metro outlets, 15% for outstate... we fall between 5. Continue sales growth trends at 1 -1.5% annual - Revenue up 3.2% to $3,151,000 in 2017 6. Maintain gross profit margins consistent with peer competitors (26% of sales) - 25.??? % for 2017 7 Sustain profitability to maximize benefit to community through tax relief and funding sealcoat pgm - Budget transfer increased ??? to ????? Fire - Best value emergency services for our City and surrounding communities 1. Retain and recruit to maintain projected staffing needs... 40 - 42 active members of the Department - 5 hires in 2017 - current staffing at 41 active members 2. Officer training and succession - 2 Officer appointments in 2017 3. Continue to work efficiencies and common training objectives identified in Shared Services Study - Implemented common training delivery and tracking platform with partner departments, future training coordinator costs reflected in 2018 budget submission 4. Lead/make progress on disposal of WAFTA site - Shifted approach ... Surrender back to US Army for Federal (DERA) cleanup 5. Manage capital expenses overlong term as projected in apparatus replacement plans - Called certificates using excess reserve funding - Ladder 44 in service March 2017 Evaluating combined Pumper/Utility apparatus for future year apparatus replacement .m Capital improvement planning— Prioritize, synchronize, and balance infrastructure and capital equipment renewal needs against financial capacity and outside agency opportunities 1. Continue to collaborate with other jurisdiction efforts to maximize project potential: MCES, Hennepin County, MCWD, Etc - 2018 Street, Utility project contains approx $1M city benefit funded by MCES 2. Accurately forecast and monitor long range financial profile to manage the balance of levy, assessment and rates against timing of critical renewal work - Re -prioritized CIP extending proposed water and sewer cost across 10 -year vs 5 to respond to financial capacity, rate, and levy balance concerns. Evaluated numerous options for shift in rate/levy as well as base/variable balance to address customer/resident concerns 3. Shift renewal emphasis from whole -streets concept to sustainment localized spot re -alignments or renewals, and unaddressed areas such as parks, retaining walls, stormwater, and City facilities through 2025 - Initiated long term financial and capital improvement funding analysis... asset management plan. Delayed by deeper analysis of rate/levy balance to respond to resident concerns. Shifted priorities to allow delay of some investment and renewal to allow funding capacity recovery. 4. Define financial strategy for next evolution of major infrastructure investment beyond 2025 - Established an Infrastructure Reserve Fund to build financial capacity to fund future street renewal needs post 2025 with short term capacity for interfund loans to easy utility fund stress 5. Invigorate Parks Commission with budgetary practice, develop management plan/vision for assets - Incorporated Parks long range funding priorities into staff budget plans Sorbo Park Playstructure Replacement in Budget 6. Parks long range planning woven into Comprehensive Plan Update 7 Complete substantial site improvements within PW yards and spaces: pavement salt house, Parks - Salt shed (fabric structure) installed and in service - Shop driveway and asphalt apron/parking area re -surfaced - Re-aligned/installed nurse bins in shop apron/parking area for bulk material storage - Re -organized "upper yard" for improved debris and slop/spoil barrow stockpiling 8. Evaluate Island Park Hall conditions and urgency of demolition; plan and program - Responded to public interest in private refurbishment, no action taken by staff in 2017 9. Enhance water resource protection via improved MS4 maintenance planning and execution - Re-initiated storm -drain sump cleaning - Robust sweeping program, aligned equipment use with seasonal objective variation - Put re -furbished regenerative (Tymco) in service after chasis-up rebuild 10. Determine/implement low-cost best management practice operation and maintenance methods and practice to sustain/improve water quality and reduce iron staining - Island park Standpipe storage tank taken out of service! - Relocated mixer from IP standpipe to Evergreen tower to improve storage freshness - Re -choreographed system segmentation and sequencing for seasonal hydrant flushing to improve sediment isolation/removal - Re -developed Evergreen well (well 8) in 15 -yr well overhaul effort to reduce sand in supply Public Works and Engineering Projects: 2015 Street Repairs wear course placement (Phase I Tuxedo) -- COMPLETE 2016 Street Repairs wear course placement (Ph II Tux, Cypress/Maywood, Bartlett) -- COMPLETE 2016 Wilshire Blvd 16 -inch Watermain Loop completion -- COMPLETE 2015 Island Park 10 -inch Watermain Loop contract award and completion -- COMPLETE Decommission Island Park pump station and stand pipe, prep for future demolition -- COMPLET -61 - 2016 D-2 (Lynwood) Lift Station Replacement completion -- COMPLETE City equities in MCES L-39 (Bradford) lift station replacement construction -- ONGOING -- Project to complete summer 2018 City equities in MCES Dakota Trail Intercept replacement construction -- ONGOING --Trail placement/site restoration in Spring - including city and business parking at Commerce 2017 Street, Utility, Retaining Wall Replacement Project (Pill Tux, Wilshire, Lynwood) -- Utility, road base, non-wear complete: complete spring 2018 Commerce Blvd North Retaining Wall/walk/trail Replacement (Hennepin County Cost Share) -- COMPLETE 2017 Lift Station Replacement/refurb award and construction C-5 (Commerce) and B-3 (Sinclair) -- Structures placed, in-ground piping placed: complete spring 2018 2017 1/1 Surcharge workplan completion (fiRa' �'LaF OR G••--LRt L„GLeaaRee W aFkPla4 Current exceedance workplan through 2018 -- 2017 project to refurbish Three Points sewershed Manholes COMPLETE 2017 Carlson Park Storm Sewer Improvement Project w/75% MCWD cost share -- Substantial COMPLETE, minor sitework, establishment, interpretive (educational ) in Spring City equities in MCES C.R.44 Force Main replacement in design, bid, and award -- Project out for bids late Dec 2017... award, cooperative agreement, work start in 2018 Individual Professional Development in 2017 Attended City Engineers Association of MN Annual 2 -day Conference for Continuing Education and Best Practice Sharing Attended APWA Spring and Fall Conference for Continuing Education and Best Practice Sharing Attended League of MN Cities Annual 2 -day Conference Awarded "Public Works Executive' (PWE) credential by American Public Works Association Donald Stone Center for Leadership and Management -62- 2018 Key Result Areas, Goals, Objectives, and Value Statements Support to Council —Timely, accurate, and thorough packets, reports, and responses to data requests 1. Packets NLT close of business Thursday preceding... minimize substantive agenda amendments/adds 2. Improve staff process to assemble/distribute packets... electronically produced in PDF (carry over) 3. Re-engage discussion on City options for investigation, best value inflow/infiltration repairs to sewer 4. Continue to refine Code resources to clarify language/intent and meet emerging needs 5. Continue improving formal community feedback process for "Item 5" inputs to Council Manage the Staff— Empower to strengths, develop; lean but highly effective 1. Retain current, high quality administrative team members 2. Continue to improve team effectiveness, communication, and performance 3. Improve effectiveness of temp/part time staffing 4. Continue to stabilize work climate -- PW Lead Worker roles and responsibilities, 311 toolkit 5. Equip the team: skill development; tools, facilities and equipment; workflow and processes 6. Complete successful contract negotiation with PW Collective Bargaining Unit (retroactive) Finance and Administration - expertly -controlled, consistent, and repeatable processes to ensure best practice and transparent operation of City administrative processes and functions 1. Continue archive actions, clean-up, e -records, e -record management 2. Smoothly on -board new Administrative Assistant/Customer Service Representative 3. Continue focus on usability and layout of City website 4. Timely responses to requests for information and public records Customer Service —we serve the public in everything we do, a personal level of service is essential 1. Available, courteous, and consistent... level -of -service definition 2. Prompt callbacks with minimal pass -offs 3. Honest answers or explanation of the problem and what the Staff or City can do to resolve 4. Accurately filter issues for root cause and appropriate City engagement 5. Enliven existing out -facing communication tools: CODE Red Website, Etc. Budget - assure appropriate Council oversight and approval reflect priorities, fiscal constraint, and transparency for planning and executing public finding 1. Execute within budget parameters approved by the Council 2. Seek highest value/quality in day today operational choices 3. Keen eye for emerging problems/breakdowns, solve problems earliest before issues/costs grow 4. Preserve value in existing assets and resources to minimize lifecycle cost of ownership... map strategy 5. Review past practice for improved methods and practices to reduce costs or improve efficiency of current activities across all City Operations 6. Manage outstanding debt commitments to minimize the long-term debt service cost component in future budget years, understand impacts of current debt structure on future fiscal planning 7. Process controls that assure daily compliance with legislative requirements for fiscal practices that are validated through annual external audit results 8. Complete Long Term Financial Plan development to inform future financial positioning decisions -63- Planning and Development - foster community development, redevelopment, and infill; building our community and its tax value consistent with comprehensive plans and visions as market recovery and prevailing conditions will allow 1. Proactively engage ongoing projects to ensure compliance with plans and codes, vary as appropriate 2. Balance opportunity and vision to ensure best and highest use of remaining "District' opportunities 3. Complete 2040 Comprehensive Plan Updates 4. Market new objectives for Harbor District and Langdon residential development potential 5. Complete Trident Harrison Bay Sr Living Development 6. Bring Serenity Proposal to Development Agreement and build phase 7. Meet market demand for further development proposals and land use/planning coordination 8. Meet market demand for increased residential infill/redevelopment land use/planning coordination 9. Implement electronic Building Permit applications, feedback, and management (carry-over) 10. Complete Comprehensive Planning Process 11. Land Disposal Policy Formulation 12. Short Term Vacation Rental 13. Recruit, Select, and smoothly on -board new Field Officer Municipal Liquor Operations - Remain the outlet of choice by providing deeply personalized service not obtainable at grocery or warehouse outlets, and a wide selection to meet customer needs 1. No liquor control violations 2. Improve part time labor scheduling to better control cost 3. Control inventory to < 15% gross sales... enhance operations with available POS management tools 4. Continue sales growth trends at 2 - 3% annual 5. Maintain gross profit margins consistent with peer competitors (26% of sales) 6. Sustain profitability (7.5% margin) to maximize benefit through tax relief Fire - Best value emergency services for our City and surrounding communities 1. Retain and recruit to maintain projected staffing needs... 40 - 42 active members of the Department 2. Officer training and succession 3. Continue to work efficiencies and common training objectives identified in Shared Services Study 4. Lead/make progress on disposal of WAFTA site (carry over) 5. Manage capital expenses over long term as projected in apparatus replacement plans 6. Contract re-evaluation and re -structure as necessary 7. Endure regional road disruptions without impact to level of service Capital improvement planning- Prioritize, synchronize, and balance infrastructure and capital equipment renewal needs against financial capacity and outside agency opportunities 1. Continue to collaborate with other -jurisdiction efforts to maximize project potential: MCES, Hennepin County, MCWD, Etc 2. Accurately forecast and monitor long range financial profile to manage the balance of levy, assessment, and rates against timing of critical renewal work 3. Develop accurate long range asset management and capital investment strategy 4. Implement financial strategy for next evolution of major infrastructure investment beyond 2025 5. Sustain Parks Commission budgetary practices, management plan, vision for assets 6. Evaluate Island Park Hall conditions and interest in restoration 7. Enhance water resource protection via improved MS4 maintenance planning and execution 8. Determine/implement low-cost, best management practice operation and maintenance means and methods to sustain/improve water quality and reduce iron staining .m Public Works and Engineering Projects: Complete City equities in MCES L-39 (Bradford) lift station/interceptors replacement construction Complete City equities in MCES Dakota Trail intercept replacement construction Capture City equities in MCES C.R.44 Force Main replacement in design, bid, award, construct Hennepin County 2018 Resurfacing Program, CSAH 125, 110 to Spring Park (Interlachen) 2017 Street Project wear course (Wilshire, Lynwood, Maywood, Fairview) Complete 2017 Lift Station (C-5) Improvement and relocation 2018 Street, Utility Improvement Project (Westedge Blvd) using MCES Cooperative Agreement 2018 Lift Station Replacement Project (C-6, Shorewood Lane) 2018 1/1 Surcharge workplan completion; Island Park sewershed clean, televise, manhole refurb Continue Pavement Management Program with Seal Coat and Crack Seal projects Replace Piper/Warner retaining wall Sorbo Park play structure replacement project Surfside Park Small Area Planning Study -65- City of Mound - General Fund - Preliminary 2017 Results Beginning Fund Balance 1/1/x 3,137,608 3,289,093 2,914,265 Nonspendable for Bud 2018 Bud 2017 ACF 2017 VarBudvAct Bud 2016 17Bud vs ACT 2016 16 Bud vs DESCRIPTION 188,960 Restricted for 16 Bud 16 Act 28,084 Total Taxes 3,609,504 3,534,129 3,562,957 28,828 3,648,420 -114,291 3,652,858 4,438 Franchise Fees 406,000 406,000 405,179 -821 406,000 0 423,043 17,043 151,485 Licenses and Permits 235,750 206,250 345,849 139,599 180,250 26,000 294,544 114,294 Bldg Permits Intergovernmental 443,846 400,471 407,390 6,919 400,471 0 404,324 3,853 Chargesfor Services 136,000 179,000 267,364 88,364 179,250 -250 244,953 65,703 Plan checkfee+80K Fines and Forfeitures 42,000 37,000 43,137 6,137 58,000 -21,000 44,022 -13,978 Transfers & Bonds 128,072 130,265 130,266 1 57,500 72,765 57,405 -95 Other Revenue 352,366 323,416 433,111 109,695 296,016 27,400 480,471 184,455 Sales of Fixed Assets 56 Park Dedication 0 0 69,100 69,100 0 0 22,644 22,644 Sp Assessments 17, Int. 18 Total Revenues 5,353,538 5,216,531 5,664,354 447,823 5,225,907 -9,376 5,624,264 398,357 ADMINISTRATIVE 442,007 433,594 374,997 58,597 452,893 19,299 414,981 37,912 FINANCE 602,491 582,381 573,274 9,107 584,717 2,336 581,701 3,016 City Hall 57,800 57,500 56,995 505 77,000 19,500 68,374 8,626 Police 1,748,539 1,719,615 1,722,186 -2,571 1,679,644 -39,971 1,683,007 -3,363 Emergency Preparedness 61,238 30,149 30,543 -394 57,496 27,347 58,436 -940 Planning & Inspection 466,781 421,667 524,211 -102,544 403,994 -17,673 463,466 -59,472 Inspections Fund Transfers (Fire, Capital Reserve Fun 548,976 562,967 562,967 0 476,800 -86,167 476,800 0' PUBLIC WORKS (Streets, Parks) 1,643,464 1,480,143 1,463,834 16,309 1,535,674 55,531 1,452,336 83,338 OTHER (Abatements, Mist) 53,299 80,000 119,076 -39,076 80,000 0 50,335 29,665 Total Expenditures 5,624,595 5,368,016 5,428,083 -60,067 5,348,218 -19,798 5,249,437 98,782 Incr(Decr) Net Assets -271,057 -151,485 236,270 387,755 -122,311 -29,174 374,828 497,139 Beginning Fund Balance 1/1/x 3,137,608 3,289,093 2,914,265 Nonspendable for Prepaid Items 2,000 2,000 1,780 Liquor Fund Loan - Long Term 100,673 188,960 Restricted for Park Dedication 97,184 28,084 Committed for Interfund Loans 1,350,046 1,408,377 Assigned for Severance Pay 210,000 200,000 193,075 Next Year Budget Deficit 200,000 251,000 151,485 Unassigned 1,104,505 1,078,374 2,725,709 Total Fund Balance 12/31/xx Unassigned as a % of Exp 2,866,551 3,137,608 20% 20% 3,289,093 52% City of Mound - Water Fund - Preliminary 2017 Results -67- 17Bud vs Bud 2018 Bud 2017 ACT 2017 VarBudvAct Bud 2016 DESCRIPTION 123,146 30,406 250,701 105,436 8,400 Total Revenues 2,030,000 2,030,000 2,127,913 97,913 1,901,156 Salaries & Benefits 288,158 325,731 236,739 88,992 356,137 Supplies 82,650 87,150 75,531 11,619 95,550 Professional Services 82,300 72,300 105,112 -32,812 72,250 Phone, Postage & Print 14,200 14,200 13,858 342 13,200 Insurance 16,700 16,700 10,500 6,200 16,700 Utilities 48,300 47,600 50,994 -3,394 48,800 Repairs & Maint 12,500 14,500 9,630 4,870 9,000 Other Contracts & Rental 101,000 138,000 139,295 -1,295 86,300 Deprec & Capital Exp 759,000 710,000 776,520 -66,520 847,550 Debt Service 522,000 538,400 491,200 47,200 529,439 Misc, Interest & Other 10,850 10,850 12,304 -1,454 11,950 Transfers 0 0 0 0 0 Total Expenditures 1,937,658 1,975,431 1,921,683 53,748 2,086,876 Incr(Decr) Net Assets 92,342 54,569 206,230 151,661 -185,720 -67- 17Bud vs ACT 2016 16 Bud vs 16 Bud 16 Act 128,844 2,024,302 123,146 30,406 250,701 105,436 8,400 81,223 14,327 -50 69,583 2,667 -1,000 14,906 -1,706 0 15,924 776 1,200 53,503 -4,703 -5,500 20,937 -11,937 -51,700 64,336 21,964 137,550 715,187 132,363 -8,961 565,009 -35,570 1,100 9,425 2,525 0 0 0 111,445 1,860,735 226,141 240,289 163,567 349,287 City of Mound - Sewer Fund - Preliminary 2017 Results Incr(Decr) Net Assets -92,109 Bud 2017 Bud 2018 DESCRIPTION Bud 2016 Total Revenues 2,266,000 Salaries & Benefits 296,950 Supplies 46,850 Professional Services 80,097 Phone, Postage & Print 13,500 Insurance 15,500 Utilities 881,512 Repairs & Maint 12,500 Other Contracts & Rental 101,000 Deprec & Capital Exp 629,000 Debt Service 273,000 Misc, Interest & Other 8,200 Transfers 0 Total Expenditures 2,358,109 Incr(Decr) Net Assets -92,109 Bud 2017 ACT 2017 VarBudvAct Bud 2016 17Bud vs ACT 2016 16 Bud vs 16 Bud 16 Act 2,200,000 2,336,892 136,892 1,954,411 245,589 2,164,855 210,444 347,251 239,782 107,469 378,327 31,076 249,566 128,761 47,150 44,812 2,338 52,000 4,850 53,653 -1,653 125,097 83,223 41,874 99,097 -26,000 72,439 26,658 13,500 13,985 -485 12,000 -1,500 14,612 -2,612 15,500 24,470 -8,970 15,500 0 15,780 -280 771,420 770,149 1,271 722,929 -48,491 714,675 8,254 17,500 8,969 8,531 12,000 -5,500 23,164 -11,164 36,000 22,535 13,465 36,300 300 69,067 -32,767 680,000 628,164 51,836 631,750 -48,250 609,700 22,050 273,800 248,813 24,987 272,138 -1,662 296,904 -24,766 8,200 6,815 1,385 8,200 0 8,205 -5 0 0 0 0 0 0 0 2,335,418 2,091,718 243,700 2,240,241 -95,177 2,127,764 112,477 -135,418 245,175 380,593 -285,830 150,412 37,091 322,921 City of Mound - Storm Water Fund - Preliminary 2017 Results 17Bud vs Bud 2018 Bud 2017 ACT 2017 VarBudvAct Bud 2016 DESCRIPTION 62,184 25,875 7,812 18,063 0 Total Revenues 109,200 535,000 473,940 0 508,133 Salaries & Benefits 0 0 58 -58 25,875 Supplies 0 0 10 -10 0 Cost of Goods Sold 0 0 0 0 0 Professional Services 40,800 45,800 51,863 -6,063 45,800 Phone, Postage & Print 0 0 46 -46 0 Insurance 0 0 0 0 0 Utilities 0 0 0 0 0 Repairs & Maint 0 0 0 0 0 Other Contracts & Rental 20,000 20,000 4,935 15,065 20,000 Deprec & Capital Exp 210,000 200,000 207,515 -7,515 261,500 Debt Service 141,000 141,500 128,434 13,066 145,252 Misc, Interest & Other 0 0 500 -500 0 Transfers 0 0 0 0 0 Total Expenditures 411,800 407,300 393,362 13,938 498,427 Incr(Decr) Net Assets -302,600 127,700 80,579 -47,121 9,706 17Bud vs ACT 2016 16 Bud vs 16 Bud 16 Act 26,867 570,317 62,184 25,875 7,812 18,063 0 1,088 -1,088 0 0 0 0 37,489 8,311 0 73 -73 0 0 0 0 0 0 0 0 0 0 14,818 5,182 61,500 192,175 69,325 3,752 151,781 -6,529 0 0 0 0 0 0 91,127 405,237 93,190 117,994 165,080 155,374 City of Mound - Liquor Fund - Preliminary 2017 Results -70- Bud 2018 Bud 2017 ACT 2017 VarBudvAct Bud 2016 17Bud vs ACT 2016 16 Bud vs DESCRIPTION 16 Bud 16 Act Total Revenues 3,137,906 3,025,000 3,161,380 136,380 3,025,000 0 3,054,354 29,354 Salaries & Benefits 340,931 328,029 329,289 -1,260 314,077 -13,952 316,954 -2,877 Supplies 10,300 10,100 13,090 -2,990 12,100 2,000 11,159 941 Cost of Goods Sold 2,346,656 2,247,576 2,329,113 -81,537 2,247,576 0 2,270,289 -22,713 Professional Services 61,350 61,350 62,441 -1,091 65,850 4,500 71,406 -5,556 Phone, Postage & Print 10,700 10,700 6,571 4,129 9,700 -1,000 8,273 1,427 Insurance 21,500 28,500 27,267 1,233 28,500 0 27,344 1,156 Utilities 21,600 21,600 22,513 -913 21,600 0 22,544 -944 Repairs & Maint 8,000 8,000 14,263 -6,263 8,000 0 4,271 3,729 Other Contracts & Rental 28,500 26,500 17,484 9,016 23,000 -3,500 25,392 -2,392 Deprec & Capital Exp 36,992 36,992 37,420 -428 37,000 8 36,992 8 Debt Service 3,072 5,266 0 5,266 7,406 2,140 0 7,406 Misc, Interest & Other 53,625 53,625 59,330 -5,705 53,425 -200 53,388 37 Transfers 125,000 125,000 130,266 -5,266 50,000 -75,000 57,405 -7,405 Total Expenditures 3,068,226 2,963,238 3,049,047 -85,809 2,878,234 -85,004 2,905,417 -27,183 Incr(Decr) Net Assets 69,680 61,762 112,333 50,571 146,766 -85,004 148,937 2,171 Transfers as a % of Gross Sales 4.1% 4.1% 1.7% 1.9% -70- Long Term Financial Plan Assumptions 2018-2028 Building on the Past, Preparing for the Future! The Long Term Financial Plan (LTPP), or"Strategic Plan" for 2018 to 2028 will be an internal action plan for the Qty of Mound. Itwill establish division for our fu tic, provide clear direction for reaching our goals and establish fir onhcc and measurable targets nat Inc Qty can budget around and track. Revenues • Project2% levy increase and tax rate at or below 45% begin tofu n it capital reserve funds, evaluate eliminating special assessments for next generation of streets • Assume no change to LW no additional new mandates • Liquor Fund transfers increase to S225 after loan paid off in 2019 Operating Expenditures • 2.5% operating expenditure increase • Assume current staffing model and maintaining contract for services ]Utility Bi Ili ng, Police Services, Prosecution, Building Inspections] • Evaluate programming expenses Gillespie Center contract expires 12312021 • Fire Fund transfer stable IMtka Beach?j Risk Management • Evaluate Property in the Open jPl Oj and historical buildings and whether to move to self insured • Set goals to qualify for sewer backup coverage Capital Reserve Funds • Create inventories of infrastructure,equipment, vehicles and technology and create replacement plans based on community priorities and essential needs • Evaluate transfers of fund balances to reserve funds l eve l contributions • Identify what maybe missing from the inventories • Determine timing of transitioning from essential infrastructure improvements to building up more aesthetic aspects of our community ]main corridors, parks, tails&open spaces] Capital Improvement Plan - Velddes & limioment • Heavy duty trucks 10 years • Heavy duty specialty equipment mowers/sweepers 15 years • Did not budget utility contributions Initial assumption $200K per year ln reserve fund, plus beginning balance of $XXXK -71- Capital Improvement Plan - Buildings • City Hall/Police/Fire (2003) • Centennial Building (1974) • Public Works Building (1970's) • Parking Deck (2006) • Liquor Store (2003) • Depot (Historical) • Public Bathrooms Transit District (Historical) • Parks Garage (1970's) IPH (1930s) Initial assumption 75K per year in reserve fund, no beginning balance Capital Improvement Plan - Community Investment Fund • Inventory 30 parks & associated improvements • Inventory sidewalks, trails and greenscape Initial assumption 60K per year in reserve fund, plus beginning balance of $XXXK (Park Dedication) Capital Improvement Plan - Street Improvements/Pavement Management • Mill and Overlay (MO) - every 20 years vs • Reclaim and Pave (RP) - every 30 years • Seal Coat (SC) - every 5 - 7 years • Crack Seal (CS1) - 1st time - after 5 - 7 years • Crack Seal (CS2) - 2nd time = worse condition - 5 - 7 years after 1st • Reconstruction (Recon) - original work in early 2000's was mill & overlay only, so this would be complete replacement • Need County and MSA inventory/maintenance plan • NOTE: expenditures are in today's dollars - actual will be higher Capital Improvement Plan - Water Utility Improvements • Recoat (Recoat) Water Towers - every 20 years • Towers - exterior clean every 3 years • Towers - interior inspection & rehab every 10 years • Wells - inspection & rehab every 10 years • Watermain Upgrade/Replacement Capital Improvement Plan - Sewer Utilitv Improvements • Lift Station Reconstruction and Force Main (Recon & FM) • Pump Replacement (PR) - every 15 years • Generator Swap (Genswap) - every 20-25 years • Film sewermain every 5 years on a rotating basis - will determine repair priorities • Private line program?? Capital Improvement Plan - Storm Water Improvements • 2018 last year of street project • Shift to $40K per year in operating funds for engineering and projects -72- Debt Service • Evaluate payment schedules & special assessment receipts • Explore future bonding options and payment terms • Interfund loans for utility funds with deferred payments or forgivable Narrative The utility funds are going to run deficits into the distant future. A 3% rate increase through 2028 and a 5% increase through 2039 are assumed for the Sewer Fund. The projections include a $51M 15 -year bond issue to be repaid by the tax levy. As previously discussed, the idea would be for the governmental funds to loan the utility funds cash for the remaining projects with payments deferred for 15+ years. Bolton and Menk did a great job creating an inventory of our infrastructure and a capital improvement plan through 2050. This information and knowledge of our debt service allows us to assume steady increases to the levy and level funding of the capital reserve funds, but it should be noted that this plan is a work in progress. Inventories of buildings, technology, parks and open spaces have yet to be completed. Place holders for funding building improvements of $75K per year and Community Investment Reserve Fund of $60K have been used. Analysis of fund balance needs to be completed to see if there is "seed" money for the initial funding of the capital reserve funds. Cash flow will be more of an issue when we stop bonding. Staff looks forward to receiving feedback and direction on the format of the Long Term Financial Plan from the City Council. Please let us know if any other information is requested for Tuesday's workshop. -73- In $000's Tax Levies General Fund Revenue Levy - Ops Total Funding Sources - Levy % Change ( C) Total Avail - Capital Prot Funds Alloc/Transfers to Capital Project Funds Street Improvement Fund/MSA Capital Replacement Fund - Vehicles Capital Replacement Fund - Bldg Community Investment Fund Interfund Loans Total Transfers/Capital Project Related EXPENDITURES Capital Project Funds Street Improvement Fund/MSA Capital Replacement Fund - Vehicles Capital Replacement Fund - Bldg Community Investment Fund Interfund Loans Total Expenditures Capital Project Related NET Capital Project Funds Street Improvement Fund/MSA Capital Replacement Fund - Vehicles Capital Replacement Fund - Bldg Community Investment Fund (Park Ded) Interfund Loans/Addl Debt Service Net Capital Project Related General Fund and Special Levy Projections - Long Term Financial Plan - 2018 - 2028 1) 2 5% Growth in General Fund Revenue Levy per yen for operations - Goal to keep City Tax Rate at or below 45%, minimize utility rate increases- Assumes 2% increase to Tax Capacity per year after 2018, but actual should be higher with the addition of Indian Knoll, Serenity Hills and ultimately Harrison Bay Senior Living. TIF I-2 - 2026, TIF 1-3 - 2031 Trident Housing TIF - 2019 - 2029 2) 2% increase to total levy through 2028, excess from retired debt to capital project funds/reserves/interfund loans 3) Make interfund loans to utility funds through 2028 then repayment beings as next generation of streets begin BEG 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 END $ 3,238 $ 3,319 $ 3,402 $ 3,487 $ 3,574 $ 3,663 $ 3,755 $ 3,849 $ 3,945 $ 4,044 $ 4,145 $ 5,705 $ 5,816 $ 5,933 $ 6,051 $ 6,169 $ 6,293 $ 6,420 $ 6,551 $ 6,685 $ 6,818 $ 6,956 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% $ 715 $ 802 $ 810 $ 946 $ 1,070 $ 1,248 $ 1,513 $ 1,311 $ 1,354 $ 1,572 $ 1,666 $ - $ 373 $ 462 $ 255 $ 255 $ 255 $ 255 $ 255 $ 255 $ 255 $ 255 $ 255 $ 3,130 0 281 205 205 205 205 205 205 205 205 205 205 2331 0 61 75 75 75 75 75 75 75 75 75 75 811 0 0 60 60 60 60 60 60 60 60 60 60 600 0 $ $ $ 215 $ 351 $ 475 $ 653 $ 918 $ 716 $ 759 $ 977 $ 1,071 $ 6,135 $ - $ 715 $ 802 $ 810 $ 946 $ 1,070 $ 1,248 $ 1,513 $ 1,311 $ 1,354 $ 1,572 $ 1,666 $ 13,007 $ - $ 747 $ 522 $ 324 $ 260 $ 45 $ 122 $ 144 $ 145 $ 113 $ 185 $ 175 $ 2,781 0 281 292 292 305 243 220 182 162 127 73 130 2307 0 61 75 75 75 75 75 75 75 75 75 75 811 0 0 60 60 60 60 60 60 60 60 60 60 600 0 0 0 215 351 475 653 918 716 759 977 1071 $ 6,135 $ - $ 1,089 $ 949 $ 966 $ 1,051 $ 898 $ 1,130 $ 1,379 $ 1,158 $ 1,134 $ 1,370 $ 1,511 $ 12,634 $ $ (374) $ (60) $ (69) $ (5) $ 210 $ 133 $ III $ 111 $ 142 $ 70 $ 80 $ 349 - (87) (87) (100) (38) (15) 23 43 78 132 75 24 0. - - - - - - - - - - - 0 - - - - - - - - - - - - 0 (374) $ (147) $ (1 56) $ (105) $ 172 $ 118 $ 134 $ 154 $ 220 $ 202 $ 155 $ 373 Summary of Utility Funds - Net change to fund balance Surplus(Deficit) 601 - Water Fund (1,080) (648) (467) (449) (590) (584) (1,142) (287) (947) 20 1 (6,172) 602 - Sewer Fund (839) (1,348) (1,248) (1,246) (1,110) (1,083) (1,077) (1,032) (1,087) (854) (680) (11,603) 675 -Storm Water Fund (466) (375) (365) (353) (349) (331) (338) (322) (283) (267) (269) (3718) Total (2,385) (2,371) (2,080) (2,048) (2,048) (1,998) (2,5572 (1,640) (2,316) (1,100) (948) (21,492) -74- General Fund and Special Levy Projections Long Term Financial Plan - 2029 - 2039 1) n2.5% Growth in General Fund Revenue Levy per year for operations - Goal to keep City Tax Rate at or below 45%, minimize utility rate increases. Assumes 2% increase to Tax Capacity per year after 2018, but actual should be higher when TIF Districts Decertify ''r CI7TMy OF MO j,� TIF 1-2 - 2026, TIF 1-3 - 2031 Trident Housing TIF - 2019 - 2029 (did a one time 8% increase to Tax Capacity in 2029) 2) 2% increase to total levy, excess from retired debt to capital project funds/reserves/interfund loans In $000's BEG 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 END Tax Levies General Fund Rev Levy - Ops +2.5% $ 4,330 $ 4,438 $ 4,549 $ 4,662 $ 4,779 $ 4,898 $ 5,021 $ 5,146 $ 5,275 $ 5,407 $ 5,542 Total Funding Sources - Levy $ 7,724 $ 7,878 $ 8,036 $ 8,197 $ 8,361 $ 8,528 $ 8,698 $ 8,872 $ 9,050 $ 9,231 $ 9,416 %Change 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% 2.0% ( C) Total Avail - Capital Proj Funds $ 2,580 $ 2,660 $ 2,704 $ 3,113 $ 3,158 $ 3,204 $ 3,882 $ 3,929 $ 3,976 $ 4,023 $ 4,070 Alloe/Transfers to Capital Project Funds Repayment of Interfund Loans $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Capital Replacement Fund - Vehicl 0 300 300 300 300 300 300 300 300 300 300 300 3300 Capital Replacement Fund - Bldg 0 £75 175 175 175 175 175 175 175 175 175 175 1925 Community Investment Fund 0 160 160 160 160 160 160 160 160 160 160 160 1760 Street Imp/IRRF/MSA 0 $ 1,945 $ 2,025 $ 2,069 $ 2,478 $ 2,523 $ 2,569 $ 3,247 $ 3,294 $ 3,341 $ 3,388 $ 3,435 $ 30,314 Total Transfers/Copital Project Relates $ - $ 2,580 $ 2,660 $ 2,704 $ 3,113 $ 3,158 $ 3,204 $ 3,882 $ 3,929 $ 3,976 $ 4,023 $ 4,070 $ 37,299 EXPENDITURES Capital Project Funds Interfund Loans $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Capital Replacement Fund - Vehicl 0 2 182 432 182 182 347 2 200 200 200 200 2129 Capital Replacement Fund - Bldg 0 175 175 175 175 175 175 175 175 175 175 175 1925 Community Investment Fund 0 160 160 160 160 160 160 160 160 160 160 160 1760 Street Imp/IRRF/MSA 0 2552 4305 3540 153 145 372 194 212 2462 1785 1802 $ 17,522 Total Expenditures Capital Project Rel $ - $ 2,889 $ 4,822 $ 4,307 $ 670 $ 662 $ 1,054 $ 531 $ 747 $ 2,997 $ 2,320 $ 2,337 $ 23,336 NET Capital Project Funds Interfund Loans $..... - $ - Capital Replacement Fund - Vehicl 0 298 Capital Replacement Fund - Bldg 0 - Community Investment Fund (Park 0. - Street Imp/IRRF/MSA 0 (607 Net Capital Project Related $. , $ (309 $ - $ - $ - $ 118 (132) 118 118 (47) 298 100 100 100 100 1,171 $ 979 $ 1,703 $ 1,733 $ Summary of Utility Funds -Net change to fund balance Surplus(Deficit) - All milty funds will have negative fund balances that need to be replenished 601 - Water Fund 139 254 430 406 410 468 540 678 785 877 913 5,901 602- Sewer Fund 336 437 637 707 826 974 1,143 1,285 1,459 1,621 1,733 11,159 675 -Storm Water Fund (303) (200) (140) (138) (109) (76) (39) (7) 23 48 48 (889) Total 172 492 928 975 1,128 1,366 1,645 1,957 2,267 2,547 2,694 16,171 -75- Funding Sources Charges for Services Proceeds from Sale of Bonds Other - Transfers Interest on Investments Total Funding Sources Expenditures Non-Captial Expenditures Operating Expenses Debt Service - Prin & Interest Depreciation (MEMO) Transfers Subtotal Non -capital Expenditures Future Debt Service Carnal Exnenditures - Infrastructure Long Term Financial Plan - 2018 - 2028 Rev +0%, Op Exp +2.5% Enterprise Fund: Water Fund In $000's 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 _0 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 657 $ 673 $ 690 $ 707 $ 725 $ 743 $ 762 $ 781 $ 800 $ 820 $ 841 1530 1553 1529 1501 .1496 1471 1485 1461 1401 1114 1111 755 778 791 805 825 845 891 895 934 938 941 0 0 0 0 0 0 0 0 0 0 0 $ 2,187 $ 2,227 $ 2,219 $ 2,208 $ 2,221 $ 2,214 $ 2,247 $ 2,242 $ 2,202 $ 1,934 $ 1,951 $ 920 $ 452 $ 278 $ 272 $ 399 $ 400 $ 925 $ 75 $ 775 $ 76 $ 78 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Infrastructure $ 920 $ 452 $ 278 $ 272 $ 399 $ 400 $ 925 $ 75 $ 775 $ 76 $ 78 Carnal Exnenditures- Vehicles & Equi $ 4 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Vehicles $ 4 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Expenditures $ 3,110 $ 2,678 $ 2,497 $ 2,479 $ 2,620 $ 2,614 $ 3,172 $ 2,317 $ 2,977 $ 2,010 $ 2,029 Surplus (deficiency) of funding sources over (under) expenditures $(1,080) $ (648) $ (467) $ (449) $ (590) $ (584) $(1,142) $ (287) $ (947) $ 20 $ 1 Beginning Fund Balance $(1,572) $(2,652) $(3,300) $(3,767) $(4,216) $(4,806) $(5,390) $(6,532) $(6,819) $(7,766) $(7,745) Ending Fund Balance $(2,652) $(3,300) $(3,767) $(4,216) $(4,806) $(5,390) $(6,532) $(6,819) $(7,766) $(7,745) $(7,744) -76- Expenditures Non-Camial Expenditures Operating Expenses $ 862 $ 884 $ 906 $ 928 $ 952 $ 975 $ 1,000 $ 1,025 $ 1,050 $ 1,077 $ 1,103 Debt Service - Prin & Interest 1019 878 686 690 654 579 484 313 117 0 0 Depreciation (MEMO) Transfers 0 0 0 0 0 0 0 0 0 0 0 Subtotal Non -capital Expenditures $ 1,881 $ 1,762 $ 1,592 $ 1,618 $ 1,606 $ 1,554 $ 1,484 $ 1,338 $ 1,167 $ 1,077 $ 1,103 Future Debt Service Caotial Exnenditures - Infrastructure Long Term Financial Plan - 2029 - 2039 6 Rev +0%, OF Exp +15% $ 8 $ 6 Enterprise Fund: Water Fund 14 $ 8 $ 6 $ 14 $ In $000's $ 76 $ 14 0 0 rnv of mouma 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 Funding Sources 0 0 0 0 Charges for Services $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 Proceeds from Sale of Bonds 0 0 0 0 0 0 0 0 0 0 0 Other - Transfers 0 0 0 0 0 0 0 0 0 0 0 Interest on Investments 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 $ 2,030 Expenditures Non-Camial Expenditures Operating Expenses $ 862 $ 884 $ 906 $ 928 $ 952 $ 975 $ 1,000 $ 1,025 $ 1,050 $ 1,077 $ 1,103 Debt Service - Prin & Interest 1019 878 686 690 654 579 484 313 117 0 0 Depreciation (MEMO) Transfers 0 0 0 0 0 0 0 0 0 0 0 Subtotal Non -capital Expenditures $ 1,881 $ 1,762 $ 1,592 $ 1,618 $ 1,606 $ 1,554 $ 1,484 $ 1,338 $ 1,167 $ 1,077 $ 1,103 Future Debt Service Caotial Exnenditures - Infrastructure -77- $ 6 $ 14 $ 8 $ 6 $ 14 $ 8 $ 6 $ 14 $ 78 $ 76 $ 14 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Infrastructure $ 6 $ 14 $ 8 $ 6 $ 14 $ 8 $ 6 $ 14 $ 78 $ 76 $ 14 Captial Expenditures - Vehicles & Equip $ 4 $ - $ - $ - $ - $ - $ - $ $ $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Vehicles $ 4 $ - $ - $ - $ - $ - $ - $ - $ - $ $ - Total Expenditures $ 1,891 $ 1,776 $ 1,600 $ 1,624 $ 1,620 $ 1,562 $ 1,490 $ 1,352 $ 1,245 $ 1,153 $ 1,117 Surplus (deficiency) of funding sources over (under) expenditures $ 139 $ 254 $ 430 $ 406 $ 410 $ 468 $ 540 $ 678 $ 785 $ 877 $ 913 Beginning Fund Balance $(7,744) $(7,605) $(7,351) $(6,920) $(6,515) $(6,104) $(5,636) $(5,096) $(4,418) $(3,633) $(2,756) Ending Fund Balance $(7,605) $(7,351) $(6,920) $(6,515) $(6,104) $(5,636) $(5,096) $(4,418) $(3,633) $(2,756) $(1,843) -77- CrrY OF MOUND Funding Sources Charges for Services Proceeds from Sate of Bonds Other - Transfers Interest on Investments Total Funding Sources Expenditures Non-Captial Expenditures Operating Expenses MCES Wastewater TXT+5% Debt Service - Prin & Interest Depreciation (MEMO) Transfers Subtotal Non -capital Expenditures Future Debt Service Long Term Financial Plan - 2018 - 2028 Rev +3%, Op Exp +2.5%, MCES +5% Enterprise Fund: Sewer Fund In $000's 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 $ 2,266 $ 2,334 $ 2,404 $ 2,476 $ 2,550 $ 2,627 $ 2,706 $ 2,787 $ 2,871 $ 2,957 $ 3,045 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 2,266 $ 2,334 $ 2,404 $ 2,476 $ 2,550 $ 2,627 $ 2,706 $ 2,787 $ 2,871 $ 2,957 $ 3,045 $ 619 $ 634 $ 650 $ 667 $ 683 $ 700 $ 718 $ 736 $ 754 $ 773 $ 792 837 879 923 969 1017 1068 1122 1178 1237 1298 1363 745.5 752.8 753.6 749.5 750 750 725.3 639.2 630 619 625 615 653 685 716 740 761 783 806 831 845 850 0 0 0 0 0 0 0 0 0 0 0 $ 2,202 $ 2,919 $ 3,012 $ 3,101 $ 3,190 $ 3,280 $ 3,348 $ 3,359 $ 3,452 $ 3,535 $ 3,630 Caotial Expenditures - Infrastructure Lift Station Rehabilitation $ 625 $ 553 $ 431 $ 411 $ 365 $ 325 $ 330 $ 355 $ 400 $ 170 $ 30 Sewer Forcemain Film/Lining 250 210 210 210 105 105 105 105 105 105 65 Subtotal Capital Exp - Infrastructure $ 875 $ 763 $ 641 $ 621 $ 470 $ 430 $ 435 $ 460 $ 505 $ 275 $ 95 Carnal Exnenditures - Vehicles & Eaui $ 14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Vehicles & Ege $ 14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Total Expenditures $ 3,105 $ 3,682 $ 3,652 $ 3,722 $ 3,660 $ 3,710 $ 3,783 $ 3,819 $ 3,957 $ 3,810 $ 3,725 Surplus (deficiency) of funding sources over (under) expenditures $ (839) $(1,348) $(1,248) $(1,246) $(1,110) $(1,083) $ (1,077) $ (1,032) $ (1,087) $ (854) $ (680) Beginning Fund Balance $(2,580) $(3,419) $(4,766) $(6,015) $(7,260) $(8,370) $ (9,453) $(10,530) $(11,562) $(12,649) $(13,502) Ending Fund Balance $(3,419) $(4,766) $(6,015) $(7,260) $(8,370) $(9,453) $(10,530) $(11,562) $(12,649) $(13,502) $(14,183) Subtotal Non -capital Expenditures $ 2,753 $ 2,845 $ 2,813 $ 2,909 $ 2,986 $ 3,032 $ 3,066 $ 3,124 $ 3,155 $ 3,234 $ 3,370 Captial Expenditures - Infrastructure Lift Station Rehabilitation $ 15 $ 10 $ 10 $ 20 $ 10 $ 10 $ 10 $ 25 $ 45 $ 40 $ 40 Sewer Forcemain Film/Lining 65 65 65 65 65 65 65 65 65 65 65 Subtotal Capital Exp - Infrastructure $ 80 $ 75 $ 75 $ 85 $ 75 $ 75 $ 75 $ 90 $ 110 $ 105 $ 105 Captial Expenditures - Vehicles & Equ $ 14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Vehicles & Ep $ 14 $ - $ - $ - $ - $ - $ - $ - $ - $ Total Expenditures Long Term Financial Plan - 2029 - 2039 $ 2,888 Rev +5%, Op Exp +2.5%, MCES +5% $ 3,107 $ 3,141 $ 3,214 Enterprise Fund: Sewer Fund 3,339 $ 3,475 In $000's Surplus (deficiency) of funding - 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 Funding Sources $ 437 $ 637 $ 707 $ 826 $ 974 $ 1,143 $ 1,285 $ 1,459 $ 1,621 Charges for Services $ 3,197 $ 3,357 $ 3,525 $ 3,701 $ 3,886 $ 4,081 $ 4,285 $ 4,499 $ 4,724 $ 4,960 $ 5,208 Proceeds from Sale of Bonds 0 0 0 0 0 $(13,847) 0 0 0 0 0 0 Other - Transfers 0 0 0 0 0 $ 0 0 0 0 0 0 Interest on Investments 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources $ 3,197 $ 3,357 $ 3,525 $ 3,701 $ 3,886 $ 4,081 $ 4,285 $ 4,499 $ 4,724 $ 4,960 $ 5,208 Expenditures Non-Captial Expenditures Operating Expenses $ 812 $ 832 $ 853 $ 874 $ 896 $ 918 $ 941 $ 965 $ 989 $ 1,014 $ 1,039 MCES Wastewater TXT +5% 1431 1503 1578 1657 1740 1827 1918 2014 2114 2220 2331 Debt Service - Prin & Interest 510 510 382 378 350 287 207 145 51 0 0 Depreciation (MEMO) 0 0 0 0 0 0 0 0 0 0 0 Transfers 0 0 0 0 0 0 0 0 0 0 0 Subtotal Non -capital Expenditures $ 2,753 $ 2,845 $ 2,813 $ 2,909 $ 2,986 $ 3,032 $ 3,066 $ 3,124 $ 3,155 $ 3,234 $ 3,370 Captial Expenditures - Infrastructure Lift Station Rehabilitation $ 15 $ 10 $ 10 $ 20 $ 10 $ 10 $ 10 $ 25 $ 45 $ 40 $ 40 Sewer Forcemain Film/Lining 65 65 65 65 65 65 65 65 65 65 65 Subtotal Capital Exp - Infrastructure $ 80 $ 75 $ 75 $ 85 $ 75 $ 75 $ 75 $ 90 $ 110 $ 105 $ 105 Captial Expenditures - Vehicles & Equ $ 14 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Vehicles & Ep $ 14 $ - $ - $ - $ - $ - $ - $ - $ - $ Total Expenditures $ 2,861 $ 2,920 $ 2,888 $ 2,994 $ 3,061 $ 3,107 $ 3,141 $ 3,214 $ 3,265 $ 3,339 $ 3,475 Surplus (deficiency) of funding sources over (under) expenditures $ 336 $ 437 $ 637 $ 707 $ 826 $ 974 $ 1,143 $ 1,285 $ 1,459 $ 1,621 $ 1,733 Beginning FundBalance $(14,183) $(13,847) $(13,409) $(12,772) $(12,065) $(11,239) $(10,266) $ (9,122) $ (7,837) $ (6,378) $ (4,757) Ending Fund Balance $(13,847) $(13,409) $(12,772) $(12,065) $(11,239) $(10,266) $ (9,122) $ (7,837) $ (6,378) $ (4,757) $ (3,024) -79- tAl C.IN OF M[tUNn Funding Sources Charges for Services Proceeds from Sale of Bonds Other- Transfers Interest on Investments Total Funding Sources Expenditures Non-Captial Expenditures Operating Expenses Debt Service - Prin & Interest Depreciation (MEMO) Transfers Subtotal Non -capital Expenditures Future Debt Service Long Term Financial Plan - 2018 - 2028 Rev +0%, Op Exp +0% Enterprise Fund: Storm Water Fund In $000's 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 414.7 423.3 413.3 401.5 397.1 379.5 386.7 370 331.5 315.1 317.4 $ 476 $ 484 $ 474 $ 462 $ 458 431 $ 392 $ 376 $ 378 Captial Exnenditures - Infrastructure $ 100 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Infrastructure $ 100 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Captial Expenditures - Vehicles & Equip $ - $ - $ - $ - $ - $ - $ - $ - $ $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Vehicles& Equ $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ Total Expenditures $ 576 $ 484 $ 474 $ 462 $ 458 $ 440 $ 448 $ 431 $ 392 $ 376 $ 378 Surplus (deficiency) of funding sources over (under) expenditures $ (466) $ (375) $ (365) $ (353) $ (349) $ (331) $ (338) $ (322) $ (283) $ (267) $ (269) Beginning Fund Balance $ (596) $(1,062) $(1,437) $(1,802) $(2,155) $(2,504) $(2,835) $(3,173) $(3,495) $(3,778) $(4,045) Ending Fund Balance $(1,062) $(1,437) $(1,802) $(2,155) $(2,504) $(2,835) $(3,173) $(3,495) $(3,778) $(4,045) $(4,314) :m Subtotal Capital Exp - Vehicles& Egu $ Total Expenditures Long Term Financial Plan - 2029 - 2039 $ 309 $ 249 Rev +0%, Op Exp +0% $ 185 $ 148 $ 116 $ 86 $ 61 $ 61 Enterprise Fund: Storm Water Fund Surplus (deficiency) of funding In $000's sources over (under) expenditures $ (303) $ (200) $ (140) $ (138) $ (109) $ (76) $ (39) $ (7) $ 23 $ 48 $ 48 Beginning Fund Balance $(4,314) aTv of mouup 2029 $(4,956) 2030 2031 $(5,278) 2032 $(5,323) 2033 $(5,251) 2034 2035 $(4,817) 2036 $(5,094) 2037 $(5,278) 2038 $(5,323) 2039 Funding Sources $(5,203) Charges for Services $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 Proceeds from Sale of Bonds 0 0 0 0 0 0 0 0 0 0 0 Other - Transfers 0 0 0 0 0 0 0 0 0 0 0 Interest on Investments 0 0 0 0 0 0 0 0 0 0 0 Total Funding Sources $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 $ 109 Expenditures Non-Captial Expenditures Operating Expenses $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 $ 61 Debt Service - print & Interest 251.3 248 188 186 157 124 87 55 25 0 0 Depreciation (MEMO) Transfers Subtotal Non -capital Expenditures $ 312 $ 309 $ 249 $ 247 $ 218 $ 185 $ 148 $ 116 $ 86 $ 61 $ 61 Future Debt Service Captial Expenditures - Infrastructure $ 100 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Subtotal Capital Exp - Infrastructure $ 100 $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - Captial Expenditures - Vehicles & Equip 0 Subtotal Capital Exp - Vehicles& Egu $ Total Expenditures $ 412 $ 309 $ 249 $ 247 $ 218 $ 185 $ 148 $ 116 $ 86 $ 61 $ 61 Surplus (deficiency) of funding sources over (under) expenditures $ (303) $ (200) $ (140) $ (138) $ (109) $ (76) $ (39) $ (7) $ 23 $ 48 $ 48 Beginning Fund Balance $(4,314) $(4,617) $(4,817) $(4,956) $(5,094) $(5,202) $(5,278) $(5,317) $(5,323) $(5,300) $(5,251) Ending Fund Balance $(4,617) $(4,817) $(4,956) $(5,094) $(5,202) $(5,278) $(5,317) $(5,323) $(5,300) $(5,251) $(5,203) Stre� atached uIe M M 0 Street Pavement Designation Area Pelican Pt (SY) ]000 Constructed/ ANTIOPATED Last Recon RECON/RP 1995 2031 MM 2018 2019 2020 CS2 IM 2021 SC 2022 2023 2024 2025 2026 CR 2027 2028 2029 2030 2031 2032 �M34 2035 2036 1"M 2037 SA 2039 'Sag 2043 2044 2045 2046 2047 2048 2049 2050 RP 61 SC 62 SC Unit at(/S') RP $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 $0.50 $1.75 Cost Schedule $3,500 $12,250 $3,500 $259,000 $2,100 $12,250 $3,500 $12,250 Marlon/Old Sh 3900 1990 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/Afi$32.00 Unit mat(/S') #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/AA Cost Schedule #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/AA Auditor/Maple 1300 1998 #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/AA Unit mat(/SY) #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/AA Cost Schedule #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A #N/A No-oodln 1500 1999 2029 CS2 SC CS2 Recon 61 SC 62 SC Unit mat(/S') RECON $0.50 $1.75 $0.50 $60.00 $0.30 $1.75 $0.50 $1.75 Cost Schedule $750 $2,625 $750 $90,000 $450 $2,625 $750 $2,625 $48,000 Sugar Mill Arec 14000 2001 2031 CS2 SC CS2 RP 61 SC CS2 SC Unit Coat (/S') RP $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 $0.50 $1.75 Cost Schedule $7,000 $24,500 $7,000 $518,000 $4,200 $24,500 $7,000 $24,500 2003 Area 10500 2003 2029 CS2 SC CS2 Recon GIL SC C52 SC MO Unit Coat (/S') RECON $0.50 $1.75 $0.50 $60.00 $0.30 $1.75 $0.50 $1.75 $32.00 Cost Schedule $5,250 $18,375 $5,250 $630,000 $3,150 $18,375 $5,250 $18,375 $336,000 2004 Area 28000 2004 2029 CS2 SC CS2 Recon GIL SC C52 SC MO Unit Coat (/S') RECON $0.50 $1.75 $0.50 $60.00 $0.30 $1.75 $0.50 $1.75 $32.00 Cost Schedule $14,000 $49,000 $14,000 $1,680,000 $8,400 $49,000 $14,000 $49,000 $896,000 2005 Area 71000 2005 2030 CS2 SC CS2 Recon GIL SC C52 SC MO Unit Coat (/S') RECON 1 $0.50 $1.75 $0.50 $60.00 $0.30 $1.75 $0.50 $1.75 $32.00 Cost Schedule $35,500 $124,250 $35,500 $4,260,000 $21,300 $124,250 $35,500 $124,250 1 ######## 2006 Area 44000 2006 2031 CS2 SC CS2 Recon C51 SC CS2 SC Unit Coat (/S') RECON $0.50 $1.75 $0.50 $60.00 $0.30 $1.75 $0.50 $1.75 Cost Schedule $22,000 $]],000 $22,000 $2,640,000 $13,200 $]],000 $22,000 $]],000 2007 Area 64000 2007 2037 CS2 SC CS2 SC C52 RP C51 SC CS2 SC Uhit Coat(/S') RP $0.50 $1.75 $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 $0.50 $17 Cost Schedule $32,000 $112,000 $32,000 $112,000 $32,000 $2,368,000 $19,200 $112,000 $32,000 $112,000 2008 Area 47000 2008 2038 CS2 SC CS2 SC C52 RP C51 SC CS2 Uhit Coat(/S') RP $0.50 $1.75 $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 $0.50 Cost Schedu Is $23,500 $82,250 $23,500 $82,250 $23,500 $1,739,000 $14,100 $82,250 $23,500 2009 Area 45000 2009 2039 CS2 SC CS2 SC C52 RP C51 SC Unit Coat (/S') RP $0.50 $1.75 $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 Cost Schedule $22,500 $]8,]50 $22,500 $]8,]50 $22,500 $1,665,000 $13,500 $]8,]50 IVO Concrete 7000 2009 CS2 CS2 CS2 CR C51 CS2 C52 Unit Coat (/S') CONCRETE $0.50 $0.50 $0.50 $30.00 $0.30 $0.50 $0.50 Cost Schedule $3,500 $3,500 $3,500 $210,000 $2,100 $3,500 $3,500 2011 Area 55000 2011 2041 C52 SC C52 SC C4 RP C51 SC Unit Coat (/S') RP $0.50 $1.75 $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 Cost Schedule $27,500 $96,250 $27,500 $96,250 $27,500 $2,035,000 $16,500 $96,250 2012 Area 49000 2012 2042 CS2 SC C52 SC CS2 RP C51 SC Unit Coat (/S') RP $0.50 $1.75 $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 Cost Schedule $24,500 $85,750 $24,500 $85,750 $24,500 $1,813,000 $14,700 $85,750 2013 Area 56000 20131 2043 1 1 CS2 SC C52 SC C52 RP C51 SC Unit Coat (/S') RP $0.50 $1.75 $0.50 $1.75 $0.50 $37.00 $0.30 $1.75 Cost Schedule $28,000 $98,000 $28,000 $98,000 $28,000 $16,800 $98,000 2014 Area M 22000 2014 2044 SC CS2 SC C52 SC C52 C51 SC Unit Coat (/S') RP $1.75 $0.50 $1.75 $0.50 $1.75 $0.50 ].00 $0.30 $1.75 Cost Schedule $38,500 $11,000 $38,500 $11,000 $38,500 $11,000 ,000 $6,600 $38,500 2015 Area M 19900 2015 2045 C51 SC CSL SC C52 SC C52RP C51 SC Unit at (/SY) RP $0.30 $1.75 $0.50 $1.75 $0.50 $1.75 $0.50$3].00 $0.30 $1.75 Cost Schedule $5,970 $34,825 $9,950 $34,825 $9,950 $34,825 $9,950$T36,300 $5,970 $34,825 2016 Area M 29500 2016 2046 C51 SC CS2 SC C52 SC C52RP C51 Unit Coat (/S') RP $0.30 $1.]5 $0.50 $1.]5 $0.50 $1.]5 $0.50$3].00 $0.30 Cost Schedule $8,850 $51,625 $14,]50 $51,625 $14,]50 $51,625 $14,]50$1,091,500 $8,850 2017 Area M 3]000 201] 204] C51 SC CS2 SC C52 SC C52RP E$76 Unit Coat (/S') RP $0.30 $1.]5 $0.50 $1.]5 $0.50 $1.]5 $0.50$3].00 Cost Schedule $11,100 $64,]50 $18,500 $64,]50 $18,500 $64,]50 $18,500$1,369,000 Wes[edge Bl vd 10000 2018 2048 NCMS C51 SC CS2 SC CS2 SC RPUnit.st(/S') RP $65.00 $0.30 $1.]5 $0.50 $1.]5 $0.50 $1.]5 $3].00 CostSchedule $650,000 $3,000 $1],500 $5,000 $1],500 $5,000 $1],500 $3]0,000 2019 2019 Recon C51 SC C52 SC MO RP Unit.st(/S') RECON $60.00 $0.30 $1.]5 $0.50 $1.]5 $32.001.]5 $3].0CostSchedule $234,000 $1,1]0 $6,825 $1,950 $6,825 $124,800 ,825 $144,300 EM Repeat eslmate of $600,000 to$700,000(Induding soft costs; Towers 3yreetdean 10 year Intoner Inspect and rehab 15-20 year repeat Wells 10 year Inspect and rehab Em Yes r Conchtru LastRepen 2018 2019 202INE 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 20JES 2036 2037 20381MEN 2042 2043 2044INEEMEN --------- --------- --------- -- --------- --------- --------- --- ---------------------------------- --------------------------------- ---------------------------------- -------------------------------- ---------------------------------- -------------------------------- ---------------------------------- ---------------------------------- ---------------------------------- ---------------------------------- ------- ------------------------- ---------------------------------- ------- ------------------------- ---------------------------------- ------- ------------------------- ---------------------------------- ---- ---------------------------- ---------------------------------- ----- --------------------------- To[al $919,700 $931,300 $277,700 $2J 1,700 $39$900 $900,900 $723,000 $273,000 $776,000 $76,000 $77,600 $6,000 $13,300 $7,300 $6,000 $13,300 $7,300 $6,000 $13,300 $77,600 $76,000 $13,300 $7,300 $6,000 $13,300 $7,300 $636,000 $7,300 $700,000 $76,000 $77,600 $6,000 $13,300 Repeat eslmate of $600,000 to$700,000(Induding soft costs; Towers 3yreetdean 10 year Intoner Inspect and rehab 15-20 year repeat Wells 10 year Inspect and rehab Em Sanitary & LI&Staton Asset Inventory IMMEMor LaYear Con strusteMMMMMMMMMMMME Recoo/ 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 2036 2037 2038 2039 2040 2041 2042 2043 2044 2045 2046 2047 2048 M Replace Pumps Every -15 years Generator Swaps" 25 years EM City of Mound - Public Works Vehicle Replacement Plan Unit # Dept Year Make Model VIN # Replace Cost 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 217 Parks 2017 Ford F350 Pickup 37,000 37,000 415 Parks 2015 Ford F150 Pickup 245 35,000 35,000 416 Parks 2016 Ford F350 4x4 4828 42,000 42,000 1504 Parks 2004 Ford F350 4x4 7052 75,000 75,000 210 Parks 2010 Ford F 550 w/box,plow,accessories 6018 90,000 90,000 209 Parks 2009 Ford F 550 w/box,plow,accessories 9585 90,000 90,000 105 Sewer 2005 Ford E350(Camera Van) 0192 52,000 52,000 214 Sewer 2014 Freightliner SD114 JetVac 345,000 1604 Sewer 2004 Sterling Acterra Dump Trk 2974 155,000 155,000 217 Sewer 2017 Ford F 450 Sewer Service trk 90,000 90,000 312 Street 2012 Freightliner 108SD Dump Truck 9013 w/Plow, Wing, and Sander 180,000 313 Street 2013 Freightliner 108SD Dump Truck 3145 w/Plow, Wing, and Sander 180,000 412 Street 2012 Freightliner 108SD Dump Truck 8231 w/Plow, Wing, and Sander 180,000 314 Street 2012 Freightliner 108SD Dump Truck 2375 w/Plow, Wing, and Sander 180,000 112 Street 2011 Ford F550 One Ton Dump 3801 80,000 80,000 504 Street 2004 Ford F550 w/Aerial Lift 7307 175,000 175,000 515 Street 2015 Ford F550 One Ton Dump 3840 80,000 80,000 109 Street 2009 Ford F450 Street Service Truck 9584 85,000 309 Street 2009 Ford F 350 Pick-up replacing with 1443 Ford F550 90,000 90,000 605 Street 2004 Sterling Tandem Dump sold in 2017 replacing with F550 90,000 90,000 Em Cost 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 207 Water 2007 Dodge Dakota Pick up 40,000 40,000 512 Water 2013 Ford F-350 Pick-up 9698 45,000 45,000 113 Water 2012 Ford F-150 Pick-up 2111 45,000 45,000 316 Water 2016 Ford F-150 Pick-up 0185 45,000 45,000 315 Water 2012 Ford F-150 Pick-up 4698 45,000 45,000 OR Streets 2004 Tymco 600 Street Sweeper 250,000 OR Streets 2005 Elgin Pelican Street Sweeper 240,000 240,000 OR Streets 2001 Cat smooth drum roller 65,000 65,000 ME Streets 2016 Crosswalk painter w/trailer 9,000 9,000 ME Streets 2006 Tenant M6650 Power Sweeper 25,000 25,000 OR Parks 2011 Bobcat T190 Track Loader 38,000 38,000 ME Parks 2004 Bandit Brush Clipper 27,000 27,000 OR Parks 2006 John Deere Loader 225,000 225,000 OR Parks 2004 John Deere series 1565 mower 70,000 OR Parks 1997 John Deere 55BP Flale Mower ? No Rer 75,000 OR Parks 2013 Toro Groundmaster 4000D Mower 58,000 58,000 OR Parks 2014 Toro zero Turn Mower w/bagger 14,000 16,000 OR Parks 2014 Toro Stand -on Mower 5,800 8,000 OR Parks 2014 Toro Stand -on Mower 5,800 8,000 OR Parks 2005 John Deere Gator 40,000 40,000 OR Streets 2017 Asphalt Bot Box 38,000 38,000 OR =Off Road TOTAL 180,000 292,000 292,000 305,000 243,000 220,000 182,000 162,025 127,026 73,027 130,028 ME =Mobile Equip Parks and Open Spaces Commission Budget Plan Priorities Captial Budget Plan Priorities Priority Estimated Cost S•1401P MRgtP- DIRK Funded 2018 20,000.00 Repl..,.,.Metal ..1......4...,.4..Fe at 98FI3 . PRFk 2018 - Park Ded. Fur 30,000.00 Repl..,.e FetaiRi..,.Wall .FeaS a.,.....a 98FI3 . Pla. ' Fea 2018 Ret Wall Proj 5,000.00 Add 3 grills and picnic areas, enhance 2 existing at Surfside 8,000.00 Replace wooden play structure at Surfside 75,000.00 JayCees sunshade at Surfside (by others) 35,000.00 Create formal separation between launch area and beach at Surfside 10,000.00 Expand edibles activities at Three Points Ongoing 3,000.00 Interpretation signs for edibles at Three Points Ongoing 500.00 Remove/repair/repurpose tennis court area at Three Points 125,000.00 FiX dFaiRage 0661... HPIP........v4 OR 9114 0PIGI RFPR R4 T-hFP.. PSiRtS (Dai.. (;aFd R) Complete 4A Steel fire ring at end of Crescent Park Trail 200.00 Improve screening at Lift Station, add back -screen for port -a -let at Philbrook Park 500.00 Picnic/bbq area at Philbrook 2,500.00 Sun Shade Structure at Philbrook Park 7,000.00 Reps.,,, c...ORO .t SgFla . PRFk 2018 - Park Ded. Fur 8,000.00 Replace wooden play structure at Dundee Park 30,000.00 Replace wood perimeter edging at Dundee Play Structure 2,000.00 Replace wood play structure at Chester Park 30,000.00 Replace Tennis Court at Swenson Park Pending MCES - Park 200,000.00 Shoreline restoration at Bluffs Beach Dedication Funds 5,000.00 Shoreline Restoration at Lost Lake TBD Replace wood play structure at Avon Park 30,000.00 Enhance Shoreline Vegetation at Carlson Park Enhance Shoreline Vegetation at Highland End Park Tree Sale 10,000.00 Surfside Interior Painting (Carpet wall treatment removal) 5,000.00 Surfside Depot Kitchen/service Area Renewal 5,000.00 Surfside Depot Flooring Replacement Vinyl Plank 6,000.00 Surfside Bathroom furnish/fixture Renewal 2,000.00 SUBTOTAL 654,700.00 Forthcoming Construction Restoration: Post -construction restoration at Tyrone Park; minimal impact Post -construction restoration at Avon Park; leveling, topsoil, turf Post -construction restoration at Swenson Park; leveling, topsoil, turf, b -ball ct, tennis ct prep Post -construction restoration at Doone Park; leveling, topsoil, turf Relocate lift station at Avalon Park; leveling, topsoil, turf, lakeshore restoration companion work Purchases from Operations and Maintenance Budget Priority Trash Bin upgrades for more prominent locations with present barrel bins (collector parks) 8 in 2018 Dog stations at high -use parks (Highland, Sorbo, Three Points, Swenson, Weiland) Ball Field Lime Amendments, 3 -yr cycle (Swenson, Philbrook, Tyrone, Three Points) Play Ground Pad Mulch Amendments (2 -yr cycle) Replace dead trees at Alwin Park Replace dead trees at Crescent Park Replace plantings and ground cover at C.R. 15 entry Shade tree canopy at play areas New CommunityAmenities to Consider - locations TBD: Priority Dog Park??? Single or distributed locations? Doone wooded hill, fetch pen, agili 2019? Frisbee Golf Goals at various locations Canoe or kayak racks at park locations (through Dock Program) Garden Plot areas Capital Equipment Needs: Priority Plug Aerator 1 Spike Aerator/rotary hoe 4 Thatch/heavy tine Rake 2 Drop Spreader 5 Broadcast Spreader 3 Tank Sprayer Estimated Cost 500 ea 350 ea 500 each 2,500.00 500.00 500.00 2,500.00 1500 each Estimated Cost 3000-20000 200 ea, 1500 9 -pc Estimated Cost